In Reply Refer To:
E II E
Docket: STN 50-482/88-14
Wolf Creek Nuclear Operating Corporation
ATTN: Bart D. Withers
President and Chief Executive Officer
P.O. Box 411
Burlington, Kansas 66839
Gentlemen:
This fomards the final report of the Systematic Assessment of Licensee
Performance (SALP) for the Wolf Creek Generating Station for the period
March 1,1987, through March 31, 1988.
This final report includes:
1.
The corrected SALP Board Report (errata sheet enclosed to document the
basis for changes).
I
2.
A sunnary(WCGS) to discuss the SALP Board Report, meeting at Wolf Creek Gener
i
of our July 20, 1988,
Station
j
3.
Your August 19, 1988, response to the SALP Board Report.
L
I consider the corrective actions discussed in the July 20, 1988, SALP
l
management meeting and in your August 19, 1988, written response to the SALP
Board Report to be responsive to NRC concerns and recommendations.
Your
!
August 19 response identifies a number of factual errors in the SALP Board
3
Report; accordingly, we have made corrections to the report where
appropriate. However, I do not consider these corrections to warrant changes
in any of the SALP performance categories.
Sincerely,
Ortsmi 4*I I
John M. W4"S
%[W
P
EeltD. Martin
0
Regional Administrator
Enclosure:
Errata Sheet
l
cc:
Wolf Creek Nuclear Operating Corporation
ATTN: Otto Maynard, Manager
of Licensing
l
P.O. Box 411
Burlington, Kans
6839
o
$4f lh
!
N$
hI
$ fB
p
RIV:PSA
i
b:PSA
$RR M
D:DRSS
ATHowell;df
B5ar ett
DDChartberlain
P0'Connor
JCalvo
RLBangart
g
g/c'/88
i / 9 /88
1/9/88
$/4/88
}/j/88
j/3/88
g
h
d(6
,ih
S'
D:DRP@
RA ' @
Reconcur
j%
4fd
DDCharberlain
/p
J tlhoan
LJCallan
p / /88
] /;2/88
Q
q
/88
i/(/88
1
(__-__._________________________.
. _ _ _ _ _ - _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ - _ _ _ _ _ _ _ _
__
__. _
s
.
Wolf Creek Nuclear Operating
-2-
Corporation
Wolf Creek Nuclear Operating Corporation
ATTN: Gary Boyer, Plant Manager
P.O. Box 411
Burlington, Kansas 66839
Kansas Corporation Commission
ATTN:
Robert D. Elliott, Chief Engineer
Fourth Floor. Docking State Office Building
Topeka, Kansas 66612-1571
Kansas Radiation Control Program Director
bectoDMB(IE40)
bec distrib. by RIV:
RRI
R. D. Martin, RA
SectionChief(DRP/A)
RPB-DRSS
B. DeFayette, RIII
RIV File
SRI, Callaway RIII
MIS System
RSTS Operator
Project Engineer, DRP/A
Lisa Shea, RM/ALF
P. O'Connor, NRR Project Manager
G. F. Sanborn, E0
J. Taylor. D/IE
Records Center, INPO
J. Calvo, NRR
R. L. Bangart
All RRIs at all RIV sites
s
Chairman L. W. Zech (MS: H-1144)
Com. T. M. Roberts (MS: H-1149)
Comm. F. M. Bernthal (MS: H-1149)
Com. K. M. Carr (M3: H-1149)
Comm. K. C. Rogers (MS: H-1149)
PAO, Region IV
!
1
!
r
.
o
ERRATA SHEET
h
Correction / Basis
17
Replaced with corrected page.
Basis: This change was made based on the licensee's response to
acknowledge that the delay in resolution of the control room access
issue was not fully attributable to the licensee. The NRC Region IV
position on this issue has since been provided to the licensee in
NRC Inspection Report 50-482/8818 dated August 8, 1988. A meeting
with NRC Region IV and licenste management may be scheduled for
final resolution of this issue.
19
Replaced with corrected page.
Basis:
Factual changes based on licensee response.
24
Replaced with corrected page.
Basis:
Factual changes based on licensee response.
27
Replaced with corrected page.
Basis:
Factual changes based on licensee .esponse.
30
Replaced with corrected page.
Basis: Factual changes based on licensee response.
Table 1
Replaced with corrected page.
Basis: Factual changes based on licensee response.
Page 4
Replaced with corrected sage..
of
Basis:
Factual changes >ased on licensee response.
Table 2
,