Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217K4391999-10-18018 October 1999 Provides Response to RAI to Support USI A-46 Program Submittal for North Anna Power Station,Units 1 & 2.Rev 10 to BNL Rept 52361,encl ML20217H3301999-10-14014 October 1999 Forwards Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su. No New Commitments Intended by Ltr ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML20216K1681999-10-0101 October 1999 Forwards Vols I-VIII of Rev 35 to UFSAR for Naps.Rev Also Includes Update to Chapter 17 of Ufsar,Which Contains Operational QA Program.Changes to Program Description Do Not Reduce Commitments Contained Therein ML20212J9101999-10-0101 October 1999 Forwards SE Accepting Licensee 990916 & 27 Relief Requests IWE-3 for Plant.Se Addresses Only IWE-3 Due to Util Urgent Need for Relief.Requests IWE-7 & IWE-8 Will Be Addressed at Later Date ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML20212G5091999-09-22022 September 1999 Forwards in Triplicate,Applications for Renewal of Licenses for Listed Individuals.Encls Withheld,Per 10CFR2.790(a)(6) ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML20216E6661999-09-10010 September 1999 Forwards Analysis of Capsule W Virginia Power North Anna Unit 1 Nuclear Power Plant Reactor Vessel Matl Surveillance Program, for Capsule Withdrawn on 980922 ML20211N2531999-09-0808 September 1999 Responds to Request to Exceed 60,000 Mwd/Mtu Lead Rod Burnup in Small Number of Fuel Rods in North Anna Unit 2.Informs That NRC Offers No Objection to Requested Use of Rods in Reconstituted Fuel Assembly.Se Supporting Request Encl ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML20211L9151999-09-0101 September 1999 Forwards Response to NRC Request for Comments Re Closure of Review of Response to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity ML20211J2211999-08-31031 August 1999 Approves Request to Remove Augmented ISI (Aii) Program for RCS Bypass Lines from North Anna Licensing Basis.Se Re Request to Apply LBB to Eliminate Augmented Insp Program on RCS Bypass Lines Encl ML20211H4131999-08-27027 August 1999 Informs That Util Revised Encl Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints, Discussing Steam Flow/ Feed Flow Mismatch Portion of Steam Flow/Feed Flow Mismatch & Low SG Water Level Reactor Trip Setpoint ML20138B3241999-08-23023 August 1999 Forwards Draft Response to Question 1 Re NAPS USI A-46 ML20211D9041999-08-20020 August 1999 Forwards Revised Pages to Third Ten Year ISI Program & Relief Requests, Replacing Pages in 990408 Submittal ML20211B3871999-08-17017 August 1999 Requests Permission to Routinely Discharge from SW Reservior to Waste Heat Treatment Facility Under Existing Vpdes Permit Through Outfalls 108 & 103.Discharges Are Scheduled to Commence on 990907,due to High Priority Placed on Project ML20210T0671999-08-13013 August 1999 Informs of Completion of Review of Proposed Revs of Schedule for Withdrawal of Rv Surveillance Capsules Submitted by VEPCO on 981217.Approves Proposed Revs.Forwards Safety Evaluation ML20210Q9841999-08-12012 August 1999 Forwards Rev 1 to Vepc COLR for North Anna Unit 2,Cycle 13 Pattern Ud, Per TS 6.9.1.7.d.COLR Was Revised to Include Temp Coastdown Operation at End of Cycle 13 ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML20210N2921999-08-0505 August 1999 Discusses Which Submitted Proposed TSs Bases Change for Containment Leakage. Licensee Changes to Bases May Be Subj to Future Insps or Audits ML20210J8861999-08-0202 August 1999 Provides Clarification to Commitment Made in Identifying Extent by Which Existing Plant Design Complied with RG 1.97,specifically Re Variable, Radiation Exposure Rate ML20210F6121999-07-28028 July 1999 Forwards Supplemental Info on Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit,Documenting Info Provided During 990624 Meeting & Suppl Original Submittal ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML20209E7621999-07-0909 July 1999 Provides Addl Info to Justify Use of Less than One Gpm Detectable Leakage Rate to Establish Required Margin for Crack Stability in LBB Analysis,Per 980623 Application on Reactor Coolant Loop Bypass Lines ML20209E3711999-07-0202 July 1999 Forwards Insp Repts 50-338/99-03 & 50-339/99-03 on 990425-0605.Violations Being Treated as Noncited Violations ML18152B4401999-07-0101 July 1999 Informs NRC That on 990511,Dominion Resources,Inc,Executed Amended & Restated Agreement & Plan of Merger with Consolidated Natural Gas Co ML18152B4371999-06-24024 June 1999 Forwards Response to NRC Request for Clarification of Relief Requests Submitted on 990212,requesting Relief from Performing Hydrostatic Testing for Certain Small Diameter Class 1,RCS Pressure Boundary Connections ML20196G2581999-06-23023 June 1999 Discusses Closure of GL 92-01,rev 1,suppl 1,reactor Vessel Structural Integrity ML20196F1151999-06-22022 June 1999 Forwards Relief Requests NDE-047 & NDE-048 for North Anna Power Station,Unit 1 Re ASME Section XI ISI Program ML20212J2951999-06-22022 June 1999 Forwards Corrected Markup & Typed Version of Affected Pages. Requests That Attached Pages for Those Previously Provided in 990506 Submittal Be Replaced & Incorporated Into NRC Review of Proposed TS ML18152B4361999-06-22022 June 1999 Forwards Response to RAI Re Surry & North Anna Power Stations,Units 1 & 2,per GL 96-06 ML20196G2211999-06-21021 June 1999 Forwards Licensee Sampling & Testing