ML20154A078

From kanterella
Jump to navigation Jump to search
Amend 82 to License DPR-6,incorporating Requirement to Adhere to Plan for Big Rock Point Integrated Assessment & Terms for Implementing Changes to Plan Contents
ML20154A078
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 02/12/1986
From: Zwolinski J
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20154A073 List:
References
NUDOCS 8603030286
Download: ML20154A078 (4)


Text

.

  1. i

't; , UNITED STATES 8 o= NUCLEAR REGULATORY COMMISSION

E WASHINGTON, D. C. 20665

%,...../

CONSUMERS POWER COMPANY DOCKET NO. 50-155 BIG ROCK POINT PLANT AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 82 License No. DPR-6

1. The Nuclear Regulatory Comission (the Comission) has found that:

A. The application for amendment by Consumers Power Company ,

(the licensee) dated June 7, 1985 as revised September 3, 1985 and supplemented December 4, 1985 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C. There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public; and (ii) that such activities will be conducted in compli-ance with the Comission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

8603030286 860212 PDR ADOCK 05000155' P PDR

b

2. Accordingly, the license is amended by adding a new license condition, condition 7, to paragraph 2.C. of Facility Operating License No. DPR-6 to read as follows:

"(7). The ' Plan for tne Big Rock Point Integrated Assessment' (the Plan) submitted on June 7, 1985 as revised September 3, 1985 and supplemented December 4, 1985, is approve.d.

a. The Plaa shall be followed by the licensee from and after the effective date of this amendment.

1 b. Changes tn dates for completion of issues identified in Issue Group B of the Plan do not require a license anendment. Dates specified in Issue Group A shall be changed crly in accordance

! with applicable NRC procedures."

3. This license amendaent is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY CCMISSION

\ .

Jchn . Zwolinski, Director BWR Project Directorate #1 Division of BWR Licensing i

Attachment:

Changes to License No. DPR-6 i

Date of Issuance: February 12, 1986 l

a I

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ____ _ _ _ _ _ _ _ _ . _ . _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _______________._____J

l ATTACHMENT TO LICENSE AMENDMENT NO. 82 FACILITY OPERATING LICENSE NO. DPR-6 DOCKET NO. 50-155 For your convenience we are enclosing a revised copy of page 4a (renumbered page 5) of DPR-6_for the Big Rock Point Plant.

1 4

1 i

n l

l l

i 4

l 1

1 l l l l Renumbered per Amd. No. 65,2/17/84 i

f (6) a. The implementation date for the installation of the Big Rock Point recirculation pump trip is deferred until the NRC staff has reviewed those portions of the Big Rock Point Probabilistic Risk Assessment that relate to Anticipated Transients Without Amd. No. 38 Scram.

01-15-81 b. The licensee shall submit to the NRC by March 1, 1981, all portions of the Probabilistic Risk Assessment that relate to the efficacy of a recirculation pump trip at Big Rock Point.

c. Before retuneing the reactor to operation from the 1980 refueling outage, the licensee shall submit the Big Rock Point emergency procedures and training program that relate to the recognition and mitigation of an ATWS event.

(7) The " Plan for the Big Rock Point Integrated Assessment" (the Plan) submitted on June 7,1985 as revised September 3,1985 and

, supplemented December 4, 1985, is approved.

l l a. The Plan shall be followed by the licensee from and after the effective date of this amendment.

b. Changes to dates for completion of issues identified in Issue Group B of the Plan do not require a license amendment. Dates specified in Issue Group A shall be changed only in accordance l with applicable NRC procedures.

I i D. This amended license becomes effective as of the date of its issuance and shall expire at midnight, May 31, 2000 FOR THE NUCLEAR REGULATORY COMMISSION I

Original signed by Richard D. Silver l for i Dennis L. Ziemann, Chief l Operating Reactor Branch No. 2 Division of Licensing

Attachment:

Change No. 46 to the Technical Specifications

Date of Issuance: December 19, 1975 l

Amendment No. 82