Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217N1931999-10-22022 October 1999 Forwards Insp Rept 50-298/99-12 on 990927-30.No Violations Noted.Insp Exam of Activities Under License as They Relate to Emergency Preparedness & to Compliance with Commission Rules & Regulations & with Conditions of License ML20217G8771999-10-14014 October 1999 Forwards Insp Rept 50-298/99-10 on 990920-24.No Violations Noted ML20217G7401999-10-14014 October 1999 Forwards MOR for Sept 1999 for Cooper Nuclear Station. Rept Includes Documentation of Challenges to Safety/Relief Valves,Iaw TS 5.6.4 ML20217C2671999-10-0808 October 1999 Forwards Insp Rept 50-298/99-03 on 990823-27 & 0907-10.No Violations Noted.Purpose of Insp to Ensure That Licensee Had Effective Programs for Identifying,Evaluating & Correcting Problems Which Could Impact Safe Plant Operations ML20212K9661999-09-30030 September 1999 Forwards Safety Evaluation Accepting plant-specific Safety Evaluation Rept for USI A-46 Program Implementation at Cooper Nuclear Station ML20216J1081999-09-28028 September 1999 Ltr Contract:Task Order 048, Cooper Safety Sys Design & Performance Capability Insp, Under Contract NRC-03-98-021 ML20212J5061999-09-27027 September 1999 Forwards Insp Rept 50-298/99-07 on 990718-0828.No Violations Noted.Inspectors Focused on Implementation of Licensee Reactor Safety & Emergency Preparedness Programs ML20212F3641999-09-22022 September 1999 Forwards Insp Rept 50-298/99-09 on 990823-26.No Violations Noted ML20216J8061999-09-20020 September 1999 Forwards Rev 37 to Safeguards Plan,Iaw Provisions of 10CFR50.(p).Rev Withheld,Per 10CFR73.21 ML20212C4921999-09-15015 September 1999 Forwards Monthly Operating Rept for Aug 1999 for Cooper Nuclear Station.Rept Includes Operating Data Rept,Unit SD Rept & Documentation of Challenges to Safety/Relief Valves ML20212A6061999-09-14014 September 1999 Forwards Insp Rept 50-298/99-08 on 9900816-20.No Violations Noted.Insp Focused on Implementation & Effective Performance of Access Authorization/Fitness-for-Duty (Behavior Observation) Program & Access Control of Personnel ML20211N5271999-09-0202 September 1999 Responds to NRC 990823 RAI Re Y2K Readiness at Cooper Nuclear Station,Per GL 98-01,Suppl 1 05000298/LER-1999-006, Forwards LER 99-006-00 for Cns.Commitments Made by Util Encl1999-08-26026 August 1999 Forwards LER 99-006-00 for Cns.Commitments Made by Util Encl ML20211F1311999-08-24024 August 1999 Forwards Rev 1 to Calculation Nedc 97-044, NPSH Margins for RHR & CS Pumps, in Support of 990615 Proposed Amend to DPR-46 Re Containment Overpressure Contribution to ECCS Pumps NPSH Requirements 05000298/LER-1999-003, Informs That Commitment Re Insp Rept 50-298/98-15 & LER 99-003,to Bound Extent of Condition & Take Appropriate C/As Is Now Complete.Addl Time Is Required to Accommodate Training of Engineering Support Personnel1999-08-23023 August 1999 Informs That Commitment Re Insp Rept 50-298/98-15 & LER 99-003,to Bound Extent of Condition & Take Appropriate C/As Is Now Complete.Addl Time Is Required to Accommodate Training of Engineering Support Personnel ML20211F4661999-08-23023 August 1999 Discusses GL 98-01 Issued by NRC on 980511 & NPPD Responses for Cooper Nuclear Station & 990628 & Results of Visit to Plant on 990811-12.Staff Determined That Integrated Contigency Plan Incomplete & CNS Not Y2K Ready ML20210R0301999-08-12012 August 1999 Forwards Monthly Operating Rept for July 1999 for Cooper Nuclear Station,Iaw Guidance Provided by GL 97-02.Rept Also Includes Documentation of Challenges to Srvs,Per TS 5.6.4 ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210P6761999-08-10010 August 1999 Requests That Following Changes Be Made to Distribution on NRC Correspondence ML20210P6861999-08-0909 August 1999 Forwards Insp Rept 50-298/99-06 on 990530-0717.No Violations Noted.During Insp,Inspectors Identified Two Issues Categorized as Being Low Risk Significance & within Licensee Response Band ML20210N1331999-08-0606 August 1999 Forwards Notice of Withdrawal of Application for Amend to FOL DPR-46.By Ltr Licensee Withdrew Amend Request Which Would Have Revised Usfar to Reflect as-built Configuration of Reactor Bldg Isolation Dampers ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210K6071999-08-0202 August 1999 Submits Withdrawal of Proposed License Amend Re Secondary Containment Isolation Description & Refueling Accident Analysis Results ML20210K3811999-08-0202 August 1999 Forwards Listed Info,Which NPPD Believes Demonstrates Ability to Obtain Funds in Amount of $10 Million for Payment of Such Premiums within Specified Three Month Period,Iaw 10CFR140.21 ML20210G5101999-07-28028 