Obligations Re Vpdes Permit VA0052451 Reissuance Application.Details of Requests for Sampling & Testing Waivers,Included ML20195J7011999-06-15015 June 1999 Forwards Revised EPIP 2.01 Which Corrects Typo That Was Found in Step 10 of Procedure.Rev Does Not Implement Actions That Decrease Effectiveness of EP ML20195J1391999-06-11011 June 1999 Submits Addl Info as Addendum to Original Application Which Proposed Use of Three Chemicals in Bearing Cooling Tower at North Anna Power Station,Per Reissuance of Vpdes Permit ML18152B4301999-06-0303 June 1999 Informs of Util Intention to Revise Schedule for Submittal of License Renewal Applications for Surry & North Anna Power Stations to March 2002 ML20195C6601999-06-0101 June 1999 Forwards Response to NRC 990216 RAI Re Summary Rept of USI A-46 Program ML18152B4261999-05-28028 May 1999 Provides Formal Notification of Effect of Recent Organizational Restructuring on OLs of North Anna & Surry Power Stations,Per NRC 990513 Telcon Request ML20207C9851999-05-28028 May 1999 Requests Regrading of RT Robinson 990408 Written Exam,Based on Listed Reasons.Answer C for Question 18 Is Requested to Be Reconsidered as Correct or Question Be Deleted ML18152B4221999-05-27027 May 1999 Forwards Info Concerning Changes to ECCS Evaluation Models & Application in Existing Licensing Analyses for Surry & North Anna Power Stations,Units 1 & 2 ML18152B4231999-05-26026 May 1999 Informs That Vepc Will Revise 180 Day Response to NRC GL 96-05,within 120 Days of Date of Ltr to Incorporate Commitment to Participate in Joint Owners Group Program as Applicable ML20206U7441999-05-20020 May 1999 Informs That NRC Unable to Conclude That NAPS Has Met Intent of Supplement 4 to GL 88-20.RAI Re Fire Area of IPEEE Encl. Response Requested within 90 Days of Submittal Date ML20207A8541999-05-20020 May 1999 Forwards RAI Re Licensee Listed Responses to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves. Response Requested within 90 Days of Submittal Date ML20195B5381999-05-14014 May 1999 Forwards Rev 8,Change 2 to North Anna Units 1 & 2 IST Programs for Pumps & Valves. Summaries of Program Changes Provided for Each Unit IST Program.Relief Requests Have Been Removed from IST Programs ML18152A3701999-05-13013 May 1999 Submits Proposal to Use Provisions of ASME Section XI Code Case N-597 for Analytical Evaluation of Class 1,2 & 3 Carbon & Low Alloy Steel Piping Components Subjected to Wall Thinning as Result of Flow Accelerated or Other Corrosion ML20206L4661999-05-10010 May 1999 Forwards SE Accepting Request to Delay Submitting Plant, Unit 1 Class Piping ISI Program for Third Insp Interval Until 010430,to Permit Development of Risk Informed ISI Program for Class 1 Piping 1999-09-08
[Table view] Category:NRC TO UTILITY
MONTHYEARML20062D7631990-11-0606 November 1990 Forwards FEMA Re Plant Emergency Exercises on 900808.Two Deficiences in Offsite Performance Noted ML20058H0211990-10-29029 October 1990 Forwards Insp Repts 50-338/90-26 & 50-339/90-26 on 900908-24 & 1009-12.No Violations or Deviations Noted ML20058D7431990-10-26026 October 1990 Grants 901004 Request for Waiver from Tech Spec 6.9.1.7 Re Submittal of Core Surveillance Rept IR 05000338/19900181990-10-25025 October 1990 Ack Receipt of Re Violations Noted in Insp Repts 50-338/90-18 & 50-339/90-18 ML20058D7291990-10-25025 October 1990 Ack Receipt of Re Violations Noted in Insp Repts 50-338/90-18 & 50-339/90-18 ML20058B4151990-10-24024 October 1990 Ack Receipt of 880808 & 900613 Responses to NRC Bulletin 88-004 Re Potential safety-related Pump Loss ML20058E9271990-10-23023 October 1990 Forwards SALP Repts 50-338/90-22 & 50-339/90-22 for June 1989 - Aug 1990 ML20058E5771990-10-23023 October 1990 Forwards Requalification Exam Rept 50-338/OL-90-01 for Units 1 & 2 Administered During Wks of 900820 & 27 ML20062C4311990-10-18018 October 1990 Forwards SE & TER Concluding That Util Actions Do Not Conform to Requirements of Station Blackout Rule.Plant Emergency Diesel Generators Do Not Have Excess Capacity Available to Qualify Generators as Aac Source ML20062B2531990-10-12012 October 1990 Requests That Analyses of Liquid Samples Spiked W/ Radionuclides Be Completed as Soon as Practicable,But No Later than 60 Days from Receipt of Samples.Results Should Be Sent to DM Collins at Listed Address ML20062B6471990-10-11011 October 1990 Advises That Rev 15 to Guard Training & Qualification Plan Consistent w/10CFR50.54(p) & Acceptable ML20058B4241990-10-10010 October 1990 Confirms Region II Insp of fitness-for-duty Program on 901023-25.Tentative Itinerary Encl ML20058B3871990-10-10010 October 1990 Forwards Details Re Allegation Rept Rii 90-A-0152,per 901001 Telcon.Encl Withheld (Ref 10CFR2.790) ML20058A8481990-10-0909 October 1990 Forwards Insp Repts 50-338/90-23 & 50-339/90-23 on 900819- 0915.Violation Noted But Not Cited ML20059N1011990-09-19019 September 1990 Forwards Insp Repts 50-338/90-19 & 50-339/90-19 on 900820-24.Violations Noted But Not Cited ML20059K7941990-09-11011 September 1990 Forwards Insp Repts 50-338/90-18 & 50-339/90-18 on 900708- 0818 & Notice of Violation ML20059K7301990-09-0707 September 1990 Ack Receipt of in Response to Violations Noted in Insp Repts 50-338/90-11 & 50-399/90-11.Expresses Appreciation Re Issues Concerning EOPs & Abnormal Procedures ML20059K6811990-09-0606 September 1990 Forwards Insp Repts 50-338/90-20 & 50-339/90-20 on 900806- 10.No Violations or Deviations Noted