Forwards Mgt Meeting Rept 50-293/88-43 on 880408 Re Licensee Power Ascension Program
ML20154J216
Person / Time
Site: Pilgrim
Issue date: 05/17/1988
From: Johnston W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Bird R
BOSTON EDISON CO.
Shared Package
ML20154J220 List:
References
NUDOCS 8805260224
Download: ML20154J216 (2)


See also: IR 05000293/1988043

Text

8

-.. ..

MAY 171988

'

-

.

.

Docket No. 50-293

,

Boston Edison Company

ATTN: Mr. Ralph G. Bird

Senior Vice President - Nuclear

800 Boylston Street

Boston, Massachusetts 02199

Gentlemen:

Subject:

Management Meeting to Discuss Licensee's Power Ascension Program

This letter transmits the details of the Management Meeting held on April 8,

1988 in the Region I office, King of Prussia, Pennsylvania to discuss NRC

concerns regarding the licensee's Power Ascension Program.

We believe the discussions were constructive and beneficial to the NRC and the

Boston Edison Company.

As discussed during the meeting, items requiring

followup were identified and are included in the enclosed report.

If your

understanding of these items differs, please contact M. Evans of our staff at

215/337-5184.

No reply to this letter is required; however, should you have any questions

concerning this matter, we would be pleased to discuss them with you.

Sincerely,

ROBERT M. GALLO

William V. Johnston, Director

Division of Reactor Safety

Enclosures:

1.

NRC Region I Management Report

2.

BECO Presentation Materials

i

0FFICIAL RECORD COPY

8805260224 880517

PDR

ADOCK 05000293

- - _ .

..

___

_

_

_ ._. ._ _ _ _ _ _ . _ , _ _

Em

s

O'

..

r

'

'

2

cc w/ enc 1:

K. Highfill

Station Director-

,

R. Barrett, Nuclear Operations Manager

B. McIntyre, Chairman, Department of Public Utilities

Chairman, Plymouth Board of. Selectmen

Plymouth Civil Defense Director

J. Keyes, Boston Edison Regulatory Affairs and' Programs

E. Robinson, Nuclear Information Manager -

' R. Swanson, Nuclear Engineering Department Manager

The Honorable Edward J. Markey The Honorable Edward P. Kirby

The Honorable Peter V. Forman

S. Pollard, Secretary of Energy Resources

P. Agnes, Assistant Secretary of Public Safety, Commonwealth of

Massachusetts

R. Shimshak, MASSPIRG

A. Blough, NRC:RI, Chief, Reactor Projects Section 3B, DRF

-

S. Collins, NRC:RI, Deputy Director, DRP

J. Durr, NRC:RI, Chief, Engineering Branch, DRS

M.- Evans, NRC:RI, Operations Engineer, DRS

R. Gallo, NRC:RI, Chief Operations Branch, DRS

W.~ Johnston, NRC:RI, Director, DRS

W. Kane, NRC:RI, Director, DRP

.D. Mcdonald, NRC:NRR, Project Manager

.C. Warren, NRC, Senior-Resident Inspector

J. Wiggins,.NRC:RI, Chief, Reactor Projects Branch 3, DRS

'

Public Document Room (PDR)

.

,

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Massachusetts (2)

bec w/ encl:

Region I Docket Room (with concurrences)

M. Perkins, Management Assistant, DRMA (w/o encl) S. Collins, DRP

.

R. Blough, DRP

.

L. Doerflein, DRP

l

R. Bores, DRSS

D. Mcdonald, PM, NRR

PA0 (15) SALP Reports Only

  • f

Q

'

RI:0RS

RI:DRS

%

Evans / tim

Lange

Gd/o

.

5/h/88

5/f/88

5

88

i

0FFICIAL RECORD COPY

MTG RPT PILGRIM 88-043 - 0002.0.0

05/03/88

<

.-