July 1999 Forwards fitness-for-duty Program semi-annual Performance Rept for Period of 990101-0630,per Provisions of 10CFR26.71(d) ML20210D2541999-07-21021 July 1999 Forwards Insp Rept 50-298/99-02 on 990628-0702.Purpose of Insp Was Primarily to Evaluate Effectiveness of Licensed Operator Requalification Program.No Violations Were Identified ML20210C2041999-07-20020 July 1999 Discusses 990715 Mgt Meeting with Midamerican Energy Co Re risk-informed Baseline Insp Program Recently Implemented at Cooper & Fort Calhoun Stations ML20209H8191999-07-15015 July 1999 Forwards Safety Evaluation on GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Cooper Nuclear Station ML20209E6951999-07-12012 July 1999 Discusses Response to RAI on GL 92-01,rev 1,suppl 1, Rv Structural Integrity. Recommends Review of New Database Diskettes on Listed Website.Comments Due by 990901 or Data Entered Into Rvid for Plant Will Be Acceptable ML20209D8731999-07-0808 July 1999 Refers to 990707 Meeting Re Licensee Recent Maintenance Program self-assessment.Also Discussed How Licensee Incorporated Assessment Findings Into Rev of Maintenance Performance Improvement Plan.List of Attendees Encl ML20209B7851999-07-0101 July 1999 Forwards Corrected Occupational Radiation Exposure Repts, for Cys 1996 & 1997.Util Stated That Repts Did Not Properly Tabulate Number of Personnel Receiving Exposures Less than 100 Mrem by Work & Job Functions in CY96 & CY97 05000298/LER-1999-005, Forwards LER 99-005-00 for Cns.Commitments Made by Util Encl1999-07-0101 July 1999 Forwards LER 99-005-00 for Cns.Commitments Made by Util Encl ML20196J2471999-06-29029 June 1999 Discusses Completion of Licensing Action for GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps, 05000298/LER-1999-004, Forwards LER 99-004-01.Commitments Made by Util Are Encl1999-06-28028 June 1999 Forwards LER 99-004-01.Commitments Made by Util Are Encl ML20209B5451999-06-28028 June 1999 Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl ML20196H0331999-06-24024 June 1999 Informs NRC of Deletion of 1991 Commitment Contained in Ltr Re Feedwater Nozzle Bypass Leakage Monitoring at Plant ML20196F7511999-06-24024 June 1999 Discusses 990622 Meeting with Public at Arbor Manor, Alburn,Ne to Provide Overview of Pilot Insp Program ML20209A7221999-06-23023 June 1999 Submits Revised Pages to Proposed Change to Plant TS Previously Submitted in ,Per 990615 Telcon with NRC ML20196F5331999-06-22022 June 1999 Forwards Examination Summary Rept for FW Nozzle Examinations Performed During 1998 Fall Refueling Outage at Cooper Nuclear Station.Rept Covers Past Examinations Up to & Including 1998 Fall Refueling Outage ML20196B4681999-06-17017 June 1999 Forwards TS Bases Changes Made at Plant Subsequent to Receipt of License Amend 178,dtd 980731,for Conversion to Its,Through 990610.List of Effective Pages for TS Bases, Encl ML20196E1411999-06-16016 June 1999 Forwards Insp Rept 50-298/99-05 on 990502-29.Noncited Violations Identified ML20195H8891999-06-14014 June 1999 Forwards Response to NRC 990315 RAI Re GL 95-07, Pressure Locking & Thermal-Binding of SR Power-Operated Gate Valves, 180-day Response Submitted by District on 960213 ML20195F6171999-06-0909 June 1999 Informs That GE Rept, Matl Presented by GE 970709 Meeting at Cooper Nuclear Power Station Re Replacement of ECCS Pump Suction Strainers Between Nppd,Ge & NRC Staff, Will Be Withheld from Public Disclosure as Requested ML20207G3031999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Cooper Nuclear Station EP Implementing Procedure EPIP 5.7.1, Emergency Classification,Rev 24,under 10CFR50,App E,Section V Provisions.No Violations Identified ML20195E2351999-06-0808 June 1999 Forwards Response to NRC 990517 RAI Re Util Proposed Change to TS Re Calibr Frequency of Reactor Recirculation Flow Transmitters Associated with APRM ML20207G4481999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Cooper Nuclear Station EP Implementing Procedure,Epip 5.7.1, Emergency Classification,Rev 23 C2,under Provisions of 10CFR50,App E,Section V ML20207G3001999-06-0707 June 1999 Ack Receipt of Which Transmitted Changes to Cooper Nuclear Station Ep,Rev 33,under Provisions of 10CFR50,App E,Section V.No NRC Approval Required Based on Determination That EP Effectiveness Not Affected by Changes ML20207G4531999-06-0707 June 1999 Ack Receipt of Which Transmitted Changes to Cooper Nuclear Station EP Implementing Procedure EPIP 5.7.1, Emergency Classification,Revision 25,under Provisions of 10CFR50,App E,Section V ML20207D3811999-05-27027 May 1999 Informs That During Next 6 to 12 Months,Starting 990530,NRC Plans to Conduct Insps Shown in Attached Insp Plan.Insps Include Both Planned Baseline & Supplemental Insps (Formerly Core & Regional Initiative Insps) ML20207A5191999-05-19019 May 1999 Forwards Insp Rept 50-298/99-04 on 990321-0501.Four Violations Identified & Being Treated as non-cited Violations 1999-09-30