ML20058P8841990-08-0606 August 1990 Forwards Insp Repts 50-338/90-16 & 50-339/90-16 on 900709-13.No Violations or Deviations Noted ML20056A0491990-07-30030 July 1990 Forwards Insp Repts 50-338/90-17 & 50-339/90-17 on 900709-13.No Violations or Deviations Noted ML20055H3831990-07-25025 July 1990 Confirms 900720 Verbally Granted Temporary Waiver of Compliance from Tech Spec 3.3.1.1,Table 3.3-2 Re Response Time Testing of Pressurizer High Level Reactor Trip Function ML20056A5331990-07-20020 July 1990 Forwards Summary of 900718 Mgt Meeting at Plant Re self-assessment of Facility ML20055H4401990-07-0505 July 1990 Ack Receipt of Providing Scenario for Plume & Injection Pathway Exercise Scheduled on 900807 & 08 ML20055H4491990-07-0303 July 1990 Forwards Summary of 900625 Meeting W/Util in Region II Ofc Re Emergency Preparedness Upgrade Program.List of Attendees Also Encl ML20055H6151990-06-28028 June 1990 Forwards Insp Repts 50-338/90-13 & 50-339/90-13 on 900514-18 & 29.Noncited Violations Noted ML20055H6271990-06-26026 June 1990 Forwards Insp Repts 50-338/90-14 & 50-339/90-14 on 900604-08.No Violations or Deviations Noted ML20059M8771990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML20248B4731989-09-21021 September 1989 Forwards Insp Repts 50-338/89-26 & 50-339/89-26 on 890716- 0822 & Notice of Violation ML20247P4281989-09-18018 September 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-338/89-12 & 50-339/89-12 ML20247C2011989-09-0707 September 1989 Forwards Safety Evaluation Accepting Util 890512 Response to IE Bulletin 80-11, Masonry Wall Design IR 05000338/19890181989-09-0101 September 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-338/89-18 & 50-339/89-18.Implementation of Corrective Actions Will Be Examined During Future Insps ML20246M7141989-08-23023 August 1989 Forwards Insp Repts 50-338/89-22 & 50-339/89-22 on 890601-0714.No Violations or Deviations Noted ML20246M5381989-08-22022 August 1989 Forwards Insp Repts 50-338/89-27 & 50-339/89-27 on 890731-0804.No Violations or Deviations Noted ML20246M4781989-08-21021 August 1989 Confirms 890627 Telcon Between Rf Saunders & PE Fredrickson Re 890824 Mgt Meeting.Meeting Requested to Review Results of SALP Program for Facility IR 05000338/19890141989-08-21021 August 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-338/89-14 & 50-339/89-14 ML20246H2371989-08-21021 August 1989 Forwards Safety Sys Outage Mods & Maint Team Insp Repts 50-338/89-200 & 50-339/89-201 During Wks of 890508 & 22.No Violations Noted.Identified Weaknesses Re Performance of Vendor Surveillance Activities ML20246L2331989-08-15015 August 1989 Forwards SALP Repts 50-338/89-16 & 50-339/89-16 for May 1988 - May 1989.Overall Performance Satisfactory During Assessment Period ML20245L3381989-08-0707 August 1989 Forwards Insp Repts 50-338/89-24 & 50-339/89-24 on 890710-14.No Violations or Deviations Noted IR 05000338/19890111989-08-0303 August 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-338/89-11 & 50-339/89-11 ML20248D9791989-08-0303 August 1989 Forwards Request for Addl Info Re Pipe Stresses Due to Differential Settlement Between Svc Bldg & Main Steam Valve House.Responses Should Be Provided in Forthcoming License Amend Request ML20248D9011989-08-0303 August 1989 Advises That NRC Approval Neither Granted Nor Required in Case of Certification Since Util Assumes Responsibility for Regulatory Compliance w/10CFR55.45(b)(2) ML20248D2571989-07-31031 July 1989 Forwards Corrected Pages 1 & 2 to Insp Repts 50-338/89-12 & 50-339/89-12 Due to Pages Not Being Photocopied Correctly ML20246A3941989-07-28028 July 1989 Forwards Insp Repts 50-338/89-21 & 50-339/89-21 on 890613-14.No Violations or Deviations Noted IR 05000338/19890151989-07-25025 July 1989 Ack Receipt of Re Violations Noted in Insp Repts 50-338/89-15 & 50-339/89-15 ML20247D5211989-07-17017 July 1989 Forwards Insp Repts 50-338/89-12 & 50-339/89-12 on 890412-14 & 20-26 & Notice of Violation ML20247D5161989-07-12012 July 1989 Forwards Summary of Mgt Meeting Held on 890619 at Region II Ofc Re self-assessment of Facility.List of Attendees & Handout Encl ML20246K3031989-07-0707 July 1989 Forwards Insp Repts 50-338/89-19 & 50-339/89-19 on 890605-09.No Violations or Deviations Noted ML20246G1361989-07-0505 July 1989 Discusses Insp Repts 50-338/89-08,50-339/89-08,50-338/89-14 & 50-339/89-14 & Forwards Notice of Violation.Violations Noted:Inadequate Svc Water Supply to safety-related Spray Sys During Accident Conditions.W/O Notice of Violation ML20246D4191989-06-30030 June 1989 Advises That 890329 Rev 22 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20246E7221989-06-30030 June 1989 Forwards Insp Repts 50-338/89-20 & 50-339/89-20 on 890605-09 & 12-13.No Violations or Deviations Noted 1990-09-07
