Monthly Operating Rept for Apr 1988
ML20154C232
Person / Time
Site: Callaway Ameren icon.png
Issue date: 04/30/1988
From: Blosser J, Moose J
UNION ELECTRIC CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
ULNRC-1772, NUDOCS 8805180083
Download: ML20154C232 (7)


Text

Part C AVERACE DAILY UNIT P%IR LEVEL DOCKET NO.

50 483 l' NIT NAME CALLA 1 JAY L' NIT 3 DATE 5588 COMPLETED BY J. H. Moose TELEPilONE 314/676 8243 MohTis opril 1988 AVERACE DAILY P%TR LEVEL AVERACE DAILY PokTR LEVEL DAY (Ma'e Ne t )

DAY (Pa'e -Ne t )

1 1106 17 0

2 1101 18 129 3

1108 19 870 4

1099 20 1128 5

1096 21 67 6

1114 22 0

7 1114 23 0

8 1141 24 0

9 1157 25 0

10 1168 26 0

11 1112 27 0

12 1068 28 0

13 1065 29 0

14 1056 30 0

15 980 16 0

0 Page 2 of 4 8805180083 880430 PDR ADOCK 05000483 R

pcn

Part D l

OPERATINC DATA REPORT DOCKET NO.

50-483 l

l UNIT NAME CALLAWAY UNIT 1 DATE 5 5 88 COMPLETED BY J. H. Hoose TELEPHONE 314/676 8243 l

CPERATING STAI1)S 3

CUM )

l 1.

REPORTING PERIOD: APRIL 1988 CROSS 110URS IN REPORTINC PERIOD:

719 2903 29485.5 2

CURRENTLY AUINORIZED POWER LEVEL (Wt):

3565 MAX. DEPEND. CAPACITY (We-Net):

l DESICN ELECTRICAL RATING (MWe Net):

1171 3.

P0kTR LEVEL TO kHIC11 RESTRICTED (IF ANY) (MWe Net):

l l

4 REASONS FOR RESTRICTION (IF ANY):

THIS MONTH YR TO DATE CUMULATIVE 5.

NUMBER OF HOURS REACTOR WAS CRITICAL...............

440.9 2518.6 24496.4 6.

REACTOR RESERVE SHUID0kW ll0URS.....................

0 0

0 7.

HOU RS CENERATOR ON LIN E............................

424.3 2471.9 23926.4 l

8.

UN IT RESERVE SHUIDOWN HOURS........................

0 0

0 9 CROSS THERMAL ENERCY CENERATED (%H)...............

1,401,495 8,299,126 76,570,906

10. CROSS ELECTRICAL ENERCY CENERATED (MkH)............

472,075 2.819,443 25,861,163 1

11. NET ELECIRICAL ENERCY GENERATED (WH)..............

441,600 2.676,000 24,485,043

12. REACTOR SERVICE FACTOR.............................

61.3 86.8 83.1 6

13. REACTOR AVAILABILITY FACTOR........................

61.3 86.8 83.1 14 UNIT SERVICE FACTOR................................

59.0 85.1 81.1 15 UNIT AVAILABILIIT FACTOR...........................

59.0 85.1 81.1 16.

UNIT CAPACITY FACTOR (Us in g MDC)...................

17. UNIT CAPACITY FACTOR (Us ing De sign We)............

52.4 87.7 70.9 18.

UNIT FORCED OUTACE RAIE............................

15.10 7.89 4.49 19.

SHUTDOWNS SCHEDULD OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

20.

IF SHUT D0kW AT END OF REPORTING PERIOD, ESTIMATED DATE OF STARI11P:

  • Due to uprating to 3565 MWt on 4 8 88 the revised Maximum Dependable Capaetty has not been determined yet.

Page 3 of 4 l

l

....___m._

i Part E UNIT SHUIDOL'NS AND F0k'ER REDUCTIONS DOCKET NO.

50-483 UNIT N.'2E CALIAWAY UNI.

