ML20154D595

From kanterella
Jump to navigation Jump to search
Ack Receipt of Re Utilization of Group IV Operators at Facilities.Reiterates NRC Position That All Group IV Operators Must Pass NRC Administered Requalification Exam Prior to Performing Licensed Duties
ML20154D595
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 08/31/1988
From: Richardson S
NRC OFFICE OF SPECIAL PROJECTS
To: White S
TENNESSEE VALLEY AUTHORITY
References
NUDOCS 8809160004
Download: ML20154D595 (2)


Text

,

cA AUG 31 1988 i

Docket Nos. 50-259, 50-260, 50-296 License Nos. OPR-33, DPR-52, OPR-68 Mr. S. A. White Senior Vice President, Nuclear Power Tennessee Valley Aythority i

6N 38A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801

Dear Mr. White:

SUBJECT:

Browns Ferry Nuclear Plant-Retesting of Group IV 6perators 1

Thank you for your letter of May 16, 1930, responding to our letter of April 13, 1988 concerning the utilization of Group IV operators at your Browns Ferry Facility. We have reviewed the January 2,1986 Confirmation of Action Letter and all subsequent correspondence including your May 16, 1988 letter and conclude that the position described in our April 13, 1988 letter is correct.

We reiterate our position that all Group IV operators must pass an NRC administered requalification exam prior to performing licensed duties in the startup and rur modes.

We currently anticipate administering requalification examinations consistent with new NRC methodology, in order to evaluate your requalification program prior to restart.

At that time, we intend to additionally accommodate administration of requalification examinations for any Group IV operators you want evaluated for unrestricted license duties.

If you have any questions con erning this matter please contact us.

Sincerely.

Original 51ened by Steven D. E1 chard.cn Steven D. Richardson, Director TVA Projsets Division 4

Office of Special Prrjects J8 Qgo-cc:

J. A. Kirkebo, Vice President, og Nuclear Engineering

$'o H. P. Pomrehn, Site Director Browns Ferry Nuclear Plant

, b, R. L. Gridley, Director 8

Nuclear Safety and Licensing i

,c M. J. May, Site Licensing o

Manager i

J. G. Walker, Plant Manager t

c a.)

TVA Representative. Rockville Office General Counsel, TVA P4 t

h

AVG 31 1933 Tennessee Valley Authority 2

bec: B. D. Liaw, OSP F. R. McCoy, OSP/RII K. P. Barr, OSP/RI!

G. E. Gears, OSP

0. Moran, OSP A. H. Johnson, OSP/RII J. Ru'; berg, OGC NRC Resident Inspector ORS, Technical Assistant NRC Documont Control Desk State of Alabama RI!

OSP 05 /RI!

OSP/R*I OSP/R k hh*,

FMcfo_y WI.

AJohnson:wb CJulian W

1 LK r

8//f/SS 8/24/83 8

/SS 8/j)/SS 8/'2 /88 OSP:1yA:0 SRigfif/hson S/h /S8

_