ML20154G989

From kanterella
Jump to navigation Jump to search
Forwards Rev 13 to Unit 1 COLR Cycle 11,rev 14 to Unit 2 COLR Cycle 10 & Rev 15 to Unit 2 COLR Cycle 10
ML20154G989
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 10/07/1998
From: Gordon Peterson
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20154G993 List:
References
NUDOCS 9810140042
Download: ML20154G989 (2)


Text

-_ -. --

L 47[

Duke Energy Corpor: tion hji Catawba Nudear Station 4800 Concord Road York, SC 29745 Gary R.1%erson (803) 83142S1 om Vice1%siderst (803) 831-3426nx 4

Octobe r-' 7, 1998 i

U.S. Nuclear Regulatory Commission ATTENTION:

Document Control Desk Washington',

D.C.

20555

Subject:

Duke Energy Corporation Catawba Nuclear Station Unit 1 and 2

{

Docket No.: 50-413, 414 Core Operating Limits Report (COLR)

' Attached, pursuant to Catawba Technical Specification 6.9.1.9, is an information copy of revisions to the Core Operating Limits Report for Catawba Unit 2 Cycle'10 (C2C10) i and Unit 1 Cycle 11 (C1C11).

The C2C10 COLR change, Rev.14, updates the limits for the new Catawba 2 Cycle 10 reload core and C2C10 Rev.15 further updates the power distribution j

surveillance data (Appendix A).

The C1C11 COLR change, l

Rev.13, reflects a correction to the Technical Specification reference.-

Pl' ease direct any questions or concerns to Martha Purser at (803)' 831-4015.

Sincerely, i

/

i

(

G. R.

Peterson

\\

Attachment j ^ m a c --

avJuoJ 9810140042 981007 $

pgNt ADOCK 05000413:

P PDRg

./

QC&\\ b@H7)

_.__._._..m.

i l-(

U.

S.-Nuclear Regulatory Commission L

October 7, 1998 Page 2 l

i xc w/att:

L. A. Reyes, Regional, Administrator USNRC, Region II P.

S. Tam, Project Manager j

USNRC, ONRR D.

J.-Roberts Senior Resident Inspector (CNS) l l

f I

l-i i.

l i

I.

i L

i l

l 1

l'

'