ML20154N170

From kanterella
Jump to navigation Jump to search
Forwards Radiological Safety Insp Rept 50-293/86-02 on 860113-17.No Violations Noted.Establishment & Implementation of long-term Corrective Actions for Three Violations Identified by Util Will Be Reviewed in Future Insps
ML20154N170
Person / Time
Site: Pilgrim
Issue date: 03/10/1986
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Harrington W
BOSTON EDISON CO.
Shared Package
ML20154N173 List:
References
NUDOCS 8603170224
Download: ML20154N170 (2)


See also: IR 05000293/1986002

Text

I

.

.

MAR 101986

Docket No. 50-293

Boston Edison Company M/C Nuclear

ATTN: Mr. William D. Harrington

Senior Vice President, Nuclear

800 Boylston Street

Boston, Massachusetts 02199

Gentlemen:

Subject: Inspection Report No. 50-293/86-02

A routine radiological safety inspection was conducted by Mr. R. L. Nimitz on

January 13-17, 1986 of your Pilgrim Nuclear Power Station. The findings of

the inspection were discussed with you and members of your staff.

The inspection covered implementation of your Radiological Improvement Pro-

gram, radiological controls for fuel pool re-racking and radwaste concentrator

removal, and calibration and testing of area radiation monitors.

Within the scope of the inspection no violations were identified.

Three apparent violations identified by your staff were also reviewed during

this inspection. The establishment and implementation of your long term

corrective actions for these apparent violations will be reviewed during

a subsequent inspection.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room.

Your cooperation with us in these matters is appreciated.

Sincerely,

0:1::inc1c! ~ ~'n,

(- 7

homas T. Martin, rector

i Division of Radiation Safety

and Safeguards

Enclosure: NRC Region I Inspection Report No. 50-293/86-02

8603170224 860310

DR ADOCK O y3

0FFICIAL RECORD COPY IR PILGRIM 86-02 - 0001.0.0

03/07/86, @

r

.

,

Boston Edison Co. M/C Nuclear 2

cc w/ enc 1:

A. V. Morist, Manager, Nuclear Management Services Department

C. J. Mathis, Station Manager

Joanne Shotwell, Assistant Attorney General

Paul Levy, Chairman, Department of Public Utilities

W. J. Nolan, Chairman, Plymouth Board of Selectmen

Plymouth Civil Defense Director

Senator Edward P. Kirby

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Massachusetts (2)

bec w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

Section Chief, DRP

W. Raymond, SRI, Vermont Yankee

T. Shediosky, SRI, Millstone 1&2

H. Eichenholz, SRI, Yankee

P. Leech, LPM, NRR

%ttb

V RI:DRSS RI:DRS W f I:DRSS

fciNimitz/fi Shanbary Bellamy

03/ 7/86 03/7/86 03/f/86

0FFICIAL RECORD COPY IR PILGRIM 86-02 - 0002.0.0

03/07/86