Text

. . _ _ . _ _ _ _ _ _ _ -_ _ __ _ _ __________ _

September 2,1988 4

Docket No. 50-267 Mr. R. O. Williams, Jr. ,

Vice President, Nuclear Operations i Public Service Company of Colorado i Post Office Box 840 Denver, Colorado 80201-0840 s

Dear Mr. Williams:

SUBJECT:

FIRE DOOR RATINGS FOR RECORD STORAGE FACILITY '

(TACNO.61578) 1 We have reviewed your letter dated August 18, 1988 concerning the ratings  :

for fire doors at the Fort St. Vrain Records Center. We concur that the l I

requirement for a 4-hour rating is not necessary and is potentially difficult j to implerent. Therefore, we accept your proposed comitment to a 3-hour fire f I

rating for the structure, doors, frames and hardware. However, this rating should not be comprcmised for other purposes, such as installation of security devices.

Sincerely, j

' Kenne/s/th L. Heitner, Project Manager I Project Directorate - IV t l Divisien of Reactor Projects - !!I, IV, V and Special Projects l t

cc: See nexc page [

I DISTRIBUTION l

lWTiW '; NRC PDR Local PDR PD4 Reading I

L. Rubenstein ' J. Calvo P. Noonan K. Heitner .

I OGC-Rockville E. Jordan B. Grimes C. PcCracken  !

l ACRS(10) PD4 Plant File 1

t l

I i

. l l

PD4/L PD4/FM '

f B I PNoon KHeitner:sr gJCalvo CycCracken j

%/S\lC8 \/3I/88 1

\ '{IV188 YIN 88  ?

1 l h[ '

k$k']jjCK50 880902 0 <

! F 05000267 (

i pdc _ _ _ _ _

September 2,1988 5 .

/ Docket No. 50-267 Mr. R. O. Williams, Jr. 4 Vice President, Nuclear Operations ,.

Public Service Company of Colorado Post Office Box 840 Cenver, Colorado 80201-0840

Dear Mr. Williams:

SUBJECT:

FIRE DOOR RATINGS FOR RECORD STORAGE FACILITY (TAC NO 61578)

We have reviewed your letter dated August 18, 1988 concerning the ratings for fire doors at the Fort St. Vrain Records Center. We concur that the requirement for a 4-hour rating is not necessary and is potentially difficult to implement. Therefore, we accept your proposed commitment to a 3-hour fire rating for the structure, doors, frames and hardware. However, this rating should not be compromised for other purposes, such as installation of security device:.

Sincerely, Kenne/s/th L. Heitner, Project Manager Project Directorate - IV Division of Reactor Projects - III, IV, Y and Special Projects cc: See next page DISTRIBU_ TION Docket File' NRC 3DR Local PDR PD4 Reading L. Rubenstein J. Calvo P. Noonan K. Heitner OGC-Rockville E. Jo.can B. Grimes C. McCracken ACRS(10) PD4 Plant File 3

PD4/P JH Na 'lTM PD4/L[

PNoor KHeitner:sr gJCalvo CP

% /31/88 s / 34 / 8 8 3 'f/p/88  ;/cCracken

/fsS8

'*. n ass

  • ** o,, UNITED STATES

[t NUCLEAR REGULATORY COMMISSION

- f. 7.  ; W ASHINGTON, D. C. 20655 g September 2,1988 e...*

Docket No. 50-267 Mr. R. O. Williams, Jr. <

Vice President, Nuclear Operations Public Service Company of Colorado Post Office Box 840 '

Denver, Colorado 80201-08aC Dear Mr. Williamse

SUBJECT:

FIRE DOOR RATINGS FOR RECORD STORAGE FACILITY (TACNO.61578)

We have reviewed your letter dated August 18, 1986 concerning the ratings for fire doors at the Fort St. Vrain Records Center. We concur that the requirement for a 4-hour rating is bot necessary and is potentially difficult to implerent. Therefore,weaccept,[ourproposedcommitmenttoa3-hourfire rating for the structure, doors, frames and hardware. However, this rating should not be corpromised for other purposes, such as installation of security devices.

Sincerely, M A_.9R Kenneth L. Heitner, Project Manager Project Directorate - IV Division of Reactor Projects - !!!,

IV, Y and Special Projects cc: See next page

Y Mr. R. O. Williams, Jr.

  • Public Service Company of Colorado Fort St. Vrain i

CC:

Mr. D. W. Warembourg, Manager Albert J. Hazle, Director Nuclear Engineering Division Radiation Control Division Public Service Company Department of Health of Colorado 4210 East lith Avenue P. O. Box 840 Denver, Colorado 80220 Denver, Colorado 80201-0840 ,

Mr. David Alberstein, 14/159A Mr. R. O. Williams, Jr., Acting Manager GA Technologies, Inc. Nuclear Production Division Post Office Box 85608 Public Service Company of Colorado San Diego, California 92138 16805 Weld County Road 19-1/2 Platteville Colorado 80651 Mr. H. L. Brey, Manager Nuclear Licensing and Fuel Division Mr. P. F. Tomlinson, Manager Public Service Company of Colorade Quality Assurance Division P. O. Box 840 Public Service Company of Colorado Denver, Colorado 80201-0840 16805 Weld County Road 19-1/2 Platteville Colorado 80651 Senior Resident inspector U.S. Nuclear Regulatory Comission '.. Fr. R. F. Walker P. O. Box 640 ',' Public Service Company of Colorado .

Platteville, Colorado 80651 Post Office Box 840 Denver, Colorado 80201-0840 kelley, Stansfield & 0'Donnell Public Service Company Building Comitment Control Program Room 900 Coordinator 550 15th Street Public Service Company of Colorado Denver, Colorado 80202 2420 W. 26th Ave. Suite 100-0 Denver, Colorado 80211 Regional Administrator, Region !Y U.S. Nuclear Regulatory Comission 611 Ryan Plaza Drive Suite 1000 Arlington, Texas 76011 Chairtran, Board of County Comissioners of Weld County, Colorado Greeley, Colorado 80631 Regional Representative Radiation Programs Environmental Protection Agency 1 Denver Place 999 18th Street, Suite 1300 Denver, Colorado 80202-2413