Discusses Alleged Deficiencies in Facility Instrumentation & Controls Program.Investigation Requested as Well as Response within 45 Days of Receipt of Ltr Addressing Findings & Planned Corrective Actions
ML20154P197
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 05/23/1988
From: Wiggins J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Tiernan J
BALTIMORE GAS & ELECTRIC CO.
References
NUDOCS 8806030247
Download: ML20154P197 (2)


Text

_ _ _. . _

r MAY 13 Lg88 Docket Nos. 50-317 50-318 Baltimore Gas and Electric Company ATTN: Mr. J. - A. Tiernan

.Vice President Nuclear Energy Post Office Box 1475 Baltimore, Maryland 21203 Gentlemen:

Subject:

Alleged Deficiencies in the Calvert Cliffs Nuclear Power Plant Instrumentation and Controls Program This office has received an oral report of alleged deficiencies within the Instrumentation and Controls (I&C) area of the Calvert Cliffs Nuclear Power Plant. The essence of these allegations is that:

I&C drawings do not match the as-built conditions. Specific examples cited include the volume control tank indication in the control room and auxiliary shutdown panel, and that terminal boards are not labeled and terminal numbers do not agree with I&C drawings.

.There has been inadequate / improper review of procedure changes prior to performance of safety-related work. Specifically, during routine surveil-lance of containment pressure transmitters, a technician noted that the l surveillance test procedure referred to an incorrect wire to be lifted and that the technician changed the procedure on the spot and then performed the evolution per the changed procedure without required review.-

Licensee technicians loiter in radiation areas. Specifically, while per-forming surveillance testing on a steam generator level transmitter inside containment, a licensee technician wanted to delay completion of a pro-cedure in order to avoid the possibility of another less attractive work assignment.

Licensee and contractor I&C technicians are inexperienced and generally l have an electrical rather than I&C experience background.

Quality control inspectors are not technically competent to inspect work l

assigned.

l l

OFFICIAL RECORD COPY LIMROTH 232 5/20/88 - 0001.0.0 jb(L

>I

! 05/23/88 ,

l 8806030247 080523 ( \

l PDR ADOCK 05000317 p PDR

e

-Baltimore Gas and Electric Company 2

MAY 231988 You are requested to investigate these matters and ' to provide a written response within 45 days of receipt of this letter-addressing the results of your' findings and planned corrective action and scheduled completion where need for such corrective action is indicated. In addition to the above alleged discrepancies, you are requested to assess. the impact on emergency and/or abnormal. operating procedures which might be affected by the alleged defici-encies between drawings, as-built conditions and the emergency / abnormal opera-ting procedures.

Your cooperation in this matter is appreciated.

Sincerel er;:: SnslbsnedEd WW Jame6T.Wiggins, Chief

. React'or Projects Branch No. 3 cc: h M. Bowman, General Supervisor, Technical Services Engineering T. Magette, Administrator, Nuclear Evaluations Public Document Room (PDR) local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector State of Maryland (2) bec:

! Region I Docket Room (with concurrences)

J. Wiggins, DRP L. Tripp, DRP D. Limroth, DRP P. Wilson, DRP S. McNeil, NRR R. Bores, DRSS RI:DRP R gR RI:DRP

,Limroth/mjd j ,rt p JWiggi 5/f/88 5#3/88 SM)88 0FFICIAL RECORD COPY LIMROTH 232 5/20/88 - 0002.0.0

, 05/23/88 l