ML20154G995
| ML20154G995 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 08/12/1998 |
| From: | Barlet J DUKE POWER CO. |
| To: | |
| Shared Package | |
| ML20154G993 | List: |
| References | |
| CNEI-0400-24, CNEI-0400-24-R13, CNEI-400-24, CNEI-400-24-R13, NUDOCS 9810140043 | |
| Download: ML20154G995 (4) | |
Text
CNEI4400-24 Page 1 of 21 Revision 13 l
Catawha Unit 1 Cycle 11 Core Operating Limits Report August 1998 Duke Power Company Date Prepared By:
A g/g/rg Checked By:
g
///z/9/
Checked By:
b A/r/
T [Ia.f'Tg i
J' Q'
I I
Approved By:
N((h
/2./,9 r QA Condition 1 The contents of this document have been reviewed to verify that no material herein either directly or indirectly changes the sesults and conclusions presented in the 10CFR50.59 Catawba 1 Cycle 11 Reload Safety Evaluation.
9810140043 981007 '
PDR ADOCK 05000413
?
PDR3
}
Catawba 1 Cycle Il Czre Opeitting Limits Report CNEI44u0-24 Pege 2 of 21 Revision 13 l
l INSERTION SHEET FOR REVISION 13 l
l Remove Insert j
Pages 1-3,21 Pages 1-3,21 IMPLEMENTATION INSTRUCTION FOR REVISION 13 i
i Revision 13 to the Catawba Unit 1 COLR should be implemented as soon as possible.
1 4
1
Cctawba 1 Cycle 11 C re Operating Limits R: port CNEI-0400-24 Page 3 of 21 Revision 13 l
REVISION LOG
)
1 Revision Effective Date Comment OriginalIssue September 8,1992 CIC07 COLR Revision 1 October 10,1992 CIC07 COLR rev 1 Revision 2 December 1,1993 CIC08 COLR
)
Revision 3 April 14,1994 CIC08 COLR rev 1 j
Revision 4 October 24,1994 CIC08 COLR rev 2 Revision 5 November 30,1994 CIC08 COLR rev 3 Revision 6 February 15,1995 CIC09 COLR l
Revision 7 April 12,1995 CIC09 COLR rev 1 Revision 8 September 28,1995 CIC09 COLR rev 2 j
Revision 9 August 2,1996 CIC10 COLR Revision 10 May 28,1997 CIC10 COLR rev 1 Revision 11 July 1997 CIC10 COLR rev 2 Revision 12 November 1997 CIC11 COLR Revision 13 August 1998 CIC11 COLR rev 1 l-1 l
r
l Cctawba 1 Cycle 11 Care Oper ting Limits Report CNEl-0400-24 Page 21 of 21 Revision 13 l
4 l
3.14 Standby Makeup Pump Water Supply - Boron Concentration (Specification 4.7.13.3) l 3.14.1 Minimum boron concentration limit for the spent fuel pool. Applicable for l
i modes 1,2, and 3.
Parameter Limit Spent fuel pool minimum boron concentration for 2,775 ppm surveillance 4.7.13.3.a.
]
l NOTE: Data contained in the Appendix of this document was generated in the Catawba 1 Cycle 11 Maneuvering Analysis calculational file, CNC-1553.05-004266. The Catawba Nuclear Engineering Section will control this information via computer file (s) and should be contacted if there is a need to access this information.
4 j