ML20154G753
| ML20154G753 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 03/05/1986 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | William Cahill GULF STATES UTILITIES CO. |
| Shared Package | |
| ML20154G756 | List: |
| References | |
| NUDOCS 8603100093 | |
| Download: ML20154G753 (2) | |
See also: IR 05000458/1985080
Text
_ .
-
..
-
.
-
~.
_
_
__
_ _ _ . .
__ _ .
_
__
e
e
h
5 1986
,
7
In Reply Refer To:
,
j
Docket: 50-458/85-80
I
,
J
Gulf States Utilities
ATTN: William J. Cahill, Jr.
Senior Vice President
River Bend Nuclear Group
P. O. Box 2951
'
Beaumont, Texas 77704
Gentlemen:
,
i
!
This refers to the inspection conducted by Messrs. Nemen M. Terc and Charles A.
i
Hackney of this office during the period December 9-13, 1985, of activities
)
authorized by NRC Operating License No. NPF-47 for River Bend Station and to
the discussion of our findings with Mr. J. Deddens, Vice President River Bend
)
Nuclear Group and other members of your staff at the conclusion of the
inspection.
i
Areas examined during the inspection included emergency preparedness training,
changes to the emergency plan and followup improvement (Appendix B) items from
,
the emergency sopraisal. Within these areas, the inspection consisted of
j
selective examination of procedures and represelitative records, interviews with
personnel, and observations by the inspectors.
These findings are documented
'
1
in the enclosed inspection report.
l
During this inspection, it was found that certain of your activities were in
violation 'af NRC requirements.
Consequently, you ar'e required to respond to
i
these violations, in writing, in accordance with the provisions of
Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of
Federal Regulations. Your response should be based on the specifics contained
in the Notice of Violation enclosed with this letter.
>
i
The response directed by this letter and the accompanying Notice is not subject
'
l
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
4
f
I
l
v
1
RIV:EP
S
RP&SPSti4 C:EP&S
/C R
C:
A
C:RPB '
NMTerc
CAHackney LAYande
REHa 1
JPJaudon JEGagli 'do
i
l /rb/86
I / 13 / 8 6
l /t3 /8
l /I /86
\\/fl/86 'j, /H /
{h
!
9603100093 060305
g
l
l
ADOCK 05000458
)
O
s
i
.
F
4
Gulf States Utilities
-12-
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
jQtisnal Signed b/;"
J. E. Gagliardo, Chief
Reactor Projects Branch
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-458/85-80
Gulf States Utilities
ATTN:
J. E. Booker, Manager-
i
l
Engineering, Nuclear
Fuels & Licensing
P. O. Box 2951
l
Beaumont, Texas 77704
Louisiana S*. ate University, Govern aent Documents Department
Louisiana Radiation Control Program Director
bcc to DMB (IE35)
bec distrib. by RIV:
- RPB
DRSP
!
- Resident Inspector
R. D. Martin, RA
- Section Chief (RPB/A)
- D. Weiss, LFMB (AR-2015)
- MIS System
- RSB
- RSTS Operator
- N. Terc, FRPS
- R&SPB
- C. Hackney, FRPS
- RIV File
- L. Yandell, FRPS
R. L. Bangart
- w/766