i 1881888 NRC OPERAllh6 STATUS REPORT COMPLETED If REACTOR Eh6thEER!h6 Illlllt
- 1. 00CtET.... 50-423 0FERAllh6 STATUS a
- 2. REPORT!h6 PERIOD... APRIL 1988 OUTA6E + ONLINE HOURS.. 338.6 + 380.4
- 719.0
- 3. UTIL!iY CONTACT.................A. L. ELMS 203 444 5368 1818888 11888 j
- 4. LICENSED THERMAL P0WER.........................................
3411 MILLSTOWE I i
- 5. NAMEPL ATE R Ai!N6 ( 6ROSS MWE )................................... 1,2 53 N iUNIT3 1
f
- 6. DES!BN ELEC TRIC AL R ATIN6 (NET ME)............................. 1,15 3. 6 1888888888888 i
- 7. MAI! MUM DEPENDA RE CAPActif (SROS$ MWE)........................
1,197.0 i'
IF CHAh6ES DCCUR A80VE $1NCE LAST REPORT, REASONS ARE...........
j N/A 10.POWERLEVELTONHICHRESTRICTED,IFANY(NETMe()...............N!A i
- 11. REASON FOR RESTRICTION, IF ANY....N/A MONTH YEARTODATE CUMULATIVE TO DATE 12.HOURSINREPORT!h6 PERIOD 719.0 2.903.0 17,735.0 13.NUMBEROFHOURSTHEREACTORWASCRITICAL 405.3 1,764.0 13,527.5 l
14.REAtt0RRESERVESHUIDOWNHOURS 20.2 20.2 246.2
- 15. HOURS 6EhERATORONLlhE 380.4 1,572.9 13,163.4
- 16. UN!! RESERVE SHuiDOWN HOURS 0.0 0.0 0.0 i
17.GROSSTHERMALENER6YSENERATED(MW4) 1,285,473.0 5,060,904.0 43,340,336.4 18.GROSSELECTRICALEhER6Y6ENERATED(MWH) 417,168.0 1,761,565.5 14,970,838.5
[
l 19.hEiELECTRICALENER6Y6ENERATED(MWH) 389,630.5 1,458,641.5 14,262,273.4
[
f j
20.UNifSERVICEFAtt0R 52.9 54.2 74.2 1
r l
21.Uh!TAVAILAl!LITYFACTOR 52.9 54.2 74.2 22.UNiiCAFActiYFACTOR(US!h6MDCNET) 47.5 50.0 70.3 I
23.UnliCAPAClfYFPCTORtu$lhSDERNET) 47.0 49.5 69.7 1
l
- 24. UNIT FORCED OUTASE RATE 47.1 19.3 9.9 l
- 25. LN!T FORCED OUTASE HOURS 339.6 375.7 1,450.2 l
SHUTD0t45 SCHEDULED DVER hEtt $11 M;bih5 (itFE, DATE, AhD DURAi!ON OF EACH)..............
N/A i
IF CURRENTLY SWUTDCWN, ESTIMATED STARTUP DAtl......N/A j
GX bl f
8805190329 880430 PDR ADOCK 05000423 l'
l l
R DCD
AVERAGE DAILY Uli1T FWER LEVEL DOCKET to.
50-423 UtilT M111stene Unit 3 DATE 05-03-1988 CCtiPLETQ> BY 1. L. It!5 201-m 53!8 M0tml APRIL DAY AVERAGE DAILY EWER LEVEL DAY AVERAGE DAILY EWER LEVEL (tHE-NET)
(MWE-tIET) 1 1.149 16 0
2 1.148 17 0
3 1.154 18 0
4 1.149 19 0
5 1.150 20 0
6 1.149 21 0
7 1.138 22 0
8 1.137 23 0
9 1.144 24 0
10 1.142 25 0
11 1.147 26 0
12 1.149 27 146 13 791 28 343 14 0
29 __
801 15 0
30 990
e a UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-423 UNIT Millstone Unit No. 3 DATE May 5, 1988 COMaLETF.D BY A.
Elses TELEPHONE (203) 444-5388 REPORT MONTH APRIL 1988 Page 1 of 2 Method of Licensee Cause and Corrective Duration Shutting Event System Component Action to No.
Date Type (1) (Hours)
Reason (2)
Down Reactor (3) Report #
Code Code Prevent Recurrence 88-03 4-13-88 F
330.4 H
3 88-014-00 KE SCN Turbine trip due to low condensor vacuum caused by loss of both circulating water pumps supplying the A Condensor Bay.
The Circulating Water Pumps tripped due to a high differential pressure across the intake TravelinC Screens. The root cause was blockage of the intake structure screens due to envi'indeental conditions.
ImeN*%te corrective action was placir.g all Screen Wash Pumps in service (one pump was out of service).
See LER for subsequent corrective action.
1 2
3 i
F:
Forced Reason:
Method:
Exhibit G - Instructions 5:
Scheduled A - Equipment failure (Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Sheets for C - Refueling 3 - Automatic Scram Licensed Event Report D - Regulatory Restriction 4 - Continued from (LER) File (NOREG-0161)
E - Operator Training & License previous month Examination 5 - Power Reduction 5 F - Adminfstrative (Duration = 0)
Exhibit 1 - Same Source G - Operational Error (Explain) 9 - Other (Explain) 11 - Other (Explain)
UNIT SHUTDOWNS AND POWER REDUCTION 3 DOCKET ND. 50-423 UNIT Millstone Unit No. 3 'I DATE May 5, 1988 COMPLETED BY A. Eles TELEPHONE (203) 444-5388 REPORT MONTH APRIL 1988 Page 2 of 2 Method of Licensee Cause and Corrective Duration Shutting Event System Component Action to No.
Date Type (1) (Hours)
Reason (2)
Down Reactor (3) Report #
Code Code Prevent Recurrence 88-04 4-28-88 F
8.2 A
N/A N/A N/A N/A Turbine off line to repair steam leak on drain piping.
~
1 2
3 4
F:
Forced Reason:
Method:
Exhibit G - Instructions 5:
Scheduled A - Equipment Fe11ure (Explain) 1 - Manual for Preparation of Data B - Maintenance a:- Tast 2 - Manual Scram Entry Sheets for C - Refueling 3 - Automatic Scram Licensed Event Report D - Regulatory Restriction 4 - Continued from (LER) File (NUREG-0161)
E - Operator Training & License previous month Examination 5 - Power Reduction 5 F - Administrative (Duration = 0)
Exhibit 1 - Same Source G - Operational Error (Explain) 9 - Other (Explain)
H - Other (Explain) 1 1
l
1.
.s General Offices + Selden Street, Berlin. Connecticut f.e CCP*e C'O/',us,t ase speta Con #4se' Los min
=.c viruc ac ccwa
P.O. BOX 270 em aan",o" * "**'
H ARTFORD, CONNECTICUT 06141-0270 g
o,
, y,v.. ".". 'u'"*'.
(203) 665-5000 o,
n May 10, 1988 MP-11804 Re:
10CFR50.71(a) l l
U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 l
Reference:
Facility Operating License No. NPF-49 l
Docket No. 50-423 l
Dear Sir:
In accordance with reporting requirements of Technical Specifications Section 6.9.1.5, the Millstone Nuclear Power Station - Unit 3 Monthly Operating Report 88-5 covering operations for the month of April is hereby forwarded.
l Yours truly, l
l NORTHEAST NUCLEAR ENERGY COMPANY h et t
mcu Ste en E. Scace Station Superintendent Millstone Nuclear Power Station SES/AE:jlm l