ML20154P097
ML20154P097 | |
Person / Time | |
---|---|
Site: | Peach Bottom, Pilgrim, 05000000 |
Issue date: | 04/12/1988 |
From: | Kerr W Advisory Committee on Reactor Safeguards |
To: | Zech L Office of Nuclear Reactor Regulation |
Shared Package | |
ML20154N970 | List: |
References | |
NUDOCS 8806030207 | |
Download: ML20154P097 (1) | |
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M6631999-10-19019 October 1999
[Table view]Forwards Insp Rept 50-277/99-07 & 50-278/99-07 on 990920.No Violations Noted ML20217N8911999-10-15015 October 1999 Forwards Rept of Changes,Tests & Experiments at Pilgrim Nuclear Power Station for Period of 970422-990621,IAW 10CFR50.59(b).List of Changes Effecting Fsar,Encl ML20217F7391999-10-14014 October 1999 Requests Addl Info Re Peach Bottom Atomic Power Station Units 2 & 3 Appendix R Exemption Requests ML20217K9241999-10-14014 October 1999 Forwards Amend 234 to License DPR-56 & Se.Amend Consists of Changes to TS in Response to Application & Suppls ,1001 & 06,which Will Support PBAPS Mod P00507,which Will Install Digital Pr Neutron Mining Sys ML20217F6841999-10-13013 October 1999 Forwards Senior Reactor Operator Initial Exam Repts 50-277/99-302(OL) & 50-278/99-302(OL) Conducted on 990913- 16.All Applicants Passed All Portions of Exam ML20217D3951999-10-13013 October 1999 Forwards Request for Addl Info Re Util 990806 Submittal on USI A-46, Implementation Methodology Used at Pilgrim Nuclear Power Station, Per GL 87-02 ML20217F3021999-10-12012 October 1999 Provides Written Confirmation That Thermo-Lag 330-1 Fire Barrier Corrective Actions at PBAPS Have Been Completed.Ltr Also Confirms Completion of Actions Required by Confirmatory Order Modifying Licenses, ML20217E7451999-10-0808 October 1999 Forwards Response to NRC 990820 RAI Concerning Proposed Alternatives Associated with Third ten-yr Interval ISI Program for Pbaps,Units 2 & 3 ML20217E1581999-10-0808 October 1999 Forwards Insp Rept 50-293/99-05 on 990726-0905.Three Violations Noted & Being Treated as Ncvs.Violations Include Failure to Assure That Design Bases Correctly Translated Into Specifications ML20217C3151999-10-0606 October 1999 Forwards Scenario Package for Pilgrim Nuclear Power Station Nrc/Fema Evaluated Exercise Scheduled for 991207.Without Encl ML20217B7701999-10-0606 October 1999 Submits Corrected Info to NRC 980528 RAI Re Util Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20217B9151999-10-0606 October 1999 Provides Clarifying Info to Enable NRC to Complete Review of License Change Request ECR 98-01802,re Changes Necessary to Support Installation of Digital Pr Neutron Monitoring & Incorporate long-term T/H Stability Solution Hardware ML20217C4141999-10-0606 October 1999 Forwards Response to NRC 981109 RAI Re Resolution of USI A-46 for Pbaps.Proprietary Excerpts from GIP-2,Ref 25 Results of BWR Trial Plant Review Section 8 Also Encl. Proprietary Excerpts Withheld ML20217B3181999-10-0505 October 1999 Advises That Info Submitted in 990712 Application,Which Contained Attachment Entitled, Addl Info Re Cycle Spec SLMCPR for Peach Bottom 3 Cycle 13,dtd 990609, with Affidavit,Will Be Withheld from Public Disclosure ML20217B4051999-10-0505 October 1999 Forwards Amend 233 to License DPR-56 & Safety Evaluation. Amend Changes Minimum Critical Power Ratio Safety Limit & Approved Methodologies Referenced in Core Operating Limits Report ML20217D5591999-10-0505 October 1999 Documents Pilgrim Nuclear Power Station Five Yr Survey of Main Breakwater.Survey Has Determined That Pilgrim Main Breakwater Is Intact & Remains Adequately Constructed to Perform Designed Safety Function ML20217C8051999-10-0505 October 1999 Forwards Proprietary Results of Audiologic Evaluations for Jp Giar,License SOP-10061-3.Attachment Clearly