[Table view] Category:NRC TO UTILITY
MONTHYEARIR 05000298/19900291990-11-0909 November 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-298/90-29 ML20217A3691990-11-0707 November 1990 Forwards Insp Rept 50-298/90-33 on 900904-1016.Violations Noted But Not Cited ML20058G1461990-11-0505 November 1990 Ack Receipt of Submitting Rev 13 to Emergency Plan.Changes Acceptable for Implementation.Commitment Date for Submission of Changes Is 901031 ML20058H0581990-11-0101 November 1990 Forwards List of Unimplemented Gsis,Per Generic Ltr 90-04 IR 05000298/19900251990-10-16016 October 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-298/90-25 ML20059M8751990-10-0202 October 1990 Informs That Util Response to Generic Ltr (GL) 90-03, Relaxation of Staff Position in Generic Ltr 83-28,Item 2.2, Part 2 'Vendor Interface for Safety-Related Components,' Acceptable ML20059M7391990-09-28028 September 1990 Forwards Sys Entry & Retest Insp Rept 50-298/90-31 on 900910-14 & 17.No Violations or Deviations Noted ML20059M4651990-09-27027 September 1990 Forwards Insp Rept 50-298/90-30 on 900827-31 & Notice of Violation ML20059E2691990-08-31031 August 1990 Forwards Safety Evaluation Granting Licensee 900525 Relief Requests RP-14 & RP-15 for Relief from Requirements to Measure Pump Inlet Pressure & Instrument Ranges, Respectively ML20058P4151990-08-0808 August 1990 Forwards Insp Rept 50-298/90-26 on 900616-0715.No Violations or Deviations Noted ML20056A1701990-07-30030 July 1990 Advises That Written Licensing Exams Scheduled on 901119 & Operating Licensing Exams Scheduled on 901120.Preliminary Applications Should Be Submitted at Least 30 Days Prior to Exam Date to Review Training & Experience of Candidates ML20055J2301990-07-24024 July 1990 Forwards Insp Rept 50-298/90-27 on 900709-13.No Violations or Deviations Noted.Actions Taken Re Previous Insp Findings Examined ML20055G8751990-07-20020 July 1990 Forwards Insp Rept 50-298/90-20 on 900611-15 & 25-29.No Violations or Deviations Noted ML20055G1841990-07-18018 July 1990 Confirms 900720 Mgt Meeting in Region IV Ofc Re Emergency Actions Levels,Annual Exercise & Emergency Preparedness Program Enhancements ML20055E6841990-07-0909 July 1990 Discusses Generic Implications & Resolution of Control Element Assemblies at Plant.Util Should Submit Plans & Justification for Any Continued Use of Old Style Control Element Assemblies Beyond Current Cycle for NRC Review ML20055D9441990-07-0505 July 1990 Forwards Insp Rept 50-298/90-22 on 900516-0615.No Violations or Deviations Noted.Actions Taken W/Regard to Previously Identified Insp Findings Examined IR 05000298/19900121990-06-28028 June 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-298/90-12 IR 05000298/19900051990-06-27027 June 1990 Ack Receipt of Informing NRC That Util Evaluated Observation Re Vital Area Key Control,Per Insp Rept 50-298/90-05.Initiatives to Delineate Responsibilities for Vital Key Exchange During Shift Turnover Appropriate ML20055C7741990-06-18018 June 1990 Forwards Insp Rept 50-298/90-18 on 900416-0515.No Violations or Deviations Noted ML20059M9251990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML20248H2791989-10-0606 October 1989 Forwards Comments from Bnwl Re Util Scenario for Exercise Planned on 891025 IR 05000298/19890251989-10-0505 October 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-298/89-25 ML20248E8151989-10-0202 October 1989 Confirms 890926 Telcon Re Change of Dates for Maint Team Insp Preparation Meetings from 891023-25 to 891031-1102 ML20247Q6071989-09-21021 September 1989 Forwards Amend 11 to Indemnity Agreement B-57,reflecting Changes to 10CFR140, Financial Protection Requirements & Indemnity Agreements, for Signature IR 05000298/19890291989-09-19019 September 1989 Forwards Insp Rept 50-298/89-29 on 890801-31.No Violations Noted IR 05000298/19890161989-09-14014 September 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-298/89-16. Implementation of Corrective Actions Will Be Reviewed During Future Insp IR 05000298/19890061989-09-13013 September 1989 Discusses Insp Rept 50-298/89-06 on 890206-10 & Forwards Notice of Violation.Concerns Raised Re Various Failures to Log or Rept Security Incidents.Decision Re Ofc of Investigations Findings Will Be Sent Separately ML20247G8531989-09-12012 September 1989 Forwards Insp Rept 50-298/89-24 on 890731-0804 & Notice of Deviation