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20212J9101999-10-0101 October 1999 Forwards SE Accepting Licensee 990916 & 27 Relief Requests IWE-3 for Plant.Se Addresses Only IWE-3 Due to Util Urgent Need for Relief.Requests IWE-7 & IWE-8 Will Be Addressed at Later Date ML20211N2531999-09-0808 September 1999 Responds to Request to Exceed 60,000 Mwd/Mtu Lead Rod Burnup in Small Number of Fuel Rods in North Anna Unit 2.Informs That NRC Offers No Objection to Requested Use of Rods in Reconstituted Fuel Assembly.Se Supporting Request Encl ML20211J2211999-08-31031 August 1999 Approves Request to Remove Augmented ISI (Aii) Program for RCS Bypass Lines from North Anna Licensing Basis.Se Re Request to Apply LBB to Eliminate Augmented Insp Program on RCS Bypass Lines Encl ML20210T0671999-08-13013 August 1999 Informs of Completion of Review of Proposed Revs of Schedule for Withdrawal of Rv Surveillance Capsules Submitted by VEPCO on 981217.Approves Proposed Revs.Forwards Safety Evaluation ML20210N2921999-08-0505 August 1999 Discusses Which Submitted Proposed TSs Bases Change for Containment Leakage. Licensee Changes to Bases May Be Subj to Future Insps or Audits ML20209E3711999-07-0202 July 1999 Forwards Insp Repts 50-338/99-03 & 50-339/99-03 on 990425-0605.Violations Being Treated as Noncited Violations ML20196G2581999-06-23023 June 1999 Discusses Closure of GL 92-01,rev 1,suppl 1,reactor Vessel Structural Integrity ML20206U7441999-05-20020 May 1999 Informs That NRC Unable to Conclude That NAPS Has Met Intent of Supplement 4 to GL 88-20.RAI Re Fire Area of IPEEE Encl. Response Requested within 90 Days of Submittal Date ML20207A8541999-05-20020 May 1999 Forwards RAI Re Licensee Listed Responses to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves. Response Requested within 90 Days of Submittal Date ML20206L4661999-05-10010 May 1999 Forwards SE Accepting Request to Delay Submitting Plant, Unit 1 Class Piping ISI Program for Third Insp Interval Until 010430,to Permit Development of Risk Informed ISI Program for Class 1 Piping ML20206P6401999-05-0505 May 1999 Refers to Public Meeting Conducted at North Anna Power Station on 990413 to Discuss Results of North Anna Plant Performance Review.List of Attendees Encl ML20205S0321999-04-21021 April 1999 Forwards SER Accepting Util 980804 Requests for Relief from Certain Requirements of Subsections IWE & Iwl of 1992 Addenda of ASME Section Xi.Alternatives for IWE2,IWE4,IWE6 & IWL2,authorized Pursuant to 10CFR50.55a(a)(3)(ii) ML20205Q2451999-04-12012 April 1999 Forwards Insp Repts 50-338/99-01 & 50-339/99-01 on 990131- 0313.Three Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20205T1411999-04-0909 April 1999 Informs That on 990407,A Royal & Ho Christensen Confirmed Initial Operator Licensing Exam Scheduled for Y2K.Initial Exam Dates Scheduled for Wks of 000925 & 1002 for Approx 11 Candidates ML20196K9891999-03-29029 March 1999 Confirms Plans to Hold Meeting on 990413 at North Anna Nuclear Information Center to Discuss North Anna Plant Performance Review ML20205B5641999-03-24024 March 1999 Forwards Audit Rept of North Anna Power Station,Units 1 & 2 Conducted on 990126-28 in Glen Allen,Va.Audit Team Assessment of Y2K Project Plan Identified Plan as well-structured,well Organized & Well Implemented ML20196L0021999-03-24024 March 1999 Discusses Plant Performance Review of North Anna Power Station Completed by NRC on 990205.Found Overall Performance at North Anna to Be Acceptable.Several Examples of Inadequate or Untimely Problem Resolution Were Noted ML20207E1331999-03-0101 March 1999 Forwards Insp Repts 50-338/98-11 & 50-339/98-11 on 981220- 990130.No Violations Noted.Util Conduct of Activities at North Anna Power Station Generally Characterized by Safety Conscious Plant Operations & Good Maintenance ML20203F8681999-02-16016 February 1999 Forwards Request for Addl Info Re Util 970527 plant-specific Summary Rept in Response to USI A-46 Program at North Anna Power Station,Units 1 & 2 ML20196K3681999-01-21021 January 1999 Discusses Closure of Tasks Re Generic Implication of part- Length Control Rod Drive Mechanism Housing Leak at Prairie Island,Unit 2 & Anna Power Station,Units 1 & 2 ML20199K3221999-01-14014 January 1999 Forwards Insp Repts 50-338/98-10 & 50-339/98-10 on 981108- 1219.No Violations Identified.Conduct of Activities at North Anna Power Station Generally Characterized by safety-conscious Plant Operations ML20198S3921999-01-0606 January 1999 Forwards Request for Addl Info on Resolution of USI A-46 for North Anna Power Station,Units 1 & 2 ML20198H8951998-12-22022 December 1998 Forwards Corrected Authorizing Proposed Alternative for Remainder of Second 10-yr Insp Interval & Se.Authorization Ltr Erroneously Dtd as 981103 & End Dates of Second 10-yr Insp Intervals Incorrect ML20198P0401998-12-14014 December 1998 Refers to 981210 Open Meeting at Licensee Request at Region II Re Weld Discrepancies Identified on Various Auxiliary Feedwater Sys Pipe Supports During Safety Sys Engineering Insp.List of Attendees & Util Presentation Handouts Encl ML20196J5591998-12-0808 December 1998 Submits Correction to Transmittal Ltr ,which Forwarded SE Authorizing Licensee Relief Request Re Rev to NDE-32, Svc Water Sys Leaks, Per 10CFR50.55a(a)(3)(ii). Corrected Date Should Be 981203 ML20198A7491998-12-0404 December 1998 Confirms 981203 Telcon Between L Hart of Licensee Staff & V Mccree of NRC Re Meeting Scheduled for 981210 in Atlanta, Ga Concerning Pipe Support Potential Construction Errors or Drawing Errors ML20198H9341998-12-0303 December 1998 Forwards SE Authorizing Proposed Alternative for Remainder of Second 10-yr Insp Interval for Plant,Per Util 970224 Relief Request ML20196G9431998-12-0202 December 1998 Advises of Planned Insp Effort Resulting from Insp Planning Meeting,Completed on 981102.Details of Insp Plan for Next 4 Months Encl ML20196A6581998-11-25025 November 1998 Forwards Notice of Withdrawal of 960321 Application for Amends to Licenses NPF-4 & NPF-7 for Plant.Changes Would Have Clarified Requirements for Testing Charcoal Absorbent in Waste Gas Charcoal