Shows Requirements for Operator Hearing Ability Are Met. Proprietary Info Withheld,Per 10CFR2.790(a)(6) 05000278/LER-1999-004, Forwards LER 99-004-00 Re Multiple Unplanned ESF Actuations During Planned Mod Activities in Main Cr,Per Requirements 10CFR50.73(a)(2)(iv)1999-10-0101 October 1999 Forwards LER 99-004-00 Re Multiple Unplanned ESF Actuations During Planned Mod Activities in Main Cr,Per Requirements 10CFR50.73(a)(2)(iv) ML20217B8891999-10-0101 October 1999 Forwards Response to RAI Re Request to Install Digital Power Range Neutron Monitoring Sys & Incorporate long-term,thermal-hydraulic Stability Solution Hardware. Revised TS Table 3.3.2.1-1 Encl ML20217D5211999-09-30030 September 1999 Informs That Remediating 3D Monicore Sys at Pbaps,Units 2 & 3 & 3D Monicore/Plant Monitoring Sys at Lgs,Unit 2 Has Been Completed Ahead of Schedule ML20212J8301999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Pilgrim Nuclear Power Station.Staff Conducts Reviews for All Operating NPPs to Integrate Performance Info & to Plan Insp Activities at Facility Over Next Six Months ML20216J9961999-09-29029 September 1999 Forwards Resume of Person Identified as Acting RPM in Licensee to NRC Re Notification That Person Named in License Condition 11 of 20-07626-02,is No Longer Employed at Pilgrim Station.Resume Withheld,Per 10CFR2.790 ML20216J3981999-09-29029 September 1999 Submits Comments for Lgs,Unit 1 & Pbaps,Units 2 & 3 Rvid,Rev 2,based on Review as Requested in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity ML20212J6851999-09-29029 September 1999 Informs of Completion of mid-cycle PPR of Peach Bottom Atomic Power Station on 990913.No Areas Identified in Which Licensee Performance Warranted Addl New Insps Beyond Core Insp Program.Historical Listing of Plant Issues Encl ML20212J5751999-09-28028 September 1999 Informs of Individual Exam Results for Applicants on Initial Exam Conducted on 990913-16 at Licensee Facility.Without Encls ML20216J0191999-09-27027 September 1999 Forwards Request for Addl Info Re Util 990301 Request to Support Installation of Digital Power Range Neutron Monitoring Sys & Incorporation of long-term thermal- Hydraulic Stability Solution Hardware,For Plant ML20216H6451999-09-24024 September 1999 Forwards Notice of Withdrawal of Util 990806 Application for Amends to Fols DPR-44 & DPR-56.Proposed Change Would Have Involved Temporary Change to Increase Limit for Average Water Temp of Normal Heat Sink ML20216H6751999-09-24024 September 1999 Forwards Amends 229 & 232 to Licenses DPR-44 & DPR-56, Respectively & Ser.Amends Will Delete SR Associated Only with Refueling Platform Fuel Grapple Fully Retracted Position Interlock Input,Currently Required by SR 3.9.1.1 ML20212H5431999-09-24024 September 1999 Informs of Decision to Inspect H-3 & H-4 Shroud Welds During Upcoming 3R12 Outage Scheduled to Begin Late Sept 1999 ML20212H6171999-09-24024 September 1999 Forwards Rev 2 to COLR for Pbaps,Unit 2,Reload 12,Cycle 13, IAW TS Section 5.6.5.d.Rept Incorporates Revised Single Loop Operation MAPLHGR Flow Multiplier ML20212F7871999-09-24024 September 1999 Advises That Util 990121 Application for Amend Being Treated as Withdrawn.Proposed Changes Would Have Modified Facility UFSAR Pertaining to Values for post-accident Containment Pressure Credited in Pilgrim Net Positive Head Analyses ML20212H1441999-09-23023 September 1999 Withdraws 990121 Request for License Change Re Emergency Core Cooling Sys Net Positive Suction Head,Due to Incorrect Datum Preparation ML20212H1381999-09-23023 September 1999 Submits Info in Support of Request Filed on 990730 to Grant one-time Exemption from 10CFR50,App E,Authorizing Biennial Full Participation Emergency Preparedness Exercise to Be Conducted in 2002 Instead of 2001 