ML20247D4731989-09-0606 September 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-298/89-22 ML20247C0581989-09-0505 September 1989 Forwards Insp Rept 50-298/89-27 on 890821-25.No Violations or Deviations Noted ML20247G8051989-08-30030 August 1989 Forwards Summary of 890712 Meeting W/Util Re SALP for 880201-890415.Util 890811 Response to SALP Also Encl ML20247B3801989-08-30030 August 1989 Summarizes 890818 Region Iv/Senior Util Executives Meeting in Arlinton,Tx Re General Matters on Topics Discussed, Including SALP Process in Region 4.List of Attendees & Agenda Encl ML20246H9501989-08-28028 August 1989 Forwards Insp Rept 50-298/89-26 on 890717-21.No Violations or Deviations Noted ML20246F8171989-08-25025 August 1989 Forwards Insp Rept 50-298/89-30 on 890807-11.Violations Noted,But No Citation Issued ML20246G3201989-08-22022 August 1989 Forwards Insp Rept 50-298/89-25 on 890701-31 & Notice of Deviation ML20246G1341989-08-22022 August 1989 Documents NRC 890810 Meeting W/Licensee,Including H Parris & Staff in Region IV Ofc to Discuss General Issues of Interest to Licensee & Nrc,Region Iv.Topics Covered During Licensee Presentation Described ML20246E1291989-08-21021 August 1989 Forwards Insp Rept 50-298/89-28 on 890731-0804 & Notice of Violation.Response to One of Two Violations Required ML20245K9991989-08-11011 August 1989 Confirms 890808 Conversation in Which Util Agreed to Participate in 891012 NRC Regulatory Impact Survey.Info Re Survey Provided ML20245J7291989-08-0909 August 1989 Advises of Maint Team Insp Scheduled for Wks of 891113-1204, Per 890807 Telcon.Purpose of Meetings Is to Define Scope of Insp,To Discuss Interfaces Between Team & Staff & to Receive Info to Support Badging Team Members for Unescorted Access ML20245H1131989-08-0404 August 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-298/89-18 ML20248C2121989-08-0303 August 1989 Ack Receipt of in Response to 890608 Notice of Violation Re Insp Rept 50-298/89-19.Util Basis for Denial of Violation Not Substantiated & NRC Concludes That Violation Did Occur ML20247M1671989-07-27027 July 1989 Forwards Insp Rept 50-298/89-21 on 890626-30.No Violations or Deviations Noted IR 05000298/19880291989-07-27027 July 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-298/88-29 ML20236E6561989-07-24024 July 1989 Forwards Insp Rept 50-298/89-23 on 890626-30.No Violations or Deviations Noted ML20247L9501989-07-24024 July 1989 Forwards Insp Rept 50-298/89-22 on 890601-30 & Notice of Violation ML20246M4961989-07-11011 July 1989 Provides Agenda for 890809 Meeting of Senior Util Executives Sponsored by Region IV at Univ of Texas.Recipient Scheduled to co-lead Discussion of SALP Process W/J Milhoan ML20246N2051989-07-10010 July 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-298/89-17 ML20246A7091989-06-22022 June 1989 Forwards Insp Rept 50-298/89-18 on 890416-0531 & Notice of Violation.Nrc Considers Inadequate Station Mod Work Instructions Significant.Other Weaknesses in Plant Mod Process Identified in Paragraph 6 in Insp Rept ML20245K5371989-06-22022 June 1989 Forwards NRR Ack Receipt of Petition Filed by Ecology Ctr of Southern California & Stating That Petition Being Treated Under 10CFR2.206 of NRC Regulations ML20245B5591989-06-20020 June 1989 Forwards SALP Board Rept 50-298/89-12 for 880201-890415.NRC Pleased Overall,Although Sys for Identifying to Mgt Areas Where Corrective Actions Needed Should Be Improved 1990-09-28
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217N1931999-10-22022 October 1999 Forwards Insp Rept 50-298/99-12 on 990927-30.No Violations Noted.Insp Exam of Activities Under License as They Relate to Emergency Preparedness & to Compliance with Commission Rules & Regulations & with Conditions of License ML20217G8771999-10-14014 October 1999 Forwards Insp Rept 50-298/99-10 on 990920-24.No Violations Noted ML20217C2671999-10-0808 October 1999 Forwards Insp Rept 50-298/99-03 on 990823-27 & 0907-10.No Violations Noted.Purpose of Insp to Ensure That Licensee Had Effective Programs for Identifying,Evaluating & Correcting Problems Which Could Impact Safe Plant Operations ML20212K9661999-09-30030 September 1999 Forwards Safety Evaluation Accepting plant-specific Safety Evaluation Rept for USI A-46 Program Implementation at Cooper Nuclear Station ML20216J1081999-09-28028 September 1999 Ltr Contract:Task Order 048, Cooper Safety Sys Design & Performance Capability Insp, Under Contract NRC-03-98-021 ML20212J5061999-09-27027 September 1999 Forwards Insp Rept 50-298/99-07 on 990718-0828.No Violations Noted.Inspectors Focused on Implementation of Licensee Reactor Safety & Emergency Preparedness