Text
.
._
__
__ .
__ _
.
_
_
_ _ _ _
_
'
NAY l 6 l988
-
'
In Reply Refer To:
Dockets:
50-313/88-11
50-368/88-11
Arkansas Power & Light Company
ATTN:
Mr. Gene Campbell
Vice President, Nuclear
Operations
P.O. Box 551
Little Rock, Arkansas 72203
Gentlemen:
This refers to the inspection conducted by Messrs. D. L. Ke.lley, J. I. Tapia,
and other members of this office during the period April 18-22, 1988, of
activities authorized by NRC Operating Licenses DPR-51 and NPF-6 for the
Arkansas Nuclear One, Units 1 and 2,-and to the discussion of our findings with
Mr. S. M. Quennor and other members of your staff at the conclusion of the
inspection.
The area examined during the inspection included the ANO, Unit 2 containment
Within this area, the inspection consisted of
examination of the CILRT test procedure and representative records, interviews
with personnel, and observations by the NRC inspectors.
The inspection
,
findings are documented in the enclosed inspection report.
'
During this inspection, it was foi
. hat certain of your activities were in
violation of NRC requirementt.
Con:,s quently, you are required to~ respond to
this violation, in writing, in wcordance with the provisions of.Section 2.201
of the NRC's "Rules of Practie.," Part 2, Title 10, Code of Federal
1
Regulations.
Your response should be based on the specifics contained in the
Notice of Violation enclosed with this letter.
The response directed by this letter and the accompanying Notice is not subject
-I
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
il
Original Signed By
A. B. Beach
L. J. Callan, Director
Div' ion of Reactor Projects
Enclosures:
(see next page)
RIV: R
C: TPST4!!,
A
D: {6)
econcur
Ta Q CSeidle
DLKel
ws
M'
can DDChamberlain LJCu lan
CSeidle
5 /i /88
/88
f/ 7 /88
f7[D/88
f//(/88
5 /12 /88
f//4/88
h
8805250251 880516
^
ADOCK 05000313
.
Q
l
.
.
Arkansas Power & Light Company
-2-
l
l
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
,
50-313/88-11
50-360/88-11
cc w/ enclosures:
Arkansas Nuclear One
ATTN:
J. M. Levine, Director
Site Nuclear Operations
P.O. Box 608
Russellville, Arkansas 72801
Arkansas Radiation Control Program Director
bec to DMB (IE01)
bec distrib. by RIV:
- RRI
R. D. Martin, RA
- RPSB-DRSS
- Section Chief (DRP/A)
Lisa Shea, RM/ALF
- RIV Iile
- DRP
- HIS System
- RSTS Operator
- Project Engineer, DRP/A
- G. Dick, NRR Project Manager
- 0RS
- TSS
H. Scott, Acting E0
- D. Ke':ey
- W. Seidle
- J. Tapia
- w/766
,
. -
, , -