Forwards Insp Repts 50-313/88-11 & 50-368/88-11 on 880418-22 & Notice of Violation
ML20154H166
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 05/16/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20154H171 List:
References
NUDOCS 8805250251
Download: ML20154H166 (2)


See also: IR 05000313/1988011

Text

.

._

__

__ .

__ _

.

_

_

_ _ _ _

_

'

NAY l 6 l988

-

'

In Reply Refer To:

Dockets:

50-313/88-11

50-368/88-11

Arkansas Power & Light Company

ATTN:

Mr. Gene Campbell

Vice President, Nuclear

Operations

P.O. Box 551

Little Rock, Arkansas 72203

Gentlemen:

This refers to the inspection conducted by Messrs. D. L. Ke.lley, J. I. Tapia,

and other members of this office during the period April 18-22, 1988, of

activities authorized by NRC Operating Licenses DPR-51 and NPF-6 for the

Arkansas Nuclear One, Units 1 and 2,-and to the discussion of our findings with

Mr. S. M. Quennor and other members of your staff at the conclusion of the

inspection.

The area examined during the inspection included the ANO, Unit 2 containment

integrated leak rate test.

Within this area, the inspection consisted of

examination of the CILRT test procedure and representative records, interviews

with personnel, and observations by the NRC inspectors.

The inspection

,

findings are documented in the enclosed inspection report.

'

During this inspection, it was foi

. hat certain of your activities were in

violation of NRC requirementt.

Con:,s quently, you are required to~ respond to

this violation, in writing, in wcordance with the provisions of.Section 2.201

of the NRC's "Rules of Practie.," Part 2, Title 10, Code of Federal

1

Regulations.

Your response should be based on the specifics contained in the

Notice of Violation enclosed with this letter.

The response directed by this letter and the accompanying Notice is not subject

-I

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

il

Original Signed By

A. B. Beach

L. J. Callan, Director

Div' ion of Reactor Projects

Enclosures:

(see next page)

RIV: R

C: TPST4!!,

A

D: {6)

econcur

Ta Q CSeidle

DLKel

ws

M'

can DDChamberlain LJCu lan

CSeidle

5 /i /88

/88

f/ 7 /88

f7[D/88

f//(/88

5 /12 /88

f//4/88

h

8805250251 880516

^

PDR

ADOCK 05000313

.

Q

DCD

l

.

.

Arkansas Power & Light Company

-2-

l

l

Enclosures:

1.

Appendix A - Notice of Violation

2.

Appendix B - NRC Inspection Report

,

50-313/88-11

50-360/88-11

cc w/ enclosures:

Arkansas Nuclear One

ATTN:

J. M. Levine, Director

Site Nuclear Operations

P.O. Box 608

Russellville, Arkansas 72801

Arkansas Radiation Control Program Director

bec to DMB (IE01)

bec distrib. by RIV:

  • RRI

R. D. Martin, RA

  • RPSB-DRSS
  • Section Chief (DRP/A)

Lisa Shea, RM/ALF

  • RIV Iile
  • DRP
  • HIS System
  • RSTS Operator
  • Project Engineer, DRP/A
  • G. Dick, NRR Project Manager
  • 0RS
  • TSS

H. Scott, Acting E0

  • D. Ke':ey
  • W. Seidle
  • J. Tapia
  • w/766

,

. -

, , -