Programs ML20212F3641999-09-22022 September 1999 Forwards Insp Rept 50-298/99-09 on 990823-26.No Violations Noted ML20212A6061999-09-14014 September 1999 Forwards Insp Rept 50-298/99-08 on 9900816-20.No Violations Noted.Insp Focused on Implementation & Effective Performance of Access Authorization/Fitness-for-Duty (Behavior Observation) Program & Access Control of Personnel ML20211F4661999-08-23023 August 1999 Discusses GL 98-01 Issued by NRC on 980511 & NPPD Responses for Cooper Nuclear Station & 990628 & Results of Visit to Plant on 990811-12.Staff Determined That Integrated Contigency Plan Incomplete & CNS Not Y2K Ready ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210P6861999-08-0909 August 1999 Forwards Insp Rept 50-298/99-06 on 990530-0717.No Violations Noted.During Insp,Inspectors Identified Two Issues Categorized as Being Low Risk Significance & within Licensee Response Band ML20210N1331999-08-0606 August 1999 Forwards Notice of Withdrawal of Application for Amend to FOL DPR-46.By Ltr Licensee Withdrew Amend Request Which Would Have Revised Usfar to Reflect as-built Configuration of Reactor Bldg Isolation Dampers ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210D2541999-07-21021 July 1999 Forwards Insp Rept 50-298/99-02 on 990628-0702.Purpose of Insp Was Primarily to Evaluate Effectiveness of Licensed Operator Requalification Program.No Violations Were Identified ML20210C2041999-07-20020 July 1999 Discusses 990715 Mgt Meeting with Midamerican Energy Co Re risk-informed Baseline Insp Program Recently Implemented at Cooper & Fort Calhoun Stations ML20209H8191999-07-15015 July 1999 Forwards Safety Evaluation on GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Cooper Nuclear Station ML20209E6951999-07-12012 July 1999 Discusses Response to RAI on GL 92-01,rev 1,suppl 1, Rv Structural Integrity. Recommends Review of New Database Diskettes on Listed Website.Comments Due by 990901 or Data Entered Into Rvid for Plant Will Be Acceptable ML20209D8731999-07-0808 July 1999 Refers to 990707 Meeting Re Licensee Recent Maintenance Program self-assessment.Also Discussed How Licensee Incorporated Assessment Findings Into Rev of Maintenance Performance Improvement Plan.List of Attendees Encl ML20196J2471999-06-29029 June 1999 Discusses Completion of Licensing Action for GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps, ML20196F7511999-06-24024 June 1999 Discusses 990622 Meeting with Public at Arbor Manor, Alburn,Ne to Provide Overview of Pilot Insp Program ML20196E1411999-06-16016 June 1999 Forwards Insp Rept 50-298/99-05 on 990502-29.Noncited Violations Identified ML20195F6171999-06-0909 June 1999 Informs That GE Rept, Matl Presented by GE 970709 Meeting at Cooper Nuclear Power Station Re Replacement of ECCS Pump Suction Strainers Between Nppd,Ge & NRC Staff, Will Be Withheld from Public Disclosure as Requested ML20207G3031999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Cooper Nuclear Station EP Implementing Procedure EPIP 5.7.1, Emergency Classification,Rev 24,under 10CFR50,App E,Section V Provisions.No Violations Identified ML20207G4481999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Cooper Nuclear Station EP Implementing Procedure,Epip 5.7.1, Emergency Classification,Rev 23 C2,under Provisions of 10CFR50,App E,Section V ML20207G4531999-06-0707 June 1999 Ack Receipt of Which Transmitted Changes to Cooper Nuclear Station EP Implementing Procedure EPIP 5.7.1, Emergency Classification,Revision 25,under Provisions of 10CFR50,App E,Section V ML20207G3001999-06-0707 June 1999 Ack Receipt of Which Transmitted Changes to Cooper Nuclear Station Ep,Rev 33,under Provisions of 10CFR50,App E,Section V.No NRC Approval Required Based on Determination That EP Effectiveness Not Affected by Changes ML20207D3811999-05-27027 May 1999 Informs That During Next 6 to 12 Months,Starting 990530,NRC Plans to Conduct Insps Shown in Attached Insp Plan.Insps Include Both Planned Baseline & Supplemental Insps (Formerly Core & Regional Initiative Insps) ML20207A5191999-05-19019 May 1999 Forwards Insp Rept 50-298/99-04 on 990321-0501.Four Violations Identified & Being Treated as non-cited Violations ML20206Q6171999-05-17017 May 1999 Forwards RAI Re 990301 & 10 Ltrs Re Proposed TS Changes to Calibr Frequency of Recirculation Flow Transmitters from Once Every 184 Days to Once Every 18 Months.Util Responses Should Be Provided within 30 Days of Ltr Date ML20206P0171999-05-12012 May 1999 Discusses GL 96-05 Issued on 960918 & NPPD Responses Submitted on 961118,970317,980504 & 990222 for Cooper Nuclear Station.Forwards Safety Evaluation Concluding That NPPD Adequately Addressed