Forwards Monthly Operating Repts for Sept 1998 for SONGS, Units 2 & 3,respectively.No Challenges to Pressurizer Safety Valves Occurred for Either Units
ML20154M775
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 10/15/1998
From: Gibson G
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20154M777 List:
References
NUDOCS 9810210033
Download: ML20154M775 (1)


Text

~ _

$OU1111RN CAltf ORMA B

EDISON u moov isnnmas u-c,ony October 15,1998 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Gentlemen:

Subject:

Docket Nos. 50-361 and 50-362 Monthly Operating Reports for September 1998 San Onofre Nuclear Generating Station, Units 2 and 3

. Technical Specification 6.7.1.4 of Facility Operating Licenses NPF-10 and NPF-15 for the San Onofre Nuclear Generating Station, Units 2 and 3, respectively, requires -

Southern Califomia Edison to provide a Monthly Operating Report (MOR) of operating statistics and shutdown experience, including documentation of all challenges to pressurizer safety valves, for each unit. Enclosures 1 and 2 provide the September 1998 Monthly Operating Reports for Units 2 and 3, respectively. There were no challenges to pressurizer safety valves for either Unit 2 or 3.

- If you have any questions, please contact Mr. Clay E. Williams at (949) 368-6707.

Sincerely, t

Gregory T. Gibson Manager, Compliance Enclosures

\\)l

- cc-E. W. Merschoff, Regional Administrator, NRC Region IV J. W. Clifford, NRC Project Manager, San Onofre Units 2 & 3

/

J. A. Sloan, NRC Senior Resident inspector, San Onofre Units 2 & 3 9810210033 981015 O