_
9 4
NIAGARA M0llAWK POWER CORPORATION NINE MILE POINT NUCLEAR STATION UNIT #1 1
NARRATIVE OF OPERATING EXPERIENCE The station operated during the month of February 1986 with a Unit Availability Factor of 100.0% and a Net Design Electrical Capacity Factor of 72.4%.
There were no challenges to the Electromatic Relief Valves.
Reductions in Capacity " actor were due to end of cycle coastdown.
CLASS I WORK - MECllANICAL MAINTENANCE - FEBRUARY 1986 j
hR# 32897 Install support 201.9-115 (Installed support 201.0-115 per DTM 3200-15) j hR# 37388
- 11 CRD pump - check for noisy operation (rebuilt pump) l hR# 37208
- 12 CRD filter (replaced strainer elements and 0-rings)
CLASS I WORK - ELECTRICAL MAINTENANCE - FEBRUARY 19F6 No Class I, Safety Related, Corrective Maintenance performed this month.
CLASS I WORK - INSTRUMENTATION 6 CONTROL - IEBRUARY 1986 i
hR# 37265 Containment spray raw water filter D/P switch, when trip set for 5.0 PSIG mercold will not reset (replaced D/P switch) hR# 37429 CRD pump #12 needs vibration analysia (vibration analysis satisfactory and replaced switch) hR# 37772
- 12 CRD pump vibration switch alarms when pump is not
[
vibrating excessively (switch satisfactory) hR# 35903 Control Room Emergency Ventilation System #11 has spurious trip on radiation element (secured wires in panci 1512) l k
Nd\\
l 0603140446 gO DR ADOCM O
o OPERATING DATA REPORT DOCKET NO. 50-220 D\\TE 3/5/86 COMPLETED itY TW Roman h
TELEPHONE (3151349-N OPERATING STATUS
- 1. Unit Name:
Nine Mile Point lirit i Notes
- 2. Reporting Period:
2/1/86 thru 2/28/86 1850
- 3. Licensed Thennal Power (MWt):
640
- 4. Nameplate Rating (Gross MWe):
620
- 5. Design Electrical Rating (Net MWe):
630
- 6. Maximum Dependable Capacity (Gross MWe):
610
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted,if Any (Net MWe):
- 10. Reasons For Restrictions,if Any:
This Month Yr..to.Date Cumulative 672.0 1416.0 144,985.2 i1. Hours in Reporting Period
- 12. Number Of Hours Reactor Was Critleal 672.0 1262.0 102.501.6 0.0 0.0 1,204.2
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On.Line 672.0 1252.8 99,515.4
- 15. Unit Reserve Shutdown Hours 0.0 0.0 20.4
- 16. Gross Thermal Energy Generated (MWH) 950,712.0 1,844,275.0 166,340,033.0
- 17. Gross Electrical Energy Generated (MWH) 314,009.,0, 611,057.0 55,080,512.0
- 18. Net Electrical Energy Generated (MWH) 301,797.0 587,934.0 53,350,261.6
- 19. Unit Service Factor 100.0 88.5 69.0
- 20. Unit Availability Factor 100.0 88.5 69,0 73.6 68,1 60.6
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net) 72.4 67.0 59.7
- 23. Unit Forced Outage Rate 0.0 11.5 15.4
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each1:
Refuel Outace scheduled for March 1986.
Duration:
14 weeks
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior io Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION l'8/77 I
g..
AVER AGE D ALLY UN!T POhER LEVEL DOCKET NO.
50 220 UNIT.Nine Mlle Pt. 1 DATE 3/5/86 TW Roman [ [ I CO\\lPLETED BY TELErilONE _ (3151349-2422 MONTH February.1986 DAY AVERAGE DAILY POWER LEVEL, DAY AVER ACE DAILY POWER LEVEL (MWe Net)
(Mwe. Net p I
479 y
443 2
478 is 440 3
475 gg 438 4
472 20 437 5
472 21 436 6
468 433 22 7
466 33 431 3
463 34 430 9
460 429 10 460 26 423 11 457 27 422
'453
- s 420 13 450 39 14 449 30 15 449 33 16 445 t
INSTRUCTIONS I
On this fortnat.hst the aserage dail) unit piewer lesel ni MWe. Net l'or cach da> in the rep.. iring m.. nth.r.iinpute to the riearest whole rnegassset.
e D
~.m
UNIT SHU1 DOWNS AND POWER REDUCHONS DOCKET NO. s n _'on UMTNAME Nine Mile pt. 1 DATE 3/ 5 / 86 COMPLETED BY TW Roman 94g,_
REPORT MONTH Februarv 1986 TELEPHONE (3151349-2 t/?
"s
=
e.
3.. :
c
-5 E E
7g3 Licensee g4 Cause & Correceive y..
Daic g
gg j.; cz:
Event aT BT Action su
[25 5
$* 5 'i Repos a iN0
}O Prevent Recurrence d
None I
2 3
4 F. Forced Reason:
Method:
Exhites C-Instructions S: Scheduleil A E.guipment Failure (Emplair.)
1-Manual for Preparation of Dasa B. Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C Refueling 3 Automatic Scram.
Event Repose (LER) File (NUREG.
D-Regulatosy Res;:iction 4Other (Emplain) 0161)
Loperatur Training & Ucense Examination F-Adnunistrative 5
G-Opera'iunal Eeros (Eaplain t Exhibit I Same Source l'*[77 )
110:het (Esplain)
6 NMP-17344 NIAGARA MOH AWK POWER CORPORATION NIAGARA MOHAWK 300 ERic souLEvaRO wtST SYRACUSE, N Y 13202 nt sett CL natose Marcit 5, 1986 Director Of fice of Inspection and Enforcenettt U.S. Nuclear Regulato~.y Conunission Wasitington, DC 20SSS Attn:
Documeost and Cotttrol Desk Re: Vocket No. 50-220 QPR-63
Dear Sir:
Submitted lierewitit is tite Report of Operating Statistics and situ,tdown for February 1986 for Ge Nine I. lite Poirtt Nuclear Station Uuti,t M1.
Also included is a narrative report of Operating Experience for February.
Vert traly yours, trunA-
' o
$5 'U Tltomas E. Lempges Vice Presidentt Nuclear Generation TEL/kg Attacilmertts cc: Director, Office of ISE (10 copies)
$m 1