Actions Requested in GL 96-05 IR 05000298/19980091999-05-12012 May 1999 Refers to Insp Rept 50-298/98-09 Conducted Between 981227-990130.During Insp,Apparent Violation of 10CFR50.50 Identified & Being Treated as non-cited ML20206M1791999-05-11011 May 1999 Informs That NRC Ofc of NRR Reorganized Effective 990328. Reorganization Chart Encl ML20206H4191999-05-0707 May 1999 Informs That on 990407,NRC Administered Gfes of Written Operator Licensing Exam.Licensee Facility Did Not Participate in Exam,However,Copy of Master Exam with Answer Key,Encl for Info.Without Encl ML20206P8961999-05-0707 May 1999 Refers to Meeting Conducted at Region IV Office on 990506 Re Licensee Upcoming Rev to Strategy for Achieving Engineering Excellence & Plans to Achieve Performance Improvements.List of Attendees & Util Presentation,Encl ML20206H7541999-05-0505 May 1999 Forwards Insp Rept 50-298/99-01 on 990207-0320.Violations Being Treated as non-cited Violations ML20205R5541999-04-16016 April 1999 Submits Summary of 990330 Public Meeting in Brownville,Ne to Discuss Results of PPR Completed on 990211,which Allowed for Exchange on New Assessment Process,Current Performance Review & Upcoming Actions Taken in Response to Y2K Concerns IR 05000298/19980221999-03-19019 March 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-298/98-22 on 990107.Finds Reply Responsive to Concerns Raised in NOV ML20205E8991999-03-19019 March 1999 Advises of Completion of Plant Performance Review on 990209 to Develop Integrated Understanding of Safety Performance. Overall Performance Was Acceptable.Problems with Communication in CR Resulted in Several Minor Events ML20204D9451999-03-18018 March 1999 Forwards Insp Rept 50-298/98-09 on 981227-990206.Three Violations Identified & Being Treated as Noncited Violations,Consistent with App C of Enforcement Policy ML20207M9591999-03-15015 March 1999 Forwards Request for Addl Info Re Licensee Response to GL 95-07, Pressure-Locking & Thermal-Binding of Safety-Related Power-Operated Gate Valves, for Cooper Nuclear Station ML20204B6771999-03-15015 March 1999 Submits Withdrawal of Amend Request for Operating License DPR-46.Proposed Change Would Have Modified Facility TSs Pertaining to Neutron Monitoring Neutron Detectors ML20207M9811999-03-15015 March 1999 Advises That Which Withdrew 980415 Amend Request, Being Treated as Withdrawal.Proposed Change Would Have Modified Facility TSs Pertaining to Neutron Monitoring,Flow Biased Rod Block Monitor ML20204B3301999-03-11011 March 1999 Forwards SE Accepting Third 10-year Interval Inservice Insp Program Plan Requests for Relief Numbers RI-13,RI-17 & RI-25 for Plant ML20204B7061999-03-11011 March 1999 Requests Approval of Proposed Operability Criteria for Use in Evaluation & Interim Resolution of Degraded & Nonconforming Conditions with Piping & Pipe Supports at Facility ML20205A5811999-03-0909 March 1999 Forwards Exam Rept 50-298/99-301 for Exam Administered on 990212.Exam Included Evaluation of Four Applicants for Reactor Operator License ML20207K3231999-03-0808 March 1999 Discusses 990224 Meeting Re Staff Critique of Refueling & Equipment Outage RE-18 & Implementation Status of Improvement Strategy for Engineering.List of Attendees & Matl Used in Presentation Encl ML20202G1701999-02-0202 February 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam at Util Facility on 990407.Authorized Representative from Facility Must Submit Ltr Listing Names of Candidates ML20202E3121999-01-22022 January 1999 Forwards Insp Rept 50-298/98-08 on 981115-1226 & Notice of Violation.First Violation Re Staff Failure to Follow Procedures (Two in Operations,One in Maint & One in Plant Support) ML20199G6041999-01-19019 January 1999 Informs That Effective 990118,JN Donohew Has Assumed NRC Project Mgt Responsibility for Cooper Nuclear Station ML20199E1521999-01-0707 January 1999 Forwards Insp Rept 50-298/98-22 on 981116-1208 & Notice of Violation Re Lack of Effective Oversight by Plant Mgt 1999-09-30
[Table view] |
Text
i -
FEB 2 81986 In Reply Refer To:
Docket: 50-298 Nebraska Public Power District ATTN: J. M. Pilant, Manager, Technical Staff-Nuclear Power Group P. O. Box 499 Columbus, Nebraska 68601 Gentlemen:
Thank you for your letter of January 30, 1986, in response to our letter requesting information concerning control room habitability dated December 31, 1985. We have reviewed your reply regarding your position and the additional corrective measures proposed to upgrade the existing control room ventilation system, and find it responsive to the concerns raised in our letter. We will review the implementation of these actions during future inspections.
