Forwards NRC Review of NSSS Vendor Owners Groups Application of Commission Interim Policy Statement Criteria to STS, in Response to Recipient Rept Identifying Which STS Requirements Should Be Retained in New STS
ML20154F706
Person / Time
Issue date: 05/09/1988
From: Murley T
Office of Nuclear Reactor Regulation
To: Wilgus W
BABCOCK & WILCOX OPERATING PLANTS OWNERS GROUP
Shared Package
ML20154F710 List:
References
NUDOCS 8805240041
Download: ML20154F706 (13)


Text

_ _ _ - _ _ _ __

UNITED STATES

/ 'o

~,,

NUCLEAR REGULATORY COMMISSION

! c WASHINGTON, D. C. 20555 i e

  • %"***l MAY 9 1933 Mr. Walter S. Wilgus, Chainnan The B&W Owners Group Suite 525 1700 Rockville Pike Rockville, Maryland 20852 .

Dear Mr. Wilgus:

This letter is in response to your report identifying which Standard Technical Specification (STS) requirements you believe should be retained in the new STS and which can be relocated to other licensee-controlled documents.

The enclosure to this letter documents the NRC staff's conclusions as to which ]

current STS requirements must be retained in the new STS. These conclusions are based on the Comission's Interim Policy Statement on Technical Specifica- l tion Improvement 5 and on several interpretations of how to apply the screening i criteria contained in that Policy Statement. The NRC staff considered comments made by industry at a March 29, 1988 meeting between NRC, NUMARC, and each Owners Group in making these interpretations.

Based on our review, we have concluded that a significant reduction can be made in the number of Limiting Conditions for Operation (and associated Surveillance Requirements) that must be included in the STS. Our goal is to assure that the new STS contain only requirements that are consistent with 10 CFR 50.36 and have a sound safety basis.

The development of the new STS based on the staff's conclusions will result in more efficient use of NRC and industry resources. Safety improvements are expected through more operator-oriented Technical Specifications, improved Technical Specification Bases, a reduction in action statement-induced plant transients, and a reduction in testing at power.

As you are aware, the NRC staff and industry also have underway a parallel program of specific line item improvements to The both thefor need scope manyand of substance these types of the existing Technical Specifications.

of improvements was identified in the report (NUREG-1024) of a major staff task group establiched in 1983 to study surveillance requirements in Technical i I

Specifications and develop alternative approaches to provide better assurance I that surveillance testing does not adversely impset safety. The NRC will continue to actively identify and pursue the development of specific line item improvements to Technical Specifications and will make these improvements We encour-imediately available to licensees without waiting for the new STS.

age each of the Owners Groups to continue to work with the NRC staff on these types of parallel improvements to existing Technical Specifications. (Q l U

eso m oou 0e0309 DR TOPRP EMVD a

% @e

~ ' ~ ~ ~ ~ - - - - - - , . - , , . _ _ - . ._ _ _ _ _ , _ _ _ _ _

. N-Mr. W. S. Wilgus " U l

We are confident that the enclosed staff report provides an adequate basis for the Owners Groups to proceed with the development of complete new STS in accordance with the Commission's Interim Policy Statement.

We will continue to interact with the NUMARC Technical Specification W9rking 1 Group and each of the individual vendor Owners Groups as needed to keep this important program moving forward.

Sincerely, origin::1 nicaed by Thcr.ar. E. Mar 107 Thomas E. Murley, Director Office of Nuclear Reactor Regulation

Enclosure:

As stated cc see next page )

l 1

l 4

DISTRIBUTION: j OTSB R/F SAVarga DOEA R/F DCrutchfield  !

OTSB Membors JGPartlow  ;

PDR JPStohr hentralFiles JWRoe Murley/Sniezek FJHiraglia TTMartin BABoger CERossi GClainas EJButcher FSchroeder AThadani JRichardson LShao (W.S.WILGUS/LTR/ SPLIT REPORT)

CONCURRENCE:

  • (seepreviousconcurrence)
  • TSB:DOEA:NRR *TSB:NRR *C:TSB:NRR *D:D0EA:NRR *D: DEST:NRR *D: DEST:NRR KDesai:pmc DCFischer EJButcher CERossi AThadani LShao 4/18/88 04/19/88 04/20/88 - 04/22/88 04/26/88 04/26/88
  • D:DREP:NRR/ADT:NRR'k JRStohr TTNartin 1 1 EMyrley

( (.'

04/28/88 05/05/88 d5/h/88 \ ib X I GS p$-

i

_ , - _ _ , ,y r--- - - - . ,-

g  %

Mr. Walter S. Wilgus We are confident that the enclosed staff report provides an adequate basis for the Owners Groups to proceed with the development of complete new STS in accordance with the Commission's Interim Policy Statement.

