Text
43,
'-
MAY 251988
.
Docket No. 50-293
License No. DPR-35
Boston Edison Company
ATTN:
Ralph G. Bird
. Senior Vice President - Nuclear
800 Boylston Street
Boston, Massachusetts 02199
Gentlemen:
x
Subject:
Inspection No. 50-293/88-17
This refers to the maintenance assessment team inspection led by
Mr. D. Haverkamp of this office on April 25 to May 5,1988, at the Pilgrim
Nuclear Power Station (PNPS), Plymouth, Massachusetts and at the Braintree,
Massachusetts engineering office.
The inspection addressed activities
authorized by NRC License No. DPR-35. At the conclusion of the inspection,
an exit interview was held with you and members of your staff to discuss
the scope and the findings of the inspection.
The inspection findings
were also discussed during a telephone conversation on May 25, 1988 between
Mr. R. Anderson of your staff and Mr. Haverkamp.
The purpost of this inspection was to perform an in-depth assessment of main-
tenance activities at PNPS, including examination of identified maintenance
problems, correction of those problems, and maintenance section interfaces
with engineering, operations, quality assurance and health physics personnel.
Particular emphasis was placed on maintenance activities associated with the
high pressure coolant injection system and reactor core isolation cooling
system that were completed during the current outage, as well'as ongoing
maintenance activities.
Areas examined during this inspection are described in the NRC Region I
Inspection Report which is enclosed with this letter. Within these areas,
the inspection consisted of interviews with personnel, observations and
examinations of plant equipment and selective examinations of procedures,
representative records and documents by the inspectors. No violations of
regulatory requirements were identified during the inspection.
However, significant deficiencies were identified during the inspection that
warrant your attention and should be addressed prior to PNPS restart. The
deficiencies are in the areas of the maintenance program, program performance
and staffing, and are identified in section 1.2 of the enclosed report. We
request that you responJ in writing within thirty days of receipt of this
letter identifying actions taken or planned to address these deficiencies.
0
D
$8R6%8M'o8888Ba
\\
Q
g(
.
. . _ -
.
_ _ .
.
- - _ _ _ _
.
_ _
_ _
s:{}
e-
Boston Edison Company
2
In accordance with 2.790 of the NRC's "Rules of Practice," Part 2, Title 10,
Code of Federal Regulations, a copy of this letter and your reply will be
placed in the Publ): Document Room.
The responses requested by this letter are not subject to the clearance proce-
dures of the Office of Management and Budget as required by the Paperwork
Reduction Act of 1980, PL 96-511.
Your cooperation with us in this matter is appreciated.
Sincerely,
Odsinal sicmog %(
. WRT M. GALLO
William V. Johnston
Acting Director
Division of Reactor Safety
Enclosure:
NRC Region I Inspection Report Number 50-293/88-17
cc w/ encl:
K. Highfill, Station Director
R. Anderson, Plant Manager
t
B. McIntyre, Chairman, Department of Public Utilities
Chairman, Plymouth Board of Selectmen
Plymouth Civil Defense Director
J. Keyes, Licensing Division Manager
l
E. Robinson, Nuclear Information Manager
l
R. Swanson, Nuclear Engineering Department Manager
!
The Honorable Edward J. Markey
l
The Honorable Edward P. Kirby
-
The Honorable Peter V. Forman
l
S. Pollard, Secretary of Energy Resources
l
P. Agnes, Assistant Secretary of Public Safety, Commonwealth of
'
R. Shimshak, MASSPIRG
Public Document Room (PDR)
l'
Local Public Document Rnom (LPDR)
l
Nuclear Safety Information Center (NSIC)
l
NRC Resident Inspector
Commonwealth of Massachusetts (2)
'
0FFICIAL RECORD COPY
IR PILGRIM 88-17 - 0002.0.0
05/25/88
-
. .
- -
.
. - . .
- . ~
. - .
- .
.
. ~ - .
-.----J
-
,S.
..
'
'
Boston Edison Company
3
bec w/ encl:
'
W. Russell, RA
J.'Allt.n, DRA'
.
W. Johnston, DRS
J. Durr, DRS
R. Golla, DRS'
N. Blumberg, DRS
T. Rebelowski, DRS
.
W. Kane, DRP
S. Collins, DRP
J. Wiggins, DRP
R. Blough, DRP
L. Doerflein, DRP
R. Bores, DRSS
.
.
.
'
C. Warren, SRI - Pilgrim (w/ concurrences)
Region I Docket Room (w/ concurrences)
M. Perkins, DRMA (w/o enc 1)
Team Members-
.
,
'
i
.
j
-.
RI:0QP'7
RI:DRP
R
I:DRS
I:DRS
l
Have[un g/ tim /geb/ms
Wiggins Ddd#
al o
J nston
5/ f88
5/D88 @ritt 5
88
5/
8
h
0FFICIAL RECORD COPY
IR PILGRIM 88-17 - 0003.0.0
'
05/25/88
-
-
-
-
-
- -
-
- -
- -
- -
-
-
.