ML20154M039
| ML20154M039 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 05/25/1988 |
| From: | Durr J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Kemper J PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20154M043 | List: |
| References | |
| NUDOCS 8806010153 | |
| Download: ML20154M039 (2) | |
See also: IR 05000353/1988012
Text
-
.
~.
__
-t
.,
..
e
_
MAY 2 51988
Docket No. 50-353
Philadelphia Electric Company
ATTN: Mr. John S. Kemper, Sr.
Senior Vice President
2301 Market Street
Philadelphia, PA 19101
Gentlemen:
Subject:
Inspection No. 50-353/88-12
This refers to the routine safety inspection conducted by C. H. Woodard of this
office on April 25 - May 3, 1988, at Limerick Unit 2 Generating Station, of'
activities authorized by NRC License CPPR-107 and to the discussions of our
findings held by C. H. Woodard with J. M. Corcoran at the conclusion of the
inspection.
Areas extmined during this inspection are described in the NRC Region I
Inspection Report which is enclosed with this letter. Within these areas, the
inspection consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation, enclosed herewith as Appendix A.
This violation has been
'
categorized by severity level in accordance with the "General Statement of
Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C
(Enforcement Policy). You are required to respond to this letter and in
preparing your response, you should follow the instructions in Appendix A.
Further, you should address the applicability of this finding to the
maintenance and overhaul procedures for Unit No. 1 emergancy diesel engines.
,
The responses directed by this let'.3r and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget
as required by the Paperwork Reduction Act of 1980, PL 96-511.
60\\
OFFICIAL RECORD COPY
IR LIM 2 88-12 - 0001.0.0
v
05/23/88
8806010153 880525
Il
l\\
ADOCK 05000353
'y.
{
.
Q
.
_
_.
- _ _
__
.
. .
.
.
.
. .
. .
-t
.
'
.
.
Philadelphia El'ectric Company
2
I
Your cooperation with us in this matter is appreciated.
y
Sincerely,
,
- c.
Dr.isinal Signed By
Jacque P. Durr, Chief
Engineering Branch
Division of Reactor Safety
Enclosures:
1.
Appendix A, Notice of Violation
2.
NRC Region Inspection Repert Number 50-353/88-12
c: w/ enc 1:
S. Joseph _Kowalski, Vice President, Nuclear Engineering
W. T. Ullrich, Superintendent, Limerick 2 Project
J. M. Corcoran, Quality Assurance Manager
Graham M. Leitch, Vice President, Limerick Generating Station
J. W. Gallagher, Vice President - Nuclear
Troy B. Conner, Jr. , Esquire
Eugene J. Bradley, Esquire, Assistant General Counsel
Public Document Room (POR)
Local Public Document Room (LPOR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
-bec w/ enc 1:
Region I Docket Room (with concurrences)
-
Management Assistant, DRMA (w/o encl)
Section Chief, DRP
Robert J. Bores, DRSS
hh
A
6 9
RI:D S
RI: RS
RI:DRS
s
Woodard/mlb/rw
Anderson
Durr
05//f/88
05//T/88
05#J/88
0FFICIAL RECORD COPY
IR LIM 2 88-12 - 0002.0.0
05/18/88