ML20216F8811999-09-23023 September 1999 Withdraws 990806 Exigent License Change Application.Tech Spec Change to Allow Continued Power Operation with Elevated Cooling Water Temps During Potentially Extreme Weather Conditions No Longer Needed Due to Favorable Weather ML20212E8661999-09-22022 September 1999 Discusses GL 98-01 Y2K Readiness of Computer Sys at NPPs & Supplement 1 & PECO Response for PBAPS Dtd 990630. Understands That at Least One Sys or Component Listed May Have Potential to Cause Transient During Y2K Transition ML20212F5481999-09-20020 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing, for Pbaps,Units 2 & 3 & Lgs,Units 1 & 2 ML20212D1191999-09-17017 September 1999 Forwards SE Re Proposed Alternatives to ASME Section XI Requirements for Containment Inservice Insp Program at Plant,Units 2 & 3 ML20212C2861999-09-16016 September 1999 Forwards SER Accepting Licensee 981123 Request for Relief RR-E1,RR-E5,RR-E6 Pursuant to 10CFR50.55a(a)(3)(i) & Request for Relief RR-E2,RR-E3 & RR-E4 Pursuant to 10CFR50.55a(a)(3)(ii) ML20216F3451999-09-16016 September 1999 Forwards Summary Rept Providing Results of ISI Conducted at PNPS on-line & Refueling Outage (RFO 12) ML20212A0091999-09-0909 September 1999 Provides Notification That Licenses SOP-11172 & SOP-11321, for SO Muntzenberger & Rh Wright,Respectively,Are No Longer Necessary as Result of Permanent Reassignment ML20216E7111999-09-0909 September 1999 Forwards License Renewal Application Including Form NRC-398 & Form NRC-396 for Jp Giar,License SOP-10061-3.Without Encls ML20216E5891999-09-0707 September 1999 Forwards Copy of Pilgrim Station Organization Structure. Encl Refelcts Changes in Upper Mgt Level Structure.Changes Were Effective 990901 ML20211P2961999-09-0707 September 1999 Provides Authorization to Administer NRC Approved Initial Written Exams to Listed Applicants on 990913 at Peach Bottom Npp,Delta,Pennsylvania ML20211M4501999-09-0303 September 1999 Informs That Pilgrim Nuclear Power Station Plans to Conduct Full Participation Emergency Preparedness Exercise with Commonwealth of Ma on 991207,IAW 10CFR50,App E,Section IV.F.2 ML20211M9161999-08-31031 August 1999 Submits Review & Correction of Info in Reactor Vessel Integrity Database (Rvid),Version 2,re Pilgrim Station ML20211J8391999-08-30030 August 1999 Forwards Rev 1 to Provisional Decommissioning Trust Agreement for Plant,Changing Portions of Agreement to Permit Up to Two Distributions & Clarify Formula for Distribution ML20211K7031999-08-30030 August 1999 Forwards Response to NRC 990826 RAI Re License Change Application ECR 99-01255,revising TSs 2.1.1.2 & 5.6.5 ML20211H5701999-08-27027 August 1999 Forwards Insp Rept 50-293/99-04 on 990610-0725.Two Violations Identified Being Treated as non-cited Violations ML20211E6941999-08-26026 August 1999 Forwards Request for Addl Info Re Min Critical Power Ratio. Response Should Be Submitted within 30 Days of Ltr Receipt ML20211Q4491999-08-25025 August 1999 Responds to Re Changes to PBAPS Physical Security Plan,Safeguards Contingency Plan & Guard Training & Qualification Plan Identified as Revs 13,11 & 9, Respectively.No NRC Approval Is Required,Per 10CFR50.54(p) 1999-09-09 Category:INTERNAL OR EXTERNAL MEMORANDUM MONTHYEARML20211D1001999-08-20020 August 1999