We will continue to interact with the NUMARC Technical Specification Working Group and each of the individual vendor Dwners Groups as needed to keep this inportant program moving forward.

Sincerely, Thomas E. Murley, Director Office of Nuclear Reactor Regulation

Enclosure:

As stated cc w/ encl:

R. Gill, B&WOG B. Bradley, BWROG E. Lozito, WOG l J. George, WOG i S. Webster, CE0G 1 R. Bernier, CE0G i T. Tipton, NUMARC DISTRIBUTION:

OTSB R/F i 00EA R/F I OTSB Members POR Central Files Murley/Sniezek TTMartin CERossi EJButcher AThadani LShao (W.S.WILGUS/LTR/ SPLIT REPORT)

CONCURRENCE:

  • (see previous concurrence)
  • TSB:00EA:NRR *TSB:hRR *C:TSB:NRR *D:D0EA:HRR *D: DEST:NRR *D: DEST:NRR KDesai:pec DCFischer EJButcher CERossi AThadani LShao 4/18/88 04/1 88 04/20/88 04/22/88 04/26/88 04/26/88
  • D:DREP:NRR ADT NRR D:NRR JRStohr TT artin TEMurley 04/28/88 /jI/88 04/ /88

Mr. Walter S. Wilgus We are confident that the enclosed staff report provides an adequate basis for the Owners Groups to proceed with the development of complete new STS in accordance with the Commission's Interim Policy Statement. We will continue to interact with the NUMARC Technical Specification Working Group and each of the individual vendor Owners Groupsas needed to keep this important program moving forward.

Sincerely, Thomas E. Murley, Director Office of Nuclear Reactor Regulation

Enclosure:

As stated cc w/ encl:

R. Gill, B&WOG B. Bradley, BWROG E. Lozito, WOG J. George, WOG S. Webster, CEOG R. Bernier, CE0G T. Tipton, NUMARC DISTRIBUTION:

0TSB R/F 00EA R/F OTSB Members PDR Central Files Murley/Sniezek TTMartin CERossi EJButcher AThadani LShao (W.S.WILGUS/LTR/ SPLIT REPOR1)

CONCURRENCE: -

N'}CJm' b(.fo f m-TSB:DOEA:NRR TSB~NRR'r1 C:TM ER D DGE :

R D: DEST:NRR D: DEST:NRR KDesai:pmc DCFischer EJWt r @E si AThadani LShao 4/ /F/88 04////88 04/t /88 04417/88 04/ /88 04/ /88 D:DREP:NRR ADT:NRR D:NRR JRStohr TTMartin TEMurley 04/ /88 04/ /88 04/ /88 L_ - - -

Mr. Walter S. Wilgus We are confident that the enclosed staff report provides an adequate basis for the Owners Groups to proceed with the development of complete new STS in accordance with the Commission's Interim Policy Statement. We will continue to interact with the NUMARC Technical Specification Working Group and each of the individual vendor Owners Groupsas needed to keep this important program moving forward.

Sincerely, Thomas E. Murley, Director Office of Nuclear Reactor Regulation

Enclosure:

As stated cc w/ encl:

R. Gill, B&WOG B. Bradley, BUROG E. Lozito, WOG J. George, WOG j

S. Webster, CEOG R. Bernier, CE0G T. Tipton, NUMARC DISTRIBUTION:

i 0TSB R/F DOEA R/F l

OTSB Members PDR Central Files l'urley/Snieze k TTMartin CERossi l EJButcher AThadani LShao (W.S.WILGUS/LTR/ SPLIT REPOR1)

N -

CONCURRENCE:

TSB:DGEA:HRR

b. 6 N}e rad TS(:NRf;C:T RR .  :

YN R D: DEST.h R D: DEST:NR nf KLcsai:pmc DCFischer EJ' r si AThadani LSha,9 fI 4//8/88 04////88 04/4 /88 04 @ 88 040G/88 04/#/88 D:DREP:NRR ADT:NRR D:NRR JR5tohr TTMartin TEliurley 04/ /88 04/ /88 04/ /88

Mr. Walter 5. Wilgus We are confident that the enclosed staff report provides an adequate basis for the Owners Groups to proceed with the development of complete new STS in accordance with the Commission's Interim Policy Statement. We will continue to interact with the NUMARC Technical Specification Working Group and each of the individual vendor Owners Groupsas needed to keep this important program moving forward.