Sincerely, Orde gg g g.,
J. E. Gas .arca J. E. Gagliardo, Chief Reactor Projects Branch cc:
Guy Horn, Division Manager of Nuclear Operations Cooper Nuclear Station P. O. Box 98 Brownville, Nebraska 68321 Kansas Radiation Control Program Director Nebraska Radiation Control Program Director p bcc: (see next page) / I g
. RIV:FRPS C:FRPSh D:D ' S C:R C:RPBJ REBAER/jt BMurray RL rt JPJau on JEGagli do i /1$/86 1/f/86 g, p { /86 A//86 Shs fd5 8603100678 860228 PDR ADOCK 0500029s O PDR
Nebraska Public Power District '
bcc to DMB (IE06) bec distrib. by RIV:
RPB DRSP Resident Inspector R. D. Martin, RA Section Chief (RPB/A) D. Weiss, LFMB (AR-2015 R&SPB RSB MIS System R. E. Baer RIV File B. Murray RSTS Operator R. L. Bangart W. Gammill, METB, NRR J. Hayes, METB, NRR M. Shanbacky, RI
GENERAL OFFICE
_ = =
Nebraska Public Power District
__ * "?JsYs"n'a'""^M* * '_" __
CNSS867070 January 30, 1986 )[@$h[
I hFEB-51986 Mr. J. E. Gagliardo, Chief Reactor Projects Branch U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011
Subject:
NPPD Respotse to NRC Request for Information Concerning Control Room Habitability
Dear Mr. Gagliardo:
This letter is written in response to your letter dated December 31, 1985, forwarding the comments resulting from the Control Room habitability survey conducted on October 2-3, 1985. In that letter, you identified four conditions which were different than those described by Nebraska Public Power District in a previous su'omittal.
As a matter of clarification, our previous submittal (letter, J. M. Pilant, NPPD to D. G. Eisenhut, NRC,
Subject:
" Post TMI - Requirements / Action Plan",
dated December 30, 1980 LQA8000581) contained responses to several NUREG 0737 items. One of these, Item III.D.3.4, dealt with Control Room Habitability.
Our specific response was in the form of a Control Room Habitability Study which had been performed by a consultant and which was included as an enclosure to the December 30, 1980 letter. During your aforementioned survey, the accuracy and adequacy of this study was questioned. In reviewing this matter, we determined that this study compared existing CNS control room habitability design provisions against pertinent regulatory requirements.
Therefore, the parameters described in the study reflect the "as designed" conditions, versus the " actual" conditions which were measured during your survey. The survey noted these differing conditions, to which you requested a response. Our position regarding each of these conditions is given below.
Where required, short-term corrective actions that have been taken and planned are also described. In addition, our review of this matter also revealed several broader issues which are addressed in the closing paragraphs of this letter.
\
g-(ben , p ";
, ~ n -
-O v J " i u LV& Q
- '. 'J. R. Gagliardo January 30, 1986 Page 2
- 1. Emergency Bypass Filtration Unit December 30, 1980, licensee response:
The CNS Control Room ventilation system is designed to maintain the Control Room at about 1/4" water gauge (WG) positive pressure by supplying air at a high enough pressure that even after system losses and the booster exhaust fan pressures are accounted for, the Control Rocm pressure is still positive. During emergencies, the normal supply is shut of f and either (1) a 225 cubic feet per minute (cfm) makeup bypass train, including a pre-filter, HEPA filter, and carbon absorption filtet is operated, or (2) all outside makeup is shut off.
The as found conditions were:
ANL measured a flow of 600 cfm through this unit.
NPPD Response Even though the flow measured during the survey (600 cfm) is higher than the minimum design value (225 cfm), a conservative margin exists for the capacity of the installed unit. The HEPA filters and charcoal adsorbers are sized to handle a maximum flow rate of 1000 cfm and 666 cfm, respectively. Pre-operational test data established the proper flow to maintain positive Control Room pressure to be 341 cfm. This value has been used as the performance parameter for yearly surveillance testing, with minor variations in actual flow noted over the years. Differences in configuration and measuring instrumentation account for the differences between the 600 cfm and 341 cfm measured values.