Filter Sys ML20196B0011998-11-23023 November 1998 Forwards Emergency Response Data Sys Implementation Documents,Which Include Data Point Library Updates for Listed Plants.Changes Should Be Made to Data Base as Soon as Possible.Without Encl ML20196H3951998-11-0505 November 1998 Forwards Insp Repts 50-338/98-05 & 50-339/98-05 on 980713- 17,27-31 & 0921-25 & Notice of Violation & Re Failure to Implement Adequate Corrective Actions to Resolve Corrosion of AFW Tunnel Pipe Supports Identified in Sept 1996 ML20196G1161998-11-0303 November 1998 Forwards Safety Evaluation Authorizing Rev to ISI Program Relief Reuest NDE-32 Re SWS Leaks,Submitted on 980224,for Remainder of Second 10-yr Insp Interval for Each Unit ML20155H8061998-10-29029 October 1998 Responds to Discussing NRC Initiatives & Efforts. Plans for Another Stakeholders Meeting Underway for 981113. Staff Will Continue to Solicit Feedback & Comments from Public on Initiatives ML20154Q8331998-10-21021 October 1998 Informs That Info Submitted in 980911 Application & Affidavit Re WCAP-15063-P, W In-Reactor Creep Model, Marked Proprietary,Will Be Withheld from Public Disclosure Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954 ML20154G3611998-10-0707 October 1998 Informs That Util 951018,960722 Responses to Anomalies Identified in SER Dtd 950924,acceptable & Subject to NRC Inspection.Request for Relief from Valve Quarterly Tests & Proposal to Extend Test Interval,Not Acceptable ML20155B0531998-10-0202 October 1998 Forwards Exam Repts 50-338/98-301 & 50-339/98-301 on 980817- 21 & 31-0903.Fourteen Candidates Passed & One Failed Exam ML20155B3741998-09-25025 September 1998 Cancels Meeting Which Was Scheduled for 981109.Purpose of Meeting Was to Discuss SALP for North Anna Power Station. Informs That NRC Has Suspended SALP Program Until Staff Completes Review of NPP Performance Assessment Process ML20239A3801998-09-0202 September 1998 Confirms 980819 Telephone Conversation Between D Summers & L Garner Re Meeting at NRC Request Which Has Been Scheduled for 981109.Purpose of Meeting Will Be to Discuss SALP for North Anna Power Station ML20151T9351998-08-27027 August 1998 Informs of Change Being Implemented by Region II Re Administrative Processing of Licensee Responses to Novs. Licensee NOV Responses Which Accept Violations & Require No Addl Communication to Be Ack in Cover Ltr of Next Insp Rept ML20237E0111998-08-25025 August 1998 Discusses Completion of Licensing Action for GL 97-05, Steam Generator Tube Insp Techniques, ML20151T5531998-08-18018 August 1998 Forwards Insp Repts 50-338/98-07 & 50-339/98-07 on 980720-23.No Violations Noted.Insp Observed Selected Portions of Emergency Organization Response in Key Facilities During EP Plume Exposure Exercise ML20237B0001998-07-30030 July 1998 Confirms 980728 Telcon Between D Sommers & R Haag Re Meeting Scheduled for 980810 in Atlanta,Ga to Discuss Recent Mgt Changes & Items of Interest ML20236M0291998-07-0808 July 1998 Forwards Request for Addl Info Re ASME Section XI Relief Requests NDE-37,through NDE-41 for North Anna Power Station, Unit 1 ML20236K5451998-07-0707 July 1998 Forwards SER Accepting Proposed Change in Commitment on Inservice Insp Program for Protection Against Dynamic Effects Associated W/Postulated Rupture of High Energy Main Steam & Feedwater Piping,In Mechanical Equipment Room ML20236F7311998-06-29029 June 1998 Forwards Request for Addl Info Related to Fire,Seismic & High Wind,Flood & Other External Events Areas of IPEEE Submittal IR 05000338/19980021998-06-25025 June 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-338/98-02, 50-339/98-02 & 72-0016/98-02 ML20236J9871998-06-24024 June 1998 First Final Response to FOIA Request for Documents.Documents Listed in App a Already Available in Pdr.Documents Listed in App B Being Released in Entirety ML20248M0381998-06-0909 June 1998 Forwards Request for Addl Info Re Revised Loop Stop Valve Operation.Changes Will Modify Requirements for Isolated Loop Startup to Permit Filling of Drained Isolated Loop Via Backfill from RCS Through Partially Opened Loop Stop Valves ML20248K9121998-06-0808 June 1998 Forwards Preliminary SER for North Anna Nuclear Power Station Isfsi,Per Util 950509 Submittal of Application for ISFSI ML20249A4741998-06-0505 June 1998 Advises of Planned Insp Effort Resulting from Plant Ppr. Historical Listing of Plant Issues & Details of NRC Insp Plan for Next 8 Months Encl 1999-09-08
[Table view] |
See also: IR 05000338/1988002
Text
.
. .
.
-
- -
-
O&th;{
.
.
"
'
.'
May 6, 1988
.
,
-
Docket Nos. 50-338, 50-339
License Nos.'NPF-4, NPF-7
Virginia Electric and Power Company
ATTN: Mr. D. S. Cruden, Vice President,
Nuclear Operations
P. O. Box 26666
Richmond, VA 23261
Gentlemen:
SUBJECT:
ENFORCEMENT CONFERENCE SUMMARY
NRC INSPEC1 ION REPORT NOS. 50-338/88-02 AND 50-339/88-02
This letter refers to the Enforcement Conference held at our request on March 28,
1988. This meeting concerned activities authorized for your North Anna facility.
The issues discussed at this conference related to the management controls
relating to inservice testing of Te ,nical Specification containment isolation
valves. A sumary, a list of attendees, and a copy of your handout are enclosed.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its" enclosures
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
M!NAL mcNb n
A % G4Act
J. Nelson Grace
Regional ~ Administrator
'
'
'
Enclosures:
1.