Sincerely, Thomas E. Murley, Director Office of Nuclear Reactor Regulation

Enclosure:

As stated cc w/ encl:

R. Gill, B&WOG B. Bradley, 62ROG E. l.ozito, WOG J. George, WOG S. Webster, CEOG R. Bernier, CE0G T. Tipton, NUMARC DISTRIBUTION:

0TSB R/F 00EA R/F OTSB Members )

l PDR Central Files l l'urley/Snieze k l TTMartin CERossi EJButcher AThadani LShao (W.S.WILGUS/LTR/ SPLIT REPORT)

CONCURRENCE: '

N}C raj  ?)f'fo /.,3 TSB:DGEA:NRR TSB:NRR C: RR .  : .R D: DEST:ltRR D: DEST:NRR KLesai:pmc DCFischer EJ r si AThadani LShao 4/ /8/88 - 04////88 04/4 /88 04/$88 04/ /88 04/ /88 D:DR P: RR ADT:NRR D:NRR JRS 1r TTMartin TEMurley '

ttvC' I' 2 h 04 /88 04/ /88 04/ /88  !

^

wa Aw utG d w nd &> w, yden 'nM gh%c g 4 ^-

g gw  %

gp

Identical Letters mailed to the following:

Mr. R. A. Newton, Chairnen Westinghouse Owners Group Wisconsin Electric Power Company P.O. Box 2046 Milwaukee, WI 53201 Dr. J. K. Gasper, Chairman CE Owners Group Draaha Public Power District 1623 Harney Street ATTN: Jones St. Station Omaha, Nebraska 68102 Mr. Robert F. Janecek, Chairman BWR Owners Group c/o Commonwealth Edison Company Room 34FN East '

P. O. Box 767 '

Chicago, IL 60690 l

l l

4 Mr. Robert F. Janecek gy9 We are confident that the enclosed staff report provides an adequate basis for. i the Owners Groups to proceed with the development of complete new STS in accordance ,

with the Commission's Interim Policy Statement. -

We will continue to interact with the NUMARC Technical Specification Working Group and each of the individual vendor Owners Groups as needed to keep this important program moving forward.

Sincerely, ode * -' --,-abg, Tn .

Thomas E. Murley, Director f Office of Nuclear Reactor Regulation

Enclosure:

As stated ,

t cc see next page j DISTRIBUTION:

OTSB R/F SAVarga ,

1 00EA R/F DCrutchfield I OTSB Members JGPartlow ,

PDR JPStehr Central Files JWRoe Murley/Sniezek FJMiraglia TTMartin BABoger l CERossi GClainas i

EJButcher FSchroeder AThadani JRichardson LShao (W.S.WILGUS/LTR/ SPLIT REPORT)

CONCURRENCE:

4

  • (see previous concurrence)
  • TSB:00EA: NRR *TSB:NRR *C:TSB:NRR *D:00EA:NRR *D: DEST:NRR *D: DEST:NRR 1 KDesai:pmc DCFischer EJButcher CERossi AThadani LShao l i

4/18/88 04/19/88 04/20/88 . 04/22/88 04/26/88 04/26/88 l

  • D:DREP:NRR TADT:NR M l JRStohr TTMartin ,Murley l l

04/28/88 05/05/88 05b/88 i

l l

I

Mr. R. F. Janecek We are confident that the enclosed staff report provides an adequate basis for the Owners Groups to proceed with the development of complete new STS in accordance with the Commission's Interim Policy Statement.

We will continue to interact with the NUMARC Technical Specification Working Group and each of the individual vendor Owners Groups as needed to keep this important program moving forward.

Sincerely.

Thomas E. Murley, Director Office of Nuclear Reactor Regulation

Enclosure:

As stated cc see next page l

l l

DISTRIBUTION:

OTSB R/F 00EA R/F OTSB Members i PDR l Central Files Murley/Sniczek TTMartin CERossi EJButcher AThadant LShao (W.S.WILGUS/L1R/ SPLIT REPORT)

CONCURRENCE: 4
  • (see previous concurrence) l
  • TSB:00EA:NRR *TSB:NRR *C:TSB:NRR *D:DOEA:NRR *D: DEST:NRR *D:0EST:NRR l K0esai:pmc DCFischer EJButcher CERossi AThadani LShao i 4/18/88 04/19/88 04/20/88 04/22/88 04/26/88 04/26/88 l
  • D:DREP:NRR ADT RR D:NRR JRStohr TT.artin TEMurley 04/28/88 0 /3 P/88 05/ /88 i

i

J Mr. R. A. Newton MAi s w We are confident that the enclosed staff report provides an adequate basis for the Owners Groups to proceed with the development of complete new STS in accordance with the Comission's Interim Policy Statement.

He will continue to interact with the NUMARC Technical Specification Working Group and each of the individual vendor Owners Groups as needed ;; keep this important program moving forward.