[Table view]Notification of 990908 Meeting with Util to Discuss Status of Limerick & Peach Bottom Licensing Issues.Meeting Held in Rockville,Md ML20211A4361999-08-18018 August 1999 Notification of Significant Licensee Meeting 99-47 with Entergy Nuclear,Inc on 990831 to Discuss Results of NRC Plant Performance Review of Pilgrim Nuclear Power Station Issued on 990409 ML20210G6161999-07-28028 July 1999 Notification of Significant Licensee Meeting 99-44 with Util on 990812 to Discuss Results of NRC Plant Performance Review of Beach Bottom Atomic Power Station Issued on 990409 ML20212H9491999-06-23023 June 1999 Forwards Draft Request for Addl Info Re PECO Request to Reduce re-insp Frequency of Certain Core Shroud Welds for Pbaps,Unit 3.RAI Transmitted by Facsimile on 990623 to J Hufnagel as follow-up to 990621 Telcon ML20212H7621999-06-22022 June 1999 Notification of 990701 Meeting with NEI & Entergy in Rockville,Md to Discuss Price-Anderson Issues Re Transfer of Pilgrim License from Beco to Entergy ML20206U2041999-05-19019 May 1999 Informs That Attached Request for Addl Info Transmitted by Facsimile on 990519 to T Loomis of Licensee Staff.Review of RAI Would Allow Licensee to Determine & Agree Upon Schedule to Respond to RAI ML20205L0301999-04-0909 April 1999 Notification of 990413 Meeting with Boston Edison Co & Entergy Nuclear Generation Co in Rockville,Md to Discuss Sale & Transfer of Pilgrim Station from Boston Edison Co to Entergy Nuclear Generation Co ML20205J3551999-03-16016 March 1999 Forwards Request for Addl Info Re GL 95-05, Periodic Verification of Motor-Operated Valves ML20196J5801998-12-0707 December 1998 Notification of 981209 Meeting with Representatives of Beco & Entergy in Rockville,Md to Discuss Sale of Pilgrim Plant ML20196F3461998-12-0202 December 1998 Forwards Info Re Operator Licensing Exam Administered on 981016-23 at Pilgrim Station,For Distribution Under Rids Code IE42 ML20196F5611998-12-0202 December 1998 Forwards Info Re OL Exam Administered on 981016-23 at Pilgrim Station,For Distribution Under Rids A070 ML20155G7751998-11-0404 November 1998 Notification of 981118 Meeting with Util in Rockville,Md to Discuss Limerick Generating Station,Units 1 & 2 & Peach Bottom Atomic Power Station,Units 2 & 3 Ampacity Validation Analyses ML20155G5931998-11-0303 November 1998 Notification of 981118 Meeting with Util in Rockville,Md to Discuss Plant,Units 2 & 3 Design Basis for Pumps Net Positive Suction Head.Agenda Encl ML20154G5141998-10-0202 October 1998 Notification of 981008 Meeting W/Beco in Rockville,Md to Discuss Core Spray Piping Integrity.Meeting Has Been Rescheduled to 981015 ML20154D5091998-10-0202 October 1998 Notification of Meeting W/Beco on 981008 in Rockville,Md to Discuss Core Spray Piping Integrity ML20153B9721998-09-14014 September 1998 Requests Publication in Biweekly Fr Notice for Notice of Issuance of Amend 9 to License DPR-12 ML20153E3601998-09-0303 September 1998 Forwards Certified License Application for DA Buckley as Stated in Note Section of Memo Sent 980825 ML20248H8201998-06-0404 June 1998 Requests That Attached Copy of Peach Bottom Unit 1 Updated FSAR Be Made Available for Public Review Until Jul 1998 in Lpdr.Nrc Planning to Hold Public Meeting on 980629 in Delta, Pa.W/O Encl ML20248D6351998-05-29029 May 1998 Forwards Signed Original of Fr Notice for Transmittal to Ofc of Fr for Publication ML20216C4271998-04-17017 April 1998 Notification of 980521 Meeting W/Peco Energy Co in King of Prussia,Pennsylvania to Discuss Reactor Feed Pump Trip Operability & Core Spray Pump Foreign Matl Exclusion - Predecisional Enforcement Conference ML20247G2441998-04-15015 April 1998 Notification of Significant Licensee Meeting 98-34 W/Util on 980427 to Discuss Weaknesses in Licensee Alarm Assessment Program (EA 98-191) ML20216C9251998-04-0707 April 1998 Forwards Exam Rept W/As Given Written Exam for Test Administered on 970922-26 at Facility ML20203E2781998-02-19019 February 1998 Notification of Significant Licensee Meeting 98-18 W/Util in King of Prussia,Pa on 980310 Re Plant Design Basis Project Discussion ML20236N4201998-01-30030 January 1998 Forwards NMSS Items of Interest for Wk Ending 980130.Items Include Meeting W/Ge on 980121,insp at Amersham on 980122-23,US EPA Meeting