ML20154K855
| ML20154K855 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 03/04/1986 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Tucker H DUKE POWER CO. |
| Shared Package | |
| ML20154K859 | List: |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8603110331 | |
| Download: ML20154K855 (1) | |
See also: IR 05000413/1986007
Text
ogia
.
.
l
tip 011986
l
ke Power Company.
TTN: Mr. H. B. Tucker, Vice President
Nuclear Production Department
422 South Church Street
Charlotte, NC 28242
Gentlemen:
SUBJECT:
REPORT NOS. 50-413/86-07 AND 50-414/86-09
On February 3-7, 1986, NRC inspected activities authorized by NRC Operating
License No. NPF-35 and Construction Permit No. CPPR-117 for your Catawba
facility.
At the conclusion of the inspection, the findings were discussed
i
with those members of your staff identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report
Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC's Public Document Room.
Should your have any questions concerning this letter, please contact us.
Sincerely,
Virgil L. Brownlee, Chief
Reactor Projects Branch 3
Division of Reactor Projects
Enclosure:
Inspection Report Nos. 50-413/86-07
and 50-414/86-09
cc w/ encl:
L . L. Dick, Vice President -
R
Construction
v . W. Hampton, Station Manager
J
bec w/ enc 1:
LNRC Resident Inspector
Document Control Desk
State of South Carolina
K. N. Jabbour, NRR
RII
RII
RII
RII
{
,j
GT
5
Cb
0
s
C8ur er
J/3 /86
g3/86
J/3/86
2/f/86
B603110331 860304
ADOCK 05000413
i
G
, g
zeo6