In Reply Refer To:
MAY 20 W
Dockets: 50-313/88-10
50 368/88-10
-Arkansas Power &' Light Company
ATTH: Gene Ca"ipt ell, Vice President -
Nuclear Operations
P.O. Box 551
Little Rock, Arra1sas 72203
Gentlemen:
This refers to the inspection conducted by W. D. Johnson and R. C. Haag of this
office during the period March 28 through April 30, 1988, of activities
authorized by NRC Operating Licer.ses OPR-51 and NPF-6 for Arkansas Nuclear One,
Units 1 and 2, and to the discussion of our findings with Mr. S. M. Quennoz and
other members of your staff at the conclusion of the inspection.
Areas examined during the inspection included operational safety verification,
maintenance, surveillance, complex surveillance, followup on previously
identified items, and followup on an allegation.
Within these areas, the
inspection consisted of selective examination of procedures and representative
records, interviews with personnel, and observations by the inspectors. The
findings are documented in the enclosed inspection report.
Within the scope of the inspection, no violations were identified.
During this inspection, it was found that certain of your activities appeared
to deviate from a written commitment made to the NRC.
This item and reference
to the commitment are identified in the enclosed Notice of Deviation. You are
requested to respond to this deviation in writing. Your response should be
based on the specifics contained in the Notice of Deviation enclosed with this
letter.
We have also examined actions you have taken with .aegard to previously
identified inspection findings. The status of these items is identified in
Paragrapn 2 of the enclosed report.
The response requested by this letter and the accompanying Notice is not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
hh
W
hY
RIV:DRP/ SRI
DRP/
DRP/A
AC pif-
DRP g
WDJohnson/cz
JITapia
DDChamberlain
MEEmerson
LJCarran
5 /2o/88
r /h/88
y/h/88
i /cQ88
$//o/88
hO
'
8805270090 890520
ADOCK 05000313
ll
Q
__
'
.
.-
.
. .
-
,
.
Arkansas' Power & Light Company
-2-
.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
l
Original Signed By
A. B. Beach
L. J. Callan, Director
Division of Reactor Projects
Enclosures:
1.
Appendix A - Notice of Deviation
2.
Appendix B - NRC Inspection Report
50-313/8810
50-368/8810
cc w/ enclosures:
"
Arkansas Nuclear One
ATTN:
J. M. Levine, Executive Director
'
Nuclear Operations
P.O. Box 608
Russellville, Arkansas 72801
Arkansas Radiation Control Program Director
bec to DMB (IE01)
bec distrib by RIV:
- RRI
R. D. Martin, RA
SectionChief(DRP/A)
RPSB-DRSS
RIV File
- Lisa Shea, RM/ALF
.
- DPR
- MIS System
'
- RSTS Operator
- Project Engineer, DRP/A
t
R. Hall
- G. Dick, NRP Project Manager
- C. Harbuck, NRR Project Manager *TSS
d
i
- DRS
Allegation Coordinator, RIV
l
- W/766
.
t
f
e
.
.
r-
,
,m,..,3+
- , - , - - - - ,
r-
,v,_.-.,
,m,.w.e
,,,,-,w..,,~wwm_.
r,my-,,,,
pry wm.,
,,,.%
.w,
--mw y ,
w,,--,-9.w-
me,--,ew-9,,,,-p
__. - - , .
-