Monthly Operating Rept for Apr 1988
ML20154D680
Person / Time
Site: South Texas STP Nuclear Operating Company icon.png
Issue date: 04/30/1988
From: Nesrsta J
HOUSTON LIGHTING & POWER CO.
To:
Shared Package
ML20154D658 List:
References
D, NUDOCS 8805190293
Download: ML20154D680 (7)


Text

_.

~

+

k i

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 1 HONTHLY OPERATING REPORT J

HOUSTON LIGHTING AND POWER CO.

[

I 1

t NRC DOCKET NO. 50-498 LICENSE NO. NPF-76 l

j t

Prepared by sT,<. s g Lealf Perfhance Technician Date

' Reviewed by: NI C

' 0'b b d df,4f Pe rf ormanc e/ Te chn ic i a n Supe rv i s o r Date

}

Reviewed By:

,h.

A.A>

rd S'-10

  • 8 8 PlantE'ngge'erind"Ma' nager Date Reviewed B bN, 5-lo-E t

tyf Plant Superiniddent

'l Date j

l Approved By:

7-10-[

{

Plant ManagQ Date

?

I l

t 8805190293 880513 PDR ADOCK 05400498 i

R DCD

.... _ _, _,. _ _ _. _ _,.. -., _ ~..

-.-m.,.~

,,....-4

OPERATING DATA REPORT DOCKET NO.

50-498 UNIT 1

DATE 05/06/88 COMPLETED BY J.J. Nesrsta TELEPHONE 512-972-7827 OPERATING STATUS 1.

REPORTING PERIOD: 04/01-04/30 GROSS HOURS IN REPORTING PERIOD:

719 2.

CURRENTLY AUTHORIZED POWER LEVEL (MVt):3817 MAX. DEPEND. CAPACITY (HWe-Net):Not Determined DESIGN ELECTRICAL RATING"(HWe-Net):1250.6 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY)(HWe-Net): N/A 4.

REASONS FOR RESTRICTION (IF ANY): Unit in power ascension testing phase.

THIS MONTH YR TO DATE CUMULATIVE 5.

NUMBER OF HOURS REACTOR WAS CRITICAL......

665.95 678.25 678.25 6.

REACTOR RESERVE SHUTDOWN HOURS.............

0 0

0 7.

HOURS GENERATOR ON LINE....................

602 602.6 602.6 8.

UNIT RESERVE SHUTDOWN HOURS................

0 0

0 9.

GROSS THERMAL ENERGY GENERATED (HWH)......

663,ll5.2 666,554.2 666,554.2 10.

GROSS ELECTRICAL ENERGY GENERATED.......... 167,270.0 167,312.8 167,312.8 11.

NET ELECTRICAL ENERGY GENERATED (HWH)...... 120,786.0 119,415.0 119,415.0 12.

REACTOR SERVICE FACTOR..................... N/A N/A N/A 13.

REACTOR AVAILABILITY FACTOR................ N/A N/A N/A 14 UNIT SERVICE FACTOR........................ N/A N/A N/A 15.

UNIT AVAILABILITY FACTOR................... N/A N/A N/A 16.

UNIT CAPACITY FACTOR (Using HDC)...........

N/A N/A N/A 17.

UNIT CAPACITY FACTOR (Using Design HWe).... N/A N/A N/A 18.

UNIT FORCED OUTAGE RATE.................... N/A N/A N/A 19.

SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Scheduled 16 day outage to begin 05/01/88 for Essential Cooling Water System rework and Bottom Mounted Instrumentation inspection.

20.

IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A 21.

UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY 03/08/88 03/08/88 INITIAL ELECTRICITY 03/30/88 03/30/88 COMMERCIAL OPERATION 07/01/88 i

NL.SHL,NRC. HOR

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-498 UNIT 1

DATE 05/06/88 COMPLETED BY J.J. Nesrsta TELEPHONE 512-972-7827 MONTH April DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL I

(MWe-Net)

(HWe-Net) i 1

0 17 241 l

2 0

18 213 i

3 0

19 263 I

i 4

9 20 281 5

28 21 277 i

6 0

22 274 7

15 23 275 8

52 24 275 4

9 108 25 271 10 198 26 248 11 195 27 266 12 191 28 266 13 187 29 264 14 191 30 251 15 192 31 N/A 16 199 i

NL.SHL.NRC.MOR

- -... - =.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-498 UNIT NAME 1

DATE 05/06/88 COMPLETED BY J.J. Nesrsta TELEPHONE 512-972-7827 REPORT MONTH April 1

2 No.

Date Type Duration Reason Method of Licensee Systgm Compongnt Cause & Corrective (Hours)

Shutting 3

i Down Reactor Report #

Prevent Recurrence

}

1 1

4 1

88-01 880330 F

69.4 B

3 88-026 EL RLY-86 Reactor Trip due to 3

4 series of Main i

Generator Lockout and a

Main Transformer Lockout Relays i

tripping when a test j

signal was incorrectly inserted into the generator i

control circuits.

I 1

2 3

4 l

F: Forced Reason:

Method:

IEEE 805-1983 S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram.

C-Refueling 3-Automatic Scram.

5 l

D-Regulatory Restriction 4-Cont. of Existing IEEE 803A-1983 i

E-Operator Training & License Examination Outage j

F-Administrative 5-Reduction

~

G-Operational Error (Explain) 9-Other H-Other (Explain) l ML.5HL.NRC.MOR

UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-498 UNIT NAME 1

DATE 05/06/88 COMPLETED BY J.J.

Nesrsta TELEP110NE 512-972-7827 REPORT MONT11 April 1

2 No.

Date Type Duration Reason Method of Licensee Systgm Compongnt Cause & Corrective (Hours)

Shutting Event Code Code Action to 3

Down Reactor Report #

Prevent Recurrence 88-02 880404 S

8.9 B

9 N/A TA TP3 Turbine Overspeed Test (RX Critical) 88-03 880405 S

4.6 B

9 N/A TA TRB Turbine Overspeed Test (Rx Critical) 88-04 880405 S

1.1 B

9 N/A TA TRB Trrbinc Overspeed Test (Rx Critical) 88-05 880406 S

27.8 B

9 N/A TA TRB Steam leak repair.

(Rx Critical) 88-06 880407 F

5.2 D

9 N/A VI TRB Shutdown due to two Control Room HVAC Makeup and one stand-by diesel generator inoperable. Tech Spec shutdown requirement.

[

(Rx Critical) l F: Forced Reason:

Method:

IEEE 805-1983 S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram.

C-Refueling 3-Automatic Scram.

5 D-Regulatory Restriction 4-Cont. of Existing IEEE 803A-1983 E-Operator Training & License Examination Outage F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other N L. 511L. N RC. MO R II-O t he r (Explain) 1 l

Monthly Summary South Texas Project Unit I began the month in a forced outage with power ascension beginning on 04/03/88. The unit operated at 30% reactor power and achieved significant objecti res toward completion of the Startup Testing Program.

On 04/04/88 the unit began supplying a positive net generation.

PORVs and Safety Valves Summary No PORVs or Safety Valves were challenged during this reporting period.