ML20154P846
| ML20154P846 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 05/16/1988 |
| From: | Verrelli D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Nauman D SOUTH CAROLINA ELECTRIC & GAS CO. |
| Shared Package | |
| ML20154P851 | List: |
| References | |
| NUDOCS 8806060096 | |
| Download: ML20154P846 (2) | |
See also: IR 05000395/1988010
Text
__- _ _ _
_
.
,
'
,.
.
.
AIAY 161988
m
s-s
Docket No. 50-395
,
License No. NPF-12
South Carolina Electric and Gas Company
ATTN: Mr. D. A. Nauman
Vice President, Nuclear Operations
P. O. Box 88 (167)
Jenkinsville, SC 29065
,
Gentlemen:
SUBJECT: NOTICE OF VIOLATION
(NRC INSPECTION REPORT N0. 50-395/88-10)
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
R. L. Prevatte on April 1-30, 1988.
The inspection included a review of
activities authorized for your V. C. Summer Nuclear Facility.
At the
conclusion of the inspection, the findings were discussed with those members of
your staff identified in the enclosed report.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
.
The inspection findings indicate that certain activities appeared to violate
NRC requirements.
The violations, references to pertinent requirements, and
elements to be included in your response are described in the enclosed Notice
of Violation. Th!s violation is similar to a violation contained in the Notice
sent to you by our letter dated October 15, 1987.
Because "similar
violations," as described in the NRC Enforcement Policy, are of significant
concern to the NRC, please give particular attention in your response to the
identification of the root cause of this problem and your corrective action to
prevent recurrence.
The inspection findings also indicate that certain other activities appeared
to violate NRC requirements.
However, because all of the criteria for
categorization of licensee-identified violations were met, the violation is
not being cited.
The details pettaining to the licensee-identified violation
are described in the enclosed Inspection Report.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
-The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, Pub. L. No.96-511.
I
\\\\
I
C806060096 880516
]DR
ADOCK 050CCg5_
ffq
-
..
..
'
.
.
.
SULY 1 e gggg
-South Carolina Electric and Gas Company
2
-
.
Should you have any questions concerning this letter, please contact us.
Sincerely,
URIGINAt. SIGNED BY
DA0/ID At ,ERRElli
David M. Verrelli, Chief
Reactor Projects Branch 1
Division of Reactor Projects
Enclosures:
1.
2.
NRC Inspection Report
cc w/encls:
0. S. Bradham, Director, Nuclear Plant
Operations
J. B. Knotts, Jr.
Bishop, Cook, Purcell & Reynolds
W. A. Williams, Jr., Special
Assistant, Nuclear Operations -
Santee Cooper
A. R. Koon, Jr., Manager
Nuclear Licensing
R. E. Rainear, Executive Vice President
South Carolina Public Service Authority
,
bec w/encis:
NRC Resident Inspector
DRS, Technical Assistant
.
J. J. Hayes, Project Manager, NRR
Document Control Desk
State of South Carolina
,
,
,
,',6
f,/
94 0
Svias:lb
LMode60s
HDance
05/ b/88
05//3/88
05/g3 /88
t
,
.
.
.
.
.
.
-
.
-
. .
.
.
.
.