Enforcement Conference Summary
2.
List of Attendees
3.
Handout
cc w/encls:
G. Kane, Station Manager
N. E. Hardwick, Manager - Nuclear
Programs and Licensing
bec w/encls: (See page 2)
t
hD
DO
O
338
O
DCD
2 4 c)
'l
.
.
'
.
.
Virginia Electric and Power Company
2
flay 6,1988
bec w/encis:
NRC Resident Inspector
DRS Technical Assistant
Document Control Desk
Commonwealth of Virginia
\\
RII
RII
RII
RII
RII
RII
RII
MSh]a['h /[W
& ldh
6/A
1
OR
e
nnon:sh
(Juryt
RGibbt
ABelisle CAJ
AFGiby/88
on
FCantrell
04/g
04/jj /88
04/sc /88
04/ 7 /88 04/ 7 /88 04/ 7 /88 04/q/88
RII
Rll
RIl
RII
RII
RII
8lk)
ocdyK
f
&
M
\\%h {f
G7enkilns
8AWilson CHeh
LAReyes
MLErnst
JNGrace
04/Q/88 04/vV88
04/o /88 04
/88 Qf/3 /88 04/ /88 04/ /88
..
.
-
- ,
.
.
.
.
ENCLOSURE 1
ENFORCEMENT CONFERENCE SUMMARY
,
'
The Deputy Regional Administrator opened the meeting by stating that the
surpose of the meeting was to review issues related to North Anna and Surry.
Virginia Electric and Power Company (VEPCO) personnel and NRC personnel
introduced themselves.
The VEPC0 Senior Vice-President stated that the issue related to corrective
actions for inservice valve testing for Technical Specification containment
isolation values would be presented first.
The Assistant Plant Manager,
Operations and Maintenance, North Anna, started the presentation by stating
that VEPC0 did not dispute the inspection findings, that this situation was
considered serious, and that VEPC0 would perform adequate corrective action.
The subsequent discussions consisted of reviewing NRC Inspection Report
No. 50-338, 339/88-02, causes, actions initiated prior to the inspection,
corrective actions taken, corrective actions to be taken, safety significance,
quality assurance audits of the inservice inspection / testing programs, and
conclusions.
During the presents. tion, the Assistant Plant Manager, Operations and Maint! nance,
North Anna, stated that a root cause analysis of the valve failures had been
performed by a consultant; however, this analysis was not fully complete.
During the discussions, NRC and VEPC0 personnel presented sequence of events
summaries to clarify issues.
VEPC0 personnel discussed the valves' failure
analysis with the failures possibly being caused by a silicon residue found in
a valve internal.
VEPC0 personnel stated the valve vendor's position did not
,
appear to agree with the VEPC0 position.
When asked if the water intrusion
into the instrument air lines to the solenoid valves was the probable cause of
multiple valve failures, VEPC0 personnel stated that this may have been a
contributor; however, when one solenoid valve that had experienced repeated
failures was disassembled, no evidence of water corrosion was identified on its
internals. Discussions were conducted relative to ASME Section XI requirements,
"
corrective action adequacy, and stroke frequencies.
Discussions were also
conducted relative to the effect of the valves' exhaust port piping diameter size
on stroke times, since the valves with smaller exhaust port piping exhibited
longer stroke times.
Discussions were conducted relative to the effectiveness
of quality assurance (QA) audits and QA involvement in this area. The meeting
'
was then concluded by the Deputy Regional Administrator.
i
n
I
- .-
-. .
. - , - - _ . - . - _
.
- , - ,
'
.
.
-
.
,,
ENCLOSURE 2
,
4
LIST OF ATTENDEES
]
Virginia Electric and Power Company
I
W. L. Stewart, Senior Vice President
'
D. S. Cruden, Vice President, Nuclear Operations
.
-
G. E. Kane, Assistant Station Manager, Operations and Maintenance
,
M. L. Bowling, Assistant Station Manager (North Anna)
j
E. S. Greycheck, Assistant Station Manager (Surry)
G. L. Pannell, Director, SEC
R. S. Hardwick, Jr., Corporate Manager, Quality Assurance
N. E. Hardwick, Manager, Licensing
J. P. Haciejewski, Manager, ISI/NDE
R. F. Driscoll, Manager, Quality Assurance
!
H. V. Le, Plant Engineer
1
Nuclear Regulatory Conin..sion
,
M. L. Ernst, Deputy Regional Administrator
A. F. cibson, Director, Division of Reactor Safety (DRS)
C. W. Hehl, Deputy Director, Division of Reactor Projeccs (DRP)
B. A. Wilson, Chief, Branch 2, DRP.
j
C. A. Julian, Chief, Operations Branch, DRS
C. P. Patel, Project Manager, Office of Nuclear Reactor kapinlation (NRR)
L. B. Engle, Projects Manager, NRR
,
G. A. Belisle, Chief, Quality Assurance Programs Section, DRS
J. J. Blake, Chief, Materials and Processes Section, DRS
-
T. J. Sullivan, Chief, Mechanical Engineering Branch, NRR
J. L. Caldwell, Senior Resident Inspector, North Anna
4
L. E. Nicholson, Resident Inspector, Surry
R. D. Gibbs, Reactor Inspector
M. C. Shannon, Reactor Inspector
K. R. Jury, Reactor Inspector
E. H. Girard, Reactor Ir.ipector
-
L. M. Slack, Enforcement and Investigation Coordination Assistant
B. Uryc, Senior Enforcement Coordinator
i
,
i
l
\\
. - . .
-
-- -
- .
.:
-__
__
_
_
-
-
- - -
.-
e
.
-
.
ENCLOSURE 3
ENFORCEMENT CONFERENCE
ON
NORTH ANNA POWER STATION
INSERVICE TESTING PROGRAM
MARCH 28,1988
i
l
.
,my,
,_ ,, ,
,,.,%7v,..e,,,-gw...