on 980122 to Discuss Groundwater C/A Program at Church Rock & Visit to Flawtech on 980122 ML20199C7581997-10-31031 October 1997 Notification of Significant Licensee Meeting 97-112 W/Util on 971113 to Discuss NRC SALP ML20212D6201997-10-28028 October 1997 Notification of Licensee Meeting on 971121 W/Util in King of Prussia,Pa to Discuss Apparent Violations Identified During NRC Insp 50-293/97-05 ML20211A5361997-09-12012 September 1997 Notification of 970915 Meeting W/Util in North Bethesda,Md to Discuss Plant ECCS Pump Suction Strainer Mod Issues ML20210K3001997-08-15015 August 1997 Notification of 970820 Meeting W/Util in North Bethesda,Md to Discuss Plants Project Mgt Issues Including Planned TSs Submittals & Generic Licensing Issue Status ML20151L7771997-08-0101 August 1997 Notification of Meeting W/Peco Energy Co on 970805 in Rockville,Md to Discuss Plans & Schedules for Resolving thermo-lag Fire Barrier Issues at Mentioned Plants IR 05000277/19970991997-07-21021 July 1997 Notification of Significant Licensee Meeting 97-85 W/Util on 970729 in Delta,Pa to Discuss SALP for Period Covering 951015-970606,as Documented in NRC SALP Repts 50-277/97-99 & 50-278/97-99 ML20140F6151997-06-11011 June 1997 Notification of 970612 Meeting W/Util in Rockville,Md to Discuss Net Positive Suction Head for ECCS Pumps ML20148F7201997-05-30030 May 1997 Forwards Semiannual Status Rept on Fire Protection Task Action Plan & plant-specific Thermo-Lag Correction Action Programs ML20138D9521997-04-25025 April 1997 Forwards Background Document Re Station Blackout Issues, Provided by Licensee,In Response to Unresolved Insp Items Noted in Insp Repts 50-277/96-06,50-278/96-06 & 50-277/96-07 & 50-278/96-07 ML20236N0521997-04-0909 April 1997 Forwards TIA Response by NRR Re Scope of Channel Functional Testing Required by Plant TSs ML20137Q9761997-03-31031 March 1997 Informs That as-found LOCA & Life Testing & Analysis Does Not Provide Acceptable Approach for Demonstrating Qualification at Accident Temp Higher than 340F,per 970110 TAR ML20137G7241997-03-25025 March 1997 Corrects Notification of 970414 Meeting W/Util in Bethesda, MD to Discuss Util Plans & Schedules for Resolution of Thermo-Lag Fire Barrier Issues at Plants ML20136G5821997-03-14014 March 1997 Notification of 970410 Meeting W/Util in North Bethesda,Md to Discuss Util Plan to Build Spent Fuel Dry Storage Facility at Plant,Units 1 & 2 ML20137B4781997-03-14014 March 1997 Undated Memo Discussing Beco Reorganization ML20136G0391997-03-13013 March 1997 Notification of 970414 Meeting W/Util in North Bethesda,Md to Discuss PECO Plans & Schedules for Resolution of Thermo Lag Fire Barrier Issues at Peach Bottom & Limerick ML20141A7361997-03-12012 March 1997 Rcommends That Key RES Staff Attend Subcommittee Meetings to Address Any Questions,Arise in Discussions Among Members & to Answer Any Key Questions Posed in Advance by Subcommittee Chairmen ML20138L8021997-02-19019 February 1997 Forwards Background Documents Re Channel Functional Test Technical Interface Agreement for Plant,Units 1 & 2 ML20236M9831997-02-18018 February 1997 Forwards TIA Response to 961030 Region I Request to Review Issue Related to Scope of Channel Functional Testing Required by Ts.Memo Supersedes Memo ML20236M9241997-01-30030 January 1997 Forwards TIA Response to 961030 Region I Request to Review Issue Re Scope of Channel Functional Testing Required by TS ML20236M0571996-12-0303 December 1996 Responds to 961126 Note Requesting Written Interpretation of TS for Plant,Units 2 & 3.Specifically,under What Plant Conditions,Including Reference to DG Testing Conditions,Sr 3.8.1.17 Must Be Met ML20134N0011996-11-19019 November 1996 Notification of Significant Licensee Meeting 96-106 W/Util on 961206 to Discuss