Sincerely, . y7 wa., u.1d*b Thomas E. Murley, Director Office of Nuclear Reactor Regulation

Enclosure:

As stated cc see next page l

1 DISTRIBUTION-OTSB R/F SAVarga DOEA R/F DCrutchfield 0TSB Mertbers JGPartlow PDR JPStohr Central Files JWRoe Murley/Sniezek FJMiraglia TTMartin BABoger CERossi GClainas EJButcher FSchroeder AThadani JRichardson LShao (W.S.WILGUS/LTR/ SPLIT REPORT)

CONCURRENCE:  !

  • (see previous concurrence)
  • TSB:00EA:NRR *TSB:NRR *C:TSB:NRR *D:00EA:NRR *D: DEST:NRR *D: DEST:NRR KDesai:pmc DCFischer EJButcher CERossi AThadani LShao 4/18/88 04/19 88 04/20/88 04/22/88 04/26/88 04/26/88 q
  • D:DREP:NRR +ADT:NR  : ~ Y' JRStohr TTMartin TEMurley 04/28/88 05/05/88 05/ /88 l

1

l Mr. R. A. Newton We are confident that the enclosed staff report provides an adequate basis for the Owners Groups to proceed with the developcent of complete new STS in accordance with the Commission's Interim Policy Statement.

We will continue to interact with the NUMARC Technical Specification Working Group and each of the individual vendor Owners Groups as needed to keep this important program moving forward.

Sincerely.

Thomas E. Murley, Director Office of Nuclear Reactor Regulation

Enclosure:

As stated ,

i cc see next page l

DISTRIBUTION:

OTSB R/F 00EA R/F OTSB Members POR Central Files Murley/Sniezek TTMartin ,

CERossi EJButcher AThadani LShao (W.S.WILGUS/LTR/ SPLIT REPORT)

CONCURRENCE:

I

  • (see previous concurrence)
  • TSB:D0EA:NRR *TSB:NRR *C:TSB:NRR *D:D0EA:NRR *0: DEST:NRR *0: DEST:NRR KDesai:pmc OCFischer EJButcher CERossi AThadani LShao 4/18/88 04/19 88 04/20/88 04/22/88 04/26/88 04/25/88
  • D:0 REP:NRR ADT/f RR D:NRR JRStohr TWartin TEMurley 04/28/88 05/5'/88 05/ /88 I

Dr. J. K. Gasper We are confident that the enclosed staff report provides an adequate basis for the Owners Groups to proceed with the development of complete new STS in accordance with the Commission's Interim Policy Statement.

We will continue to interact with the NUMARC Technical Specification Working Group and each of the individual vendor Owners Groups as needed to keep this fraportant program moving forward.

Sincerely, Original et;med by Thocas E. Eurley Thomas E. Murley, Director Office of Nuclear Reactor Regulation

Enclosure:

As stated cc see next page DISTRIBUTION:

DT5b R/F SAVarga DOEA R/F DCrutchfield 0TSB Members JGPartlow PDR JPStohr Central Files JkRoe Murley/Sniezek FJMiraglia TTMartin BABoger CERossi GClainas EJButcher FSchroeder AThadani JRichardson LShao (W.S.WILGUS/LTR/ SPLIT REPORT)

CONCURRENCE:

  • (see previous concurrence)
  • TSB:00EA:NRR *TSB:NRR *C:TSB:NRR *D:00EA:NRR *D: DEST:NRR *D: DEST:NRR KDesai:pmc DCFischer EJButcher CERossi AThadani LShao 4/18/88 04/1 /88 04/20/88 04/22/88 04/26/88 04/26/88
  • D:DREP:NRR YADT:NR JRStohr TTMart n l i riey b'Y 04/28/88 05/05/88 03 /88 l

R

Dr. J. K. Gasper .

We are confident that the enclosed staff report provides an adequate basis for the Owners Groups to proceed with the development of complete new STS in accordance with the Comission's Interim Policy Statement.

We will continue to interact with the NUMARC Technical Specification Working Group and each of the individual vendor Owners Groups as needed to keep this important program moving forward.

Sincerely, Thomas E. Murley, Director Office of Nuclear Reactor Regulation

Enclosure:

As stated ,

cc see next page ]

l i

l DISTRIBUTION:

015B R/F

, DOEA R/F a OYSB Members PDR  ;

Central Files Murley/Sniezek TTMartin j CERossi 1 J EJButcher AThadani LShao I

(W.S.WILGUS/LTR/ SPLIT REPORT)

CONCURRENCE:

  • (see previous concurrence) ,
  • TSB:DOEA:NRR *TSB:NRR *C:TSB:NRR *D:00EA:HRR *D: DEST:NRR *D: DEST:NRR i KDesai:pmc DCFischer EJButcher CERossi AThadani LShao  !

4/18/88 04/19/88 04/20/88 04/22/88 04/26/88 04/26/88

  • D:DREP:NRR ADT:NRR D:NRR i JRStohr TTMartin TEMurley )

04/28/88 05///88 05/ /f,9 i i

l