r _.- - _ _ _ _ _
_ - _ _ _ _ _ _ _ -
$ DCib/NAL
- - '
,_ y
,
i
11988
,l
GeorgiaPowerComhairston,III
any
ATIN:
Mr. W. G.
j
Senior Vice President -
'
Nuclear Operations
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
'
SUBJECT:
INSPECTION REPORT NOS. 50-321/88-09 ANO 50-366/88-09
Thank you for your most recent response of July 25, 1988, to our Notice of
Violation issued on March 29, 1988, concerning at.tivities conducted at Plant
Hatch.
We have evaluated your res)onse and found that it meets the
requirements of 10 CFR 2.201.
We will examine the implementation of your
!
corrective actions during future inspections.
l
With respect to violation 88-09-05, in our letter of May 26, 1988, we advised
you that the issue was undenoing a generic review by the Office of Nuclear
Reactor Regulation.
This vid.ation contained two exampits of inadequate bullet
resistant barriers:
utility vents in the roof of the Central Alarm Station,
t
and cable tray openings in the inner wall of the Station.
After careful review
of your denial, we have concluded that the first example occurred as stated, in
that, one vent in the Station roof did not protect the operator beneath it from
<
a direct line of fire by a high powered rifle while the o)erator was performing
essential alarm station functions.
Regarding the seconc example, the small
penetrations located in the wall of the Station were of such dimension and
[
oblique location that a direct line of trajectory to the Station operators did
not exist; therefore
that part of violation 88-09-05 will be deleted from our
i
records.
Prior to tfie conclusion of our inspection, we determined that your
l
corrective action relative to the roof issue was adequate.
An additional
'
response to this letter is not required.
We appreciate your cooperation in this matter.
l
Sincerely,
l
J. Nelson Grace
!
Regional Administrator
cc:
R. P. Mcdonald, Executive Vice
'
President, Nuclear Operations
J. T. Beckham, Vice President,
Plant Hatch
l
(cc cont'd - see page 2)
!
l
8809160015 eso9o3
l
gDR
ACOCK 05000321
I E
-
i
_t e= io/
'
.
- _ _ _ _ _ . _ , _ ,
.
.--- - --
-
_ _ _ _ _ _ _ _ _
__
.
..
,
SEP' 18%
~
'
Georgia Power Company-
2
,
i
,
(cccont'd)
i
H. C. Nix, General Manaaer
0.' N. Fraser, Site Quality
Assurance Manager
L. Gucwa, Manager, Nuclear Safety .
and Licensing
State of Georgia
bec: NRC Resident Inspector
Document Control Desk
,
,
i
e
i
l
[
i
'
!
+
.
l
i
-
'
e
- - . -
- _
,.
_ . . _
,_
.
)
bl
'
g
,
i
To N er
ttetipire
-
C
JPSbhr
Sinkule
l
-.
l
08/pS/8
08/1188
08/PJ88
08M[/88
08/A/88
Wl
Rll
11
l
1
Rll
Rll
1.
f
L/ eye l(p
d
- ,f?
rownlee
s
GJ
s
ME
08/1//88
08/J6/88
01/l88
'88
j
.
l
l
l