Interactions That Were Introduced During Prior Modifications,Between Emergency Diesel Generators & Associated Residual Heat Removal Sys Pumps ML20149M3291996-11-12012 November 1996 Forwards Input Re TIA on Plant Licensing Basis & Subsequent Mod Under 10CFR50.59 for Two Safety Significant Problems ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20129H4641996-10-31031 October 1996 Notification of Significant Licensee Meeting 96-106 & 96-346 W/Util on 961211 to Discuss Interactions That Were Introduced During Prior Mods,Between Emergency DG & Associated RHR Sys Pumps ML20129H3881996-10-31031 October 1996 Notification of Significant Licensee Meeting 96-105 W/Util on 961115 to Address Maint Rule Implementation Issues at Peach Bottom as Identified in Maint Rule Team Insp 50-277/96-07 & 50-278/96-07 ML20129H9551996-10-30030 October 1996 Notification of Peach Bottom full-participation Exercise Scheduled for 961119 on Site.Forwards Lodging Arrangements, Roster Assignments & Schedule of Key Events 1999-08-20 Category:MEMORANDUMS-CORRESPONDENCE MONTHYEARML20211D1001999-08-20020 August 1999
[Table view]Notification of 990908 Meeting with Util to Discuss Status of Limerick & Peach Bottom Licensing Issues.Meeting Held in Rockville,Md ML20211A4361999-08-18018 August 1999 Notification of Significant Licensee Meeting 99-47 with Entergy Nuclear,Inc on 990831 to Discuss Results of NRC Plant Performance Review of Pilgrim Nuclear Power Station Issued on 990409 ML20210G6161999-07-28028 July 1999 Notification of Significant Licensee Meeting 99-44 with Util on 990812 to Discuss Results of NRC Plant Performance Review of Beach Bottom Atomic Power Station Issued on 990409 ML20212H9491999-06-23023 June 1999 Forwards Draft Request for Addl Info Re PECO Request to Reduce re-insp Frequency of Certain Core Shroud Welds for Pbaps,Unit 3.RAI Transmitted by Facsimile on 990623 to J Hufnagel as follow-up to 990621 Telcon ML20212H7621999-06-22022 June 1999 Notification of 990701 Meeting with NEI & Entergy in Rockville,Md to Discuss Price-Anderson Issues Re Transfer of Pilgrim License from Beco to Entergy ML20206U2041999-05-19019 May 1999 Informs That Attached Request for Addl Info Transmitted by Facsimile on 990519 to T Loomis of Licensee Staff.Review of RAI Would Allow Licensee to Determine & Agree Upon Schedule to Respond to RAI ML20205L0301999-04-0909 April 1999 Notification of 990413 Meeting with Boston Edison Co & Entergy Nuclear Generation Co in Rockville,Md to Discuss Sale & Transfer of Pilgrim Station from Boston Edison Co to Entergy Nuclear Generation Co ML20205J3551999-03-16016 March 1999 Forwards Request for Addl Info Re GL 95-05, Periodic Verification of Motor-Operated Valves ML20196J5801998-12-0707 December 1998 Notification of 981209 Meeting with Representatives of Beco & Entergy in Rockville,Md to Discuss Sale of Pilgrim Plant ML20196F3461998-12-0202 December 1998 Forwards Info Re Operator Licensing Exam Administered on 981016-23 at Pilgrim Station,For Distribution Under Rids Code IE42 ML20196F5611998-12-0202 December 1998 Forwards Info Re OL Exam Administered on 981016-23 at Pilgrim Station,For Distribution Under Rids A070 ML20155G7751998-11-0404 November 1998 Notification of 981118 Meeting with Util in Rockville,Md to Discuss Limerick Generating Station,Units 1 & 2 & Peach Bottom Atomic Power Station,Units 2 & 3 Ampacity Validation Analyses ML20155G5931998-11-0303 November 1998 Notification of 981118 Meeting with Util in Rockville,Md to Discuss Plant,Units 2 & 3 Design Basis for Pumps Net Positive Suction Head.Agenda Encl ML20154D5091998-10-0202 October 1998 Notification of Meeting W/Beco on 981008 in Rockville,Md to Discuss Core Spray Piping Integrity ML20154G5141998-10-0202 October 1998 Notification of 981008 Meeting