ML20154P757
| ML20154P757 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 05/16/1988 |
| From: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Utley E CAROLINA POWER & LIGHT CO. |
| References | |
| NUDOCS 8806060068 | |
| Download: ML20154P757 (1) | |
Text
.. -
g
~
MAY 10 m Docket No. 50-324 l
-License No. DPR-62 C rolina Power and Light' Company A
M TTN: Mr. E. E. Utley Senior Executive Vice President-Power Supply and. Engineering and Construction P. O. Box 1551 Raleigh, NC 27602 Gentlemen:
SUBJECT:
ENFORCEMENT DISCRETION - BRUNSWICK UNIT 2 This -letter confirms the telephone conversation between David Verrelli, Region II, and Dennis Cooper, Brunswick Shift Operations Supervisor, on May 13, 1988, in which Region II exercised one-time enforcement discretion on Brunswick Unit 2.
This authorized until 12:00 noon on May 16, 1988, Unit 2 to change modes with only one suppression pool temperature monitoring alarm channel operable.
This action was in response to your request dated May 13, 1988..
Sincerely, J. Nelson Grace Regional Administrator cc: f. W. Howe, Vice President d.BrunswickNuclearProject R. Dietz, Plant General Manager bec:MCResidentInspector DRS Technical Assistant Document Control Desk State of North Carolina RII]
RI.
R!
R RII V
DVerrelli L yes Adi n
ns rnst 4
05/9 /88 05/ji/88 05/Q/88 05j
/88 054'7/88
~
1 8806060068 890516 lD PDR ADOCK 05000324 j
P DCD pot ;