ML20154K378
| ML20154K378 | |
| Person / Time | |
|---|---|
| Site: | Maine Yankee |
| Issue date: | 09/08/1988 |
| From: | Anderson C, Cheung L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML20154K375 | List: |
| References | |
| 50-309-87-16-EC, NUDOCS 8809260003 | |
| Download: ML20154K378 (3) | |
See also: IR 05000309/1987016
Text
-
,
.
'
.
V.S. NUCLEAR REGULATORY COMMISSION
REGION I
Resort No. 50-309/87-16
iocket No. 50-309
License No. DPR-36
Licensee:
Maine Yankee Atomic Power Company
Fr:ility Name: Meine Yankee Atomic Power Station
Conference At:
NRC Region I, King of Prussia, Pennsylvania
Conference Date: August 23, 1988
Prepared by:
@ Mfd
_
L. Cheung, Sr. Rea or Bjineer
date
Approved by:
9/ Pf
C. Ande/.s n, Chief, Plant Systems Section
date
Conference Summary:
Environmental Qualification (EQ) enforcement conference held to discuss the
significance of concerns about the environmental qualification of the
terminal blocks for containment sump level instrument circuits, the cahle for
reactor coolant hot and cold leg RTOs, and the f. ur solenoid operated valves
.
in the HPSI/ charging pump suction vent.
l
l
l
l
!
l
l
l
l
l
I
G809260003 890916
!
ADOCK 05000309
0
,
,
.
.
.
DETAILS
1.
Conference Attendees
Maine Yankee Atomic Power Company (MYAPCO)
C. D. Frizzle, Vice President Operations
J. H. Garrity, Vice President Quality Programs and Engineering
G. D. Whittier, Manager, Nuclear Engineering and Licensing
J. Wytas, Electrical Engineer
Yankee Atoric Electric Company (YAEC)
P. L. Anderson, MY Project Manager
J. P. Bonner, MY EQ Coordinator
United States Nuclear Regulatory Commission
W. Johnston, Director, Division of Reactor Safety
J. Durr, Chief, Engineering Branch
C. Anderson, Chief, Plant System Section
L. Tripp, Chief, RPS 3A
P. Bissett, Sr. Operations Inspector
2.
Conference Scope
The enforcement conference considered the following potential EQ
viclations:
Terminal blocks for containment sump level instrument circuits
(50-309/87-16-13)
Cable for reactor coolant hot and cold leg RTDs (50-309/87-16-13)
Four solenoid operated valves in the HPSI/ Charging pump suction vent
(LER-88-005)
The scope of the discussions included:
Number of deficiencies and number of systems and components af fected
Specific and underlying cause of each potential "iolation
Actions taken or planned to correct the individual violations to
a
ensure overall compliance
A discussion of e.:h potential violation in light of the Modifi<d
Enforcement Policy for EQ Requirements, GL8S-07
\\
,
o
,
.
-
.
3
3.
Licensee Presentation
The licensee presented their position on the EQ issues of concern.
The
licensee presentation is outlined in their handout which is provided as
Attachment A to this document.
4.
Conclusion
The NRC staff stated that the licensee input will be considered in
assessing NRC handling of tne potential enforcement items.
The licensee
will be notified of appropriate enforcement actions in the future.