ML20154D162
| ML20154D162 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 09/09/1988 |
| From: | Morris K OMAHA PUBLIC POWER DISTRICT |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| Shared Package | |
| ML20154D164 | List: |
| References | |
| LIC-88-830, NUDOCS 8809150172 | |
| Download: ML20154D162 (1) | |
Text
W i-Omaha Public Power District 1623 Ham o a gka 68102-2247 j
September 9, 19P8 92 LIC-88-830 U. S. Nuclear Regulatory Comission Document Control Desk Hail Station P1-i37 Washington, DC 2"M55
Reference:
Docket No.50-28b Gentlemon:
Enclosed is omsha Public Power District's R1 guest for Change to B: 11s of Fort Calhoun Station, Unit 1 Technical Specification Section 2.7,
-ilectrical Systems."
This ch.nge is necessary based upon recently completed calculatio s performed to verify the adequacy of the onsite fuel oil storage captcity.
Purstant to 10 CFR 50.36(3), the licensee is requireo to have Technical Specificatsons.
Included is the requirement for a basis to each Technical Specification.
Although required by regulation, the bares are specifically not a part of the Technical Specifications.
As such, significant hazards considerations pursuant to 10 CFR 50.92 are not expressly required.
- However, to alleviate any potential for confusion on this matter, a significant hazards considerations discussion was completed and is attached.
Also attached, pursuant to 10 CFR 170.21, is a check for the application fee of $150.00.
Sincerely, f ' l1 4~
m,,
jj/,-
'K.'J. Morris Division Hanager Nuclear Operations l
KJH/jbk l
l Attachment 8809150172 080909 PDR ADOCK 05000205 l
l P
PNV c:
Mr. H. Eli n % n is. Dia e l
Division of :
9ac'eal 1
301 Cencon; s P.O. Box ?.4~f
- Lincoln, h..
O 65 0(t f, 9 LeBoeuf, Lamb, ut 0
l R. n. * "'n, Regiona
.istrator, NRC Region aV l
P,,
.30, NRC Pro;
- Hanager M
P.
.arrell, MC Senior Resident Inspector um w ggw
~m u s.:
l