DATE 5-5-88 COMPLETED BY J. M. Hoo =

TELEPrf0NE 314/676-8234 REPORT MONTH: April 1988

!TIBOD OF TYPE SHUTTING DOWN F FORCED DURATION IDE REACTOR OR DATE S: SCHEDifLED OIOURS)

REASON REDUCINC POLTR CORRECTIVE ACTIONS /COPMENTP l

4 4/11/88 F

0 A

4 Reduce power to 94% due to tube leak in the IC Feedwater Heater.

5 4/16/88 5

39.1 A

1 Shutdown to repair tube leak in 1C Feedwater Heater.

I 6

4/17/88 F

18.6 A

3 Turbine / Reactor trip cue to steam generator level oscillations during plant startup. LER 88-005-0.

7 4/21/88 F

56.7 A

2 Turbine / Reactor trip due to failure of

'C' feed reg valve. LER l

88-006-0.

l 8

4/23/88 S

180.3 A

1 Cooldown to Mode 5 to repair leaking conoscal.

SUMMARY

l l

l l

REASON METiiOD A EQUIPMENT FAILURE (EXPLAIN) la MANUAL

(

B: MAINT. OR TEST 2: MANUAL SCRAM

(

C: REFUELING 3: AUTOMATIC SCRAM D RECULATORY RESTRICTION 4 OIFER (EXPLAIN)

E OPERATOR TRAINING AND LICENSE EXAMINATION F: ADMINISTRATIVE C: OPERATIONAL ERROR (EIF1.AIN)

H: OINER (EXPLAIN)

Page 4 of 4

r.

~'

'"^ ^

~

~

i o

o I

DOCKET NO.

50 483 1

l UNIT NAME Call.AWAY UNIT 1 i

1 l

DATE 5-5-88 s

l CmPLETED BY J. M. Moose TELEPHONE 314/676 8243

?

l

[

i PART A OPERATIONS StW.ARY f

j The plant operated at approximately 100% power (3411 MWt) untti 4/8/88 when the plant uprated to 3565 HWt. On 4/11/t8, power was reduced to 94% due to a feedvater heater tube leak. The plant was shutdown on 4/16/88 to repair the tube leak. During this shutdown a turbine trip occurred on Hi Hi level in f

l steam generator 'C'.

On 4/17/88, a turbine / reactor trip occurred due to steam generator level oscillations during plant startup. Pwer operations resumed on 4/18/88. On 4/21/88, the plant incurred a manual reactor trip due to a failure of AE-FCV 0530, the 'C' steam generator feedvater regulation valve. A subsequent cooldown to mode 5 was performed to repair a leaking conoseal. Power cperations resumed 4/30/88 I

PART B PORY AND SAPETY VALVE SLW.ARY i

Page 1 of 4 l

i l

Exxcruic n

camay asy May 5. 1988 Nuclear Regulatory Coenission Document Control Desk Washington, DC 20535 ULNRC-1772

Dear Sir:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT APRIL 1988 The enclosed Monthly Operating Report for April 1988 is submitted pursuant to section 6.9.1.8 of the Callaway Unit 1 Technical Specifications. On 4-8-88, Callaway uprated to an authorized power level of 3565 FNt.

Due to the limited tire of operation at this power level, a revised nximum dependable capacity (FNe-NET) has not yet been determined, s&h J. D. Blesser Manager, Callaway Plant p h ?Df 72 y/ crc MET /DSH/ TAM /JMM Enclosure cc: Distribution attached

/*

J Abay Avest PO lbx f32 ftAn 480 fMSf

?-

l ce distribution for ULNRC-1772 i

with enclosures l

Mr. Robert DeFayette, Chief l

Project Section 1A U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Mr. Thomas Alexion (2 copies)

Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission s

Mail Stop P-316 l

]

7920 Norfolk Avenue t

Bethesda, MD 20014 i

1 NRC Resident Inspector t

Manager, Electric Department Missouri Public Service Commission P. O. Box 360 Jefferson City, MO 65102 l

f l

4

)

i j

l l

4 i

d l

t-

e.

t bec distribution for ULNRC-1772 with enclosures Records Center Institute of Nuclear Power Operations l

Suite 1500 i

1100 circle 75 Parkway Atlanta, CA 30339 American Nuclear Insurers Library c/o Dottie Sherman The Exchange Suite 245 270 Farmington Avenue Farmington. CT 06032 Mark Parvin Callavay Project Hanager Westinghouse Electric Corp.

i P. O. Box 355 Pittcburgh, PA 15220 l

D. F. Schnell (400)

R. J. Schukai (470)

F. W. Brunson (470)

T. P. Sharkey A. P. Neuhalfen W. R. Campbell l

A. C. Passwater/D. E. Shafer/D. J. Walker (470)

I G. A. Hughe6 i

C. J. Creschin J. R. Peevy W. R. Robinson R. R. Roselius i

J. R. Polchow I

M. E. Taylor D. E. Young l

Z170.04 (QA Record)

S. L. Auston (NSRB) (470)

T. A. Moser J. M. Moose (2)

R. L. Kelly (460)

R. J. Irwin/J. M. Brown (490)

JDB Chrono i

3456-0021.6 G56.37 N. Date