Revised Monthly Operating Rept for Mar 1988
ML20154D675
Person / Time
Site: South Texas STP Nuclear Operating Company icon.png
Issue date: 03/31/1988
From: Nesrsta J
HOUSTON LIGHTING & POWER CO.
To:
Shared Package
ML20154D658 List:
References
NUDOCS 8805190291
Download: ML20154D675 (5)


Text

.

I 4

k SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 1 MONTHLY OPERATING REPORT HOUSTON LIGHTING AND POWER CO.

NRC DOCKET NO. 50-498 LICENSE NO. NPF-76 r

l Prepared by:

S-2-66 Lind Performance Technician Date i

Reviewed by:

/f

'b b

os/4/f Performan T6chnician Supervisor

'Date A

rn) f-/O-M Reviewed By:

PlantEnfeeringManager Date Reviewed By, h\\nt 610k.

r ti Plant SuperintAldent Date Approved By:

SWI

[

l Plant ManagW Date I

I t

i

,8805190291 880513 L

PDR ADOCK 05000498 R

DCD

OPERATING DATA REPORT DOCKET NO.

50-498 UNIT 1

DATE 05/03/88 COMPLETED BY J.J. Nesrsta TELEPHONE 512-972-7827 OPERATING STATUS 1.

REPORTING PERIOD: 03/30-03/31 GROSS HOURS IN REPORTING PERIOD:

39.1 2.

CURRENTLY AUTHORIZED POWER LEVEL (MWt):3817 MAX. DEPEND. CAPACITY (HWe-Net):Not Determined DESIGN ELECTRICAL RATING (MWe-Net):1250.6 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY)(MWe-Net): N/A 4.

REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE 5.

NUMBER OF HOURS REACTOR WAS CRITICAL....... 12.3 12.3 12.3 6.

REACTOR RESERVE SHUTDOWN HOURS.............

0 0

0 7.

HOURS GENERATOR ON LINE....................

0.6 0.6 0.6 8.

UNIT RESERVE SHUTDOWN HOURS................

0 0

0 9.

GROSS THERMAL ENERGY GENERATED (MWH)...... 3439.0 3439.0 3439.0 10.

GROSS ELECTRICAL ENERGY GENERATED......... 42.8 42.8 42.8 11.

NET ELECTRICAL ENERGY GENERATED (MWH)......-1371

-1371

-1371 12.

REACTOR SERVICE FACTOR..................... N/A N/A N/A 13.

REACTOR AVAILABILITY FACTOR................ N/A N/A N/A 14 UNIT SERVICE FACT 0R........................ N/A N/A N/A 15.

UNIT AVAILABILITY FACTOR...................

N/A N/A N/A 16.

UNIT CAPACITY FACTOR (Using MDC)........... N/A N/A N/A i

17.

UNIT CAPACITY FACTOR (Using Design MWe).... N/A N/A N/A 1

18.

UNIT FORCED OUTAGE RATE.................... N/A N/A N/A 19.

SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)

{

Scheduled 16 day outage to begin 05/01/88 for Essential Cooling Water System rework and Bottom Mounted Instrumentation inspection.

20.

IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A i

21.

UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED i

INITIAL CRITICALITY 03/08/88 03/08/88 INITIAL ELECTRICITY 03/30/88 03/30/88 COMMERCIAL OPERATION 07/01/88 i

l l

l i

NL.SHL.NRC. HOR i

l l

l

-e.

e

~,---e--

-,,-a p--,m,,

-s--n--ge----

.g.-,-~

~,-.,-nn,-

, - -,, ~,

-,,-,-,,,,,-,,~aw.c-

,wn.----,,w-,,-_n

-n-,,--m-e-mpw

AVERAGE DAILY UNIT POIER LEVEL DOCKET NO.

50-498 UNIT 1

DATE 05/03/88 COMPLETED BY J.J. Nesrsta TELEPHONE 512-972-7827 r

l HONTH March 1

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

17 0

2 0

18 0

3 0

19 0

4 0

20 0

5 0

21 0

6 0

22 0

7 0

23 0

l 8

0 24 0

9 0

25 0

10 0

26 0

11 0

27 0

12 0

28 0

13 0

29 0

14 0

30 0

15-0 31 0

16 0

NL.SHL.NRC.MOR

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-498 UNIT NAME 1

DATE 05/02/88 COMPLETED BY J.J. Nesrsta TELEPHONE 512-972-7827 REPORT MONTH March I

No.

Date Type Duration Reason Method of Licensee Systgm Compongnt Cause & Corrective (Hours)

Shutting 3

Down Reactor Report #

Prevent Recurrence 88-01 880330 F

38.5 B

3 88-026 EL RLY-86 Reactor Trip due to series of Main Generator Lockout and Main Transformer Lockout Relays tripping when a test signal was incorrectly inserted into the generator control circuits.

F Forced Reason:

Method:

IEEE 805-1983 S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram.

C-Refueling 3-Automatic Scram.

5 D-Regulatory Restriction 4-Cont. of Existing IEEE 803A-1983 E-Operator Training & License Ex,mination Outage F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other H-Other (Explain)

NL.SHL.NRC.MOR k

1 i

PORVs and Safety Valves Summary j

No PORVs or Safety Valves were challenged during this reporting period.