,._myy
,
- , - _ - - - . - _ . - - _ _ . . , . - - - - - . . , _ -
. _ _ _ _ , , , , , ,
- , _ _
- - - - -
, - _ - - ,---- - __ _
d
9
0
REVIEW OF IR 88 02
-
CAUSES
-
4
CORRECTIVE ACTIONS
-
SAFETY SIGNIFICANCE
.
i
CONCLUSIONS
-
l
l
L -
.
.- ..
. .
. ~
.
- -
-
'
.
.
l
.
l
VIRGINIA POWER REVIEW OFIR 88 02 l
ASCO VALVES IDENTIFIED IN IR88 02
49
NO PERFORMANCE CONCERNS IDENTIFIED
2
j
REMOVED FROM IST PROGRAM
1
PERFORMANCE SAT BASED ON STROKE TIME < 2 SEC
2
PERFORMANCE SAT BASED ON ENGINEERING EVAL
17
PERFORMANCE SAT BASED ON CORRECTIVE ACTION
7
VALVES NOT TESTED MONTHLY BASED ON COLD
SHUTDOWN CODE INTERPRETATION
5
STROKING USED AS CORRECTIVE ACTION FOR
15
PREVIOUS VALVE FAILURES
a
u
-e.+
b
"
e
9
9
I
I
F
!
1
,
L
L
L
,
&
f
I
I
r
I
,
I,
I
P
h
>
I
>
>
>
I
f
f
I
>
e
h
>
f
)
l
5
,
e
,
b
I
.f
I
k
l
i
f
,
b
%
e
e
5a
I
w
- r
i
!
r
1
.,n.,.--..,,-,---
..,-- ,-,=. . . . . .- , - - , ,. - - . . , - - , . . . . ,
-
, , _ , , . - . .--,. . , - , - , - - - . - , - . , . , , .. . , - - , - -- .- --
'
.
-
.
.
.
ISI / IST PROGRAM
DIFFERENT INTERPRETATION OF ASME CODE FOR
-
CORRECTIVE ACTIONS
lST PROGRAM IMPLEMENTATION WEAKNESSES
-
ASCO VALVE PERFORMANCE
SERVICE WATER INTRUSION INTO INSTRUMENT LINES
-
MODIFICATIONS TO SOV VENT PORT FOR EQ ENHANCEMENTS
-
AFFECTED STROKE TIMES
- -
- -
-
. -
-
.
-
.
.
- .
.
.
- -
- _ - .
. _ ___ _
i
.
.
.
~
ACTIONS lNITIATED PRIOR TO INSPECTIO
REVIEW OF PAST STATION' DEVIATION REPORTS ON MOV
-
PROBLEMS TO ENSURE ADEQUATE CORRECTIVE ACTION
EVALVATION OF ASCO SOV FAILURES
-
DEVELOPMENT OF ADMINSTRATIVE VALVE STROKE
-
LIMITS TO DETECT DEGRADING VALVE PERFORMANCE
BLOWDOWN AND DRAINING OF INSTRUMENT AIR SYSTEMS
.
AFTER SERVICE WATER INTRUSION EVENT
UPGRADE OF STATION CORRECTIVE ACTION PROGRAM TO
.
ENHANCE ROOT CAUSE DETERMINATION AND PROVIDE
EARLY IDENTIFICATION OF ADVERSE TRENDS
QA AUDITS OF ISI/IST PROGRAM AS REQUIRED BY
.
10 CFR 50, APPENDIX B WERE ROUTINELY CONDUCTED OF
BOTH THE STATION AND CORPORATE ISI / IST GROUPS
<
- , . _ _ , - _ - - - - - _ _ . . _ . . . - _ _ - _ _ , - .
. - -
. .
.
. - _ . . - . , _ - .
_ . - - - - - .
-
-
-
_.
..
____
.
__ -
-
m
-
'
CORRECTIVE ACTIONS TAKEN l
ASCO SOVs
'
.
REVIEWED UNIT 1 AND UNIT 2 VALVE HISTORIES
PERFORMED ADDITIONAL VALVE STROKING PRIOR TO
RESTART OF UNIT 1 AND ON UNIT 2 WHILE AT POWER
DEVELOPED AND APPROVED A JCO FOR UNIT 2 VALVES
WHICH COULD NOT BE SAFELY STROKED AT POWER
SHUT DOWN UNIT 2 ON FEBRUARY 12,1988 FOR VALVE
TESTING AND CORRECTIVE ACTION
.
DISCRETIONARY ENFORCEMENT WAS GRANTED FOR ONE
UNIT 1 VALVE WHICH COULD NOT BE STROKED SAFELY
AT POWER
CORRECTIVE ACTION WAS TAKEN MARCH 18,1988
.
. INCREASED SURVEILLANCE FREQUENCY OF ASCO SOVs
IN IST PROGRAM TO 31 DAYS
,
I
- - - . _ . . . _ . _.. . - _ _ _ _
. . _ , _ . _ . .
.
. _ . . . . . _ _ . . _ . . . . . . _ _ , _ _ . .
, _ _ _ _ _ . _ _ , _ _ _ . _ . . . - - _ _ _ ~ _ . _ _ _ _
0
9
$
9
CORRECTIVE ACTIONS TAKEN l
,
ASCO SOVs (CONT'D)
REPLACED UNIT 2 SOV EXHAUST TUBING WITH PIPE
.
ELBOWS
REPLACED EXHAUST PORT LINES ON 3 UNIT 1 VALVES WITH
-
PIPE ELBOWS BASED ON EVALUATION OF STROKE TIMES.
INSPECTED FOUR MODEL 8321 (PISTON TYPE) AND SEVEN
.
MODEL 206 380 (LEVER TYPE) ASCO SOVs AND REVIEWED
'
WITH ASCO
PERFORMED LABORATORY ANALYSIS OF MODEL 206 380 SOV
.
,
.
1
I
-
.
.
.
.
- - .
. . .
. . - .
..
I
.
'
-
.