As a result of the survey, however, it was determined that the filter unit isolation damper would properly control flow through the unit, but it could not be adjusted to ensure adequate system isolation (a more detailed explanation of this condition is provided in your Item 2.
below). A design change is currently being developed to replace this damper with one of higher quality.
- 2. Infiltration Leakage Rate December 30, 1980, licensee response:
The Control Room area construction is tight, with sealed cable penetrations, tight fitting sealed doors, and tight ventilation louvers with interlocking neoprene edges. The area serviced by the Contrcl Room ventilation system includes the Control Room and the cable spreading room, including kitchen end sanitary areas. Although the cable spreading room does not require access during accident conditions, it contains the air conditioning unit and is a sealed volume, so it does not adversely affect system function.
Upon detection of smoke in the ventilation systeme, all outside air is shut off, since the makeup bypass filter train will be of little value in absorbing the toxic substance. This flow mode will also be initiated
J. R. Grglicrdo
. . January 30, 1986 Page 3 manually during a toxic gas accident. In this case, the only outside air makeup is leakage through the isolation dampers, which has been conse rvatively calculated at 225 cfm. This inleakage is mixed with recirculation flow as discussed above and returned to the Control Room.
The as found conditions were:
With the Control Room normal intake isolated and the emergency bypass filtration unit in operation, ANL measured 1000-2000 cfm of unfiltered inleakage through the normal intake isolation damper, and an exhaust flow of 4000 cfm through the closed exhaust damper.
A flow of approximately 300 cfm was measured thrcugh the emergency bypass filtration unit when the system was isolated.
NPPD Response:
The isolation dampers were inspected and found to be in need of closure adjustment. Maintenance was performed on the intake isolation damper and the exhaust damper to ensure that they closed tightly. The emergency bypass filtration unit inlet isolation damper will be replaced with a higher quality butterfly damper, as previously described.
- 3. Control Room Emergency Zone December 30, 1980, licensee response:
The Control Room emergency zone includes the Control Room, kitchen, toilet, and access area around the Control Room. Also serviced by the Control Room ventilation system is the cable spreading area, which is a sealed volume.
The as found conditions were:
ANL ressured a Control Room pressure of plus 0.1" WG. Ilowever, tests conducted by ANL showed that the cable spreading room, which is within the Control Room envelope, was at a substantially negative pressure with respect to the surrounding areas outside of the envelope.
NPPD Response:
An independent organization has been contracted by NPPD to adjust and balance the Control Room emergency ventilation system to ensure that the Control Room and cable spreading room are maintained at a positive pressure of 0.1" (approximately 1/8") WG, as specified in the Standard Review Plan, Section 6.4.
- 4. Control Room Chillers The Control Room chillers are not specifically addressed in item III.D.3.4; however, NRR had the following observation.
1
.,4. R. Gagliardo January 30, 1986
- Page 4 On loss of offsite power, the Control Room chillers would be cooled by the plant service water system. The NRR representative was informed by the licensee that the capability of this system is questionable due to silt deposition in the service water lines and a plumbing restriction.
NPPD Response:
The existing solenoid globe valves require system operating pressure to provide the opening force for the valves. Should seal or port leakage exist, silt deposition' could conceivably reduce the dependability of these valves to open. Prior to the survey, a design change had been initiated to replace the existing valves with more reliable air operated diaphragm valves. This configuration will eliminate the problems as identified above.
In addition to the conditions noted above, our review of this matter has identified that the existing Control Room ventilation system may not meet all the latest requirements for systems of its type. Our plan of action to upgrade this system is as follows:
- 1. The existing Control Room ventilation system will be reviewed against the latest NRC recommendations and guidance. As a minimum, this review will include the guidance of the Standard Review Plan, Standard Technical Specifications, and pertinent Regulatory Guides.
- 2. Where a significant increase in safety will result, design changes will be implemented to upgrade the existing system. Areas thae. may be impossible to upgrade will be identified and justified.
- 3. Design documents will be updated to reflect the upgraded system configuration. This will include pertinent drawings, related operating and taintenance procedures, and the Updated Safety Analysis Report. Additionally, the CNS Technical Specifications and related Surveillance Procedures will be strengthened to clarify system operability requirements and ensure that they are met.
While several of these corrective measures are currently underway, a definitive completion schedule cannot be developed until the extent of any required design changes has been determined. However, at this point we have ascertained that all corrective measures will be completed prior to the completion of the 1986 Refueling Outage, currently scheduled to begin in October, 1986. In the interim, we feel that the short-term corrective actions described above meet the requirements for the existing Technical Specifications and provide for adequate Control Room habitability.
If you have any questions regarding the responsed contained in this letter, please contact me.
Sincerely, A .Mm w
/
ay M. Pilantu Technical Staff Manager Nuclear Power Group JMP:JMM:ya