W/Beco in Rockville,Md to Discuss Core Spray Piping Integrity.Meeting Has Been Rescheduled to 981015 ML20153B9721998-09-14014 September 1998 Requests Publication in Biweekly Fr Notice for Notice of Issuance of Amend 9 to License DPR-12 ML20153E3601998-09-0303 September 1998 Forwards Certified License Application for DA Buckley as Stated in Note Section of Memo Sent 980825 ML20248H8201998-06-0404 June 1998 Requests That Attached Copy of Peach Bottom Unit 1 Updated FSAR Be Made Available for Public Review Until Jul 1998 in Lpdr.Nrc Planning to Hold Public Meeting on 980629 in Delta, Pa.W/O Encl ML20248D6351998-05-29029 May 1998 Forwards Signed Original of Fr Notice for Transmittal to Ofc of Fr for Publication ML20216C4271998-04-17017 April 1998 Notification of 980521 Meeting W/Peco Energy Co in King of Prussia,Pennsylvania to Discuss Reactor Feed Pump Trip Operability & Core Spray Pump Foreign Matl Exclusion - Predecisional Enforcement Conference ML20247G2441998-04-15015 April 1998 Notification of Significant Licensee Meeting 98-34 W/Util on 980427 to Discuss Weaknesses in Licensee Alarm Assessment Program (EA 98-191) ML20216C9251998-04-0707 April 1998 Forwards Exam Rept W/As Given Written Exam for Test Administered on 970922-26 at Facility ML20203E2781998-02-19019 February 1998 Notification of Significant Licensee Meeting 98-18 W/Util in King of Prussia,Pa on 980310 Re Plant Design Basis Project Discussion ML20236N4201998-01-30030 January 1998 Forwards NMSS Items of Interest for Wk Ending 980130.Items Include Meeting W/Ge on 980121,insp at Amersham on 980122-23,US EPA Meeting on 980122 to Discuss Groundwater C/A Program at Church Rock & Visit to Flawtech on 980122 ML20199C7581997-10-31031 October 1997 Notification of Significant Licensee Meeting 97-112 W/Util on 971113 to Discuss NRC SALP ML20212D6201997-10-28028 October 1997 Notification of Licensee Meeting on 971121 W/Util in King of Prussia,Pa to Discuss Apparent Violations Identified During NRC Insp 50-293/97-05 ML20211A5361997-09-12012 September 1997 Notification of 970915 Meeting W/Util in North Bethesda,Md to Discuss Plant ECCS Pump Suction Strainer Mod Issues ML20210K3001997-08-15015 August 1997 Notification of 970820 Meeting W/Util in North Bethesda,Md to Discuss Plants Project Mgt Issues Including Planned TSs Submittals & Generic Licensing Issue Status ML20151L7771997-08-0101 August 1997 Notification of Meeting W/Peco Energy Co on 970805 in Rockville,Md to Discuss Plans & Schedules for Resolving thermo-lag Fire Barrier Issues at Mentioned Plants IR 05000277/19970991997-07-21021 July 1997 Notification of Significant Licensee Meeting 97-85 W/Util on 970729 in Delta,Pa to Discuss SALP for Period Covering 951015-970606,as Documented in NRC SALP Repts 50-277/97-99 & 50-278/97-99 ML20140F6151997-06-11011 June 1997 Notification of 970612 Meeting W/Util in Rockville,Md to Discuss Net Positive Suction Head for ECCS Pumps ML20148F7201997-05-30030 May 1997 Forwards Semiannual Status Rept on Fire Protection Task Action Plan & plant-specific Thermo-Lag Correction Action Programs ML20138D9521997-04-25025 April 1997 Forwards Background Document Re Station Blackout Issues, Provided by Licensee,In Response to Unresolved Insp Items Noted in Insp Repts 50-277/96-06,50-278/96-06 & 50-277/96-07 & 50-278/96-07 ML20236N0521997-04-0909 April 1997 Forwards TIA Response by NRR Re Scope of Channel Functional Testing Required by Plant TSs ML20137Q9761997-03-31031 March 1997 Informs That as-found LOCA & Life Testing & Analysis Does Not Provide Acceptable Approach for Demonstrating Qualification at Accident Temp Higher than 340F,per 970110 TAR ML20137G7241997-03-25025 March 1997 Corrects Notification of 970414 Meeting W/Util in Bethesda, MD to Discuss Util Plans & Schedules