In Reply Refer To:
gggg
Docket:
50-298/88-07
Nebraska Public Power District
ATTN: George A. Trevors
Division Manager - Nuclear Support
P. O. Box 499
Columbus, NE
68601
Gentlemen:
This refers to the inspection conducted by Messrs. W. R. Bennett and
E. A. Plettner of this office during the period March 1 through April 15, 1988,
of activities authorized by NRC Operating License DPR-46 for the Cooper Nuclear
Station and to the discussion of our findings with Mr. G. R. Horn and other
members of your staff at the conclusion of the inspection.
Areas examined during the inspection included operational safety verification,
containment lecal leak rate test, monthly surveillance and maintenance
observations, EF walkdown, outage, refueling, shutdown, radiological
protection, and security. Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews with
personnel, and observations by the NRC inspectors.
The inspection findings are
documented in the enclosed inspect;on report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to
these violations,'in writing, in accordance with the provisions of
Section 2.201 of the NRC's "Rules of Practice," Part 2, Title 10, Code of
Federal Regulations.
Your response should be based on the specifics contained
i
in the Notice of Violation enclosed with this letter.
!
We have also examined actions you have taken with regard to oreviously
I
identified inspection findings.
The status of these items is identified in
paragraph 2 of the enclosed inspection report.
The response directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
RI:RIV[ /
SRI:Rik
C:DRP/
D:D P
EJlettner
WRBennetY
EJholler
LJCallan
A
j
f/ /s/88
J /// /88
(//t /88
3 /p /88
/60I
8805190044 880511
ADOCK 05000298
ij
Q
i
._
- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
.
.
.
,
<
,
Nebraska Public Power District
-2-
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
g,,.,n o Acned Bi
,
4. 5. C .
L. J. Callan, Dir< actor
Division of Reactor Projects
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-298/88-07
cc w/ enclosures:
Guy R. Horn, Division Manager
of Nuclear Operations
Cooper Nuclear Station
P. O. Box 98
Brownville, Nebraska
68321
Kansas Radiation Control Program Director
Nebraska Radiation Control Program Director
bcc to DMB (IE01)
bec distrib. by RIV:
- NRC Resident Inspector
R. D. Martin, RA
- Section Chief (DRP/C)
- Lisa Shea, RM/ALF
RPSB-DRSS
- MIS System
- NRC RIV File
- Project Engineer, DRP/C
- RSTS Operator
- W. Long, NRR Project Manager
- R. Hall
- DRS
- TSS
- DRP
- W. R. Bennett
- E. A. Plettner
- w/766
!
!
I
.
l
l
l
l
_.
._
.-