ML20154G753

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-458/85-80 on 851209-13 & Notice of Violation
ML20154G753
Person / Time
Site: River Bend Entergy icon.png
Issue date: 03/05/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: William Cahill
GULF STATES UTILITIES CO.
Shared Package
ML20154G756 List:
References
NUDOCS 8603100093
Download: ML20154G753 (2)


See also: IR 05000458/1985080

Text

_ .

-

..

-

.

-

~.

_

_

__

_ _ _ . .

__ _ .

_

__

e

e

h

MAR

5 1986

,

7

In Reply Refer To:

,

j

Docket: 50-458/85-80

I

,

J

Gulf States Utilities

ATTN: William J. Cahill, Jr.

Senior Vice President

River Bend Nuclear Group

P. O. Box 2951

'

Beaumont, Texas 77704

Gentlemen:

,

i

!

This refers to the inspection conducted by Messrs. Nemen M. Terc and Charles A.

i

Hackney of this office during the period December 9-13, 1985, of activities

)

authorized by NRC Operating License No. NPF-47 for River Bend Station and to

the discussion of our findings with Mr. J. Deddens, Vice President River Bend

)

Nuclear Group and other members of your staff at the conclusion of the

inspection.

i

Areas examined during the inspection included emergency preparedness training,

changes to the emergency plan and followup improvement (Appendix B) items from

,

the emergency sopraisal. Within these areas, the inspection consisted of

j

selective examination of procedures and represelitative records, interviews with

personnel, and observations by the inspectors.

These findings are documented

'

1

in the enclosed inspection report.

l

During this inspection, it was found that certain of your activities were in

violation 'af NRC requirements.

Consequently, you ar'e required to respond to

i

these violations, in writing, in accordance with the provisions of

Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of

Federal Regulations. Your response should be based on the specifics contained

in the Notice of Violation enclosed with this letter.

>

i

The response directed by this letter and the accompanying Notice is not subject

'

l

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

4

f

I

l

v

1

RIV:EP

S

RP&SPSti4 C:EP&S

/C R

C:

A

C:RPB '

NMTerc

CAHackney LAYande

REHa 1

JPJaudon JEGagli 'do

i

l /rb/86

I / 13 / 8 6

l /t3 /8

l /I /86

\\/fl/86 'j, /H /

{h

!

9603100093 060305

g

l

l

PDR

ADOCK 05000458

)

O

PDR

s

i

.

F

4

Gulf States Utilities

-12-

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

jQtisnal Signed b/;"

J. E. Gagliardo, Chief

Reactor Projects Branch

Enclosures:

1.

Appendix A - Notice of Violation

2.

Appendix B - NRC Inspection Report

50-458/85-80

Gulf States Utilities

ATTN:

J. E. Booker, Manager-

i

l

Engineering, Nuclear

Fuels & Licensing

P. O. Box 2951

l

Beaumont, Texas 77704

Louisiana S*. ate University, Govern aent Documents Department

Louisiana Radiation Control Program Director

bcc to DMB (IE35)

bec distrib. by RIV:

  • RPB

DRSP

!

  • Resident Inspector

R. D. Martin, RA

  • Section Chief (RPB/A)
  • D. Weiss, LFMB (AR-2015)
  • MIS System
  • RSB
  • RSTS Operator
  • N. Terc, FRPS
  • R&SPB
  • C. Hackney, FRPS
  • RIV File
  • L. Yandell, FRPS

R. L. Bangart

  • w/766