.
l
1
l
.
s
CORRECTIVE ACTIONS TAKEN l
lSI / IST PROGRAM
REVIEWED VALVE STROKE HISTORIES TO ENSURE VALVES
WERE IN ALERT,IF REQUIRED BY ASME CODE, AND TO
IDENTIFY ANY ADVERSE TREND
. REVIEWED VALVES AND PUMPS IN ALERT STATUS TO
'
ENSURE AUGMENTED SURVEILLANCES ARE BEING PERFORMED
. STRENGTHENED NOTIFICATION AND FOLLOWUP FOR
PUMPS AND VALVES IN ALERT
. ISSUED OPERATIONS DIRECTIVE TO CLARIFY THE
PROCESS FOR DOCUMENTING PERIODIC TESTS
,
. ISSUED MANAGEMENT AND OPERATIONS DIRECTIVES
TO CLARIFY POLICY ON VOIDING WORK ORDERS
I
i
. ASSIGNED ENGINEER TO MAINTENANCE FOR ROOT CAUSE
i
EVALUATION OF EQ FAILURES (INCLUDES IST PROGRAM VALVE
'
~
. UPGRADED ADMINISTRATIVE PROCEDURE FOR PUMP AND
VALVE IST PROGRAM
'
.
.
.
CORRECTIVE ACTIONS TO BE TAKEN l
ASCO SOVs
REPLACE REMAINING UNIT 1 EXHAUST PORT LINE ELBOWS
-
(NEXT COLD SHUTDOWN)
'
COMPLETE ROOT CAUSE EVALUATION OF ASCO SOV
.
FAILURES INCLUDING INSTRUMENT AIR PURITY AND NEED
FOR PERIODIC VALVE REPLACEMENT (DECEMBER,1988)
ISI / IST PROGRAM
NEW ORGANIZATIONAL EMPHASIS ON NDE / ISI FUNCTIONS
.
AT CORPORATE LEVEL (APRIL 1,1988)
.
CONDUCT AN INDEPENDENT TECHNICAL REVIEW OF THE
STATION ISI / IST PROGRAM AND IMPLEMENTATION (APRIL 30,1988)
.
. QUALITY ASSURANCE DEPARTMENT TO CONDUCT A
PERFORMANCE BASED SURVEILLANCE AUDIT OF THE IST
PROGRAM (APRIL 30,1988)
I
i
--
.
1
_
-.
__
.
.
.
.
,
.
CORRECTIVE ACTIONS TO BE TAKEN
ISI / IST PROGRAM (CONT'D)
COVER NEW PUMP AND VALVE IST PROGRAM IN
CONTINUING TRAINING (JULY 31,1988)
.
ENHANCE ISI PERIODIC TEST PROCEDURES (OCTOBER 31,1988)
UPGRADE STATION CORRECTIVE ACTION PROGRAM TO ENHANCE
ROOT CAUSE DETERMINATION AND PROVIDE EARLY
IDENTIFICATION OF ADVERSE TRENDS (DECEMBER,1988)
. OP 1-A CHECKLIST FOR UNIT STARTUP FROM COLD SHUTDOWN
TO BE REVISED TO REQUIRE ISI SIGNOFF (APRIL 30,1988)
l
t
.
.
.
. .
. . .
.
. . . - - -
..
,e
_ SAF5TY . SIGNIFICANCE l
JUSTIFICATION FOR CONTINUED OPERATION PROVIDED BY ONE
OR MORE OF THE FOLLOWING:
VALVES OPERABLE BY TECHNICAL SPECIFICATIONS STROKE
TIME REQUIREMENTS
. INITIATING EVENT FOR PREVIOUS FAILURES IDENTIFIED
CORRECTIVE ACTIONS (BLOWDOWN OF AIR LINES, SOV
REPLACEMENT, VALVE EXERCISING) WERE EFFECTIVE
REDUNDANT VALVES WERE OPERABLE
. POTENTIAL CONSEQUENCES ARE GREATLY REDUCED
,
BY EXPECTED OPERATOR AND SYSTEM ACTIONS
REVIEWED WITH NRC
.
t
.
_ _ _ - - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
.
-
-
QUAL lTY ASSURANCE AUDITS
-
OF ISI / IST PROGRAM
NAPS AUDIT N-85-18 - CORRECTIVE ACTION
- 2 FINDINGS
- POST MAINTENANCE TESTING OF COLD SHUTDOWN VALVES
rdairejaiinu'1
NAPS INSPECTION REPORT IR-N-85 772
- TESTING OF MAIN STEAM CODE SAFETY VALVES -> ;;;;d", Le~e
CORPORATE AUDIT N-86 79
INSERVICE INSPECTION
8 FINDINGS
- ISI MANUAL REVISION
NAPS AUDIT N 86-21 - INSERVICE INSPECTION
- 1 FINDING
5 AREAS NEEDING PROGRAMS, PROCEDURES, OR
PROGRAM SUMMARIES
NAPS ACTIVITY REPORT AR N 861647
- POST MAINTENANCE TESTING
NAPS AUDIT N 87 21
INSERVICE INSPECTION
- 1 FINDING
- UNIT 2 40 MONTH PLAN NOT IN STATION RECORDS
i
- , , - - - . , - - _ . - - - - _ . _ _ . - _ - - - - - -
,_.. -- - ..-_ ,___,. .. _.- , _ , . ,...-
, _ , . - _ , - ,
- , - _ _ - - . . . - - - . _ . - . . , , , , , . . _ , - . . , , -,
_,
.ll
..
-
.
.
QA AUDIT PROGRAM IS ADEQUATE
.
IST PROGRAM IS ADEQUATE
.
VALVE PROGRAM IS CURRENTLY IN COMPLIANCE WITH
i
-
l
ASME SECTION XI AND TECH SPECS
INCREASED EMPHASIS ON EFFECTIVE IMPLEMENTATION
.
.
IS BEING MADE
,
CORRECTIVE ACTIONS HAVE BEEN IDENTIFIED AND ARE
.
BEING IMPLEMENTED ON A PRIORITY BASIS
NONCOMPLIANCE WITH ASME CODE FOR AFFECTED ASCO
-
SOV TRIP VALVES HAD MINIMAL SAFETY SIGNIFICANCE
,
,
t