ML20154P911
| ML20154P911 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 05/13/1988 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mcdonald R GEORGIA POWER CO. |
| Shared Package | |
| ML20154P914 | List: |
| References | |
| NUDOCS 8806060118 | |
| Download: ML20154P911 (2) | |
See also: IR 05000424/1988017
Text
'.
'
.0%NO
'
//
May 13, 1988
Docket No. 50-424
License No. NPF-68
Georgia Power Company
ATTN: Mr. R. P. Mcdonald
Executive Vice President -
Nuclear Operations
P. O. Box 4545
,
Atlante, GA 30302
Gentlemen:
SUBJECT:
(NRC INSPECTION REPORT NO. 50-424/88-17)
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
Messrs. J. F. Rogge, C. A. Patterson, and C. W. Burger on March 25 - April 29,
1988.
The inspection included a review of activities authorized for your
Vogtle facility.
At the conclusion of the inspection, the findings were
discussed with those members of your staff identified in the enclosed
inspection report.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
The inspection findings indicate that certain activities violated NRC
requi rerrents .
The violation, references to pertinent requirements, and
elements to be included in your response are presented in the enclosed Notice
of Violation.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosure
will be placed in the NRC Public Document Room.
j
The response directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Budget issued under the
l
Paperwork Reduction Act of 1980, PL 96-511.
I
l
8806060118 880513
\\
PDR ADOCK.D5000424
'O
- DCD
,
_
_ _ - _
.
.
.
Georgia Power Company
2
May 13, 1988
<
Should you have any questions concerning this letter, please contact us.
Sincerely,
Original Signed by
Virgil L. Brownlee
Virgil L. Brownlee, Chief
Reactor Projects Branch 3
Division of Reactor Projects
Enclosures:
1.
2.
Inspection Report
cc w/encls:
P. D. Rice, Vice President, Project
Director
C. W. Hayes, Vogtle Quality
Assurance Manager
G. Bockhold, Jr., General Manager,
Nuclear Operations
L. Gucwa, Manager, Nuclear Safety
and Licensing
J. A. Bailey, Project Licensing
Manager
B. W. Churchill, Esq., Shaw,
Pittman, Potts and Trowbridge
D. Kirkland, III, Counsel,
Office of the Consumer's Utility
Council
D. Feig, Georgians Against
Nuclear Energy
bec w/encls:
E. Reis, 0GC
J. Hopkins, NRR
M. Sinkule, RII
DRS Technical Assistant
NRC Resident Inspector
Document Control Desk
State of Georgia
RII
RII
RII
tterson:dd
M
le
VBr wnlee
pwee
se,ee
swee
_
-- -