for Resolution of Thermo-Lag Fire Barrier Issues at Plants ML20136G5821997-03-14014 March 1997 Notification of 970410 Meeting W/Util in North Bethesda,Md to Discuss Util Plan to Build Spent Fuel Dry Storage Facility at Plant,Units 1 & 2 ML20137B4781997-03-14014 March 1997 Undated Memo Discussing Beco Reorganization ML20136G0391997-03-13013 March 1997 Notification of 970414 Meeting W/Util in North Bethesda,Md to Discuss PECO Plans & Schedules for Resolution of Thermo Lag Fire Barrier Issues at Peach Bottom & Limerick ML20141A7361997-03-12012 March 1997 Rcommends That Key RES Staff Attend Subcommittee Meetings to Address Any Questions,Arise in Discussions Among Members & to Answer Any Key Questions Posed in Advance by Subcommittee Chairmen ML20138L8021997-02-19019 February 1997 Forwards Background Documents Re Channel Functional Test Technical Interface Agreement for Plant,Units 1 & 2 ML20236M9831997-02-18018 February 1997 Forwards TIA Response to 961030 Region I Request to Review Issue Related to Scope of Channel Functional Testing Required by Ts.Memo Supersedes Memo ML20236M9241997-01-30030 January 1997 Forwards TIA Response to 961030 Region I Request to Review Issue Re Scope of Channel Functional Testing Required by TS ML20236M0571996-12-0303 December 1996 Responds to 961126 Note Requesting Written Interpretation of TS for Plant,Units 2 & 3.Specifically,under What Plant Conditions,Including Reference to DG Testing Conditions,Sr 3.8.1.17 Must Be Met ML20134N0011996-11-19019 November 1996 Notification of Significant Licensee Meeting 96-106 W/Util on 961206 to Discuss Interactions That Were Introduced During Prior Modifications,Between Emergency Diesel Generators & Associated Residual Heat Removal Sys Pumps ML20149M3291996-11-12012 November 1996 Forwards Input Re TIA on Plant Licensing Basis & Subsequent Mod Under 10CFR50.59 for Two Safety Significant Problems ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20129H3881996-10-31031 October 1996 Notification of Significant Licensee Meeting 96-105 W/Util on 961115 to Address Maint Rule Implementation Issues at Peach Bottom as Identified in Maint Rule Team Insp 50-277/96-07 & 50-278/96-07 ML20129H4641996-10-31031 October 1996 Notification of Significant Licensee Meeting 96-106 & 96-346 W/Util on 961211 to Discuss Interactions That Were Introduced During Prior Mods,Between Emergency DG & Associated RHR Sys Pumps ML20129H9551996-10-30030 October 1996 Notification of Peach Bottom full-participation Exercise Scheduled for 961119 on Site.Forwards Lodging Arrangements, Roster Assignments & Schedule of Key Events 1999-08-20 |
Text
- -
Abcs %- \
... /'
. . Murley for Appropriate Action I p r,g (E00 Signature) ,
/ UNITED STATES Cys: Stello l
'o,, Taylor 8 o NUCLEAR REGULATORY COMMISSION i : I ADVISORY COMMITTEE ON REACTOR SAFEGUARDS Rehm wash waTON, D. C. 20666 Thompson t
Beckjord
%,*****.p/ Jordan April 12,1988
- Murray 1 CFiles l
l l
The Honorable Lando U. Zech, Jr.
Chairman U.S. Nuclear Regulatory Cocriission ,
Washington, D. C. 20555 !
i
Dear Chairman Zech:
SUBJECT:
ACRS REVIEW OF SHUTDOWN NUCLEAR POWER TLf.NTS The ACRS plans to review several nuclear power plants that have either been shut down for ,an extended period and are now being considered for restart or have been delayed in initial startup for a longer period than usual.
We will not a.s a matter of course issue reports prior to a restart decision unless we have concerns that we believe should be brought to the Comission's imediate attention or you have specifically requested such a report. In the latter case, we would appreciate early notification since this could influence our priorities in scheduling these reviews.
Sincerely, W. Kerr l Chair: nan Oh 4 9
8806030207 0G0525 PDR ADOCK 05000171 P PDR I