Proposed Tech Specs to Reflect Mod to Diesel Generator Bldg Carbon Dioxide Fire Suppression Sys
ML20153H554
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 09/07/1988
From:
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20153H535 List:
References
NUDOCS 8809090234
Download: ML20153H554 (4)


Text

'

PBAPS LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.14.B.3 (Cont'd) b.

an operable flow path to each room and c.

sixteen heat detectors in each diesel room, except that one detector or both detectors in one zone in each room may be inoperable for a period not to exceed seven days.

4.

If the requirements of 3.14.B.1, 2, or 3 cannot be

met, a.

establish a continuous fire watch with back-up fire suppression equipment for the unprotected area (HPCI, Cable Spreading, Computer, Diesel Generator) within i hour b.

restore the system to an operable status within 14 days, or in lieu of any other report required by Specification 6.9.2, submit a Special Report to the Commission pursuant to Specification 6.9.3 within 31 days outlining the cause of the malfunction and the plans for restoring the system to an operable status.

Reactor startup and/or continued reactor operation is permissible.

-240h fj[0hbbK C

P

l I

I I

l l

+

i Detector Type /

Minimum Detectors l

Lccation Designatien (1)

Operable 1

I l

Core Spray Pump Rooms S133, 5134, S135. $136 4

Vac. Breaker Area-

$158, S159, S160 3

Room 160,161 RHR Rooms f

Room 156

$120, $121 2

i Rocm 157 S122, $123, S124 3

Room 158 S125, $126, $127 3

Room 159 S128, S129, $130 3

4 Torus Area S150, S151, $152, $153 7

S154 S155, S156, $157 M-G Set Lube 011 Rocm (Rm 162)

S161, $162, $163 4

S164, $165 i

Recire. Pump MG Set Rocm Sill, $112, S113 5

[

S114, $116, S117 j

Emerg. Switchgear Rooms S107, $108, S109 4

i S110 j

Battery Rooms Room 266 S147, S148 2

l Room 268 S145, S146 2

13KV Switchgear Area (116')

S75, S76, $77 3

i HPSW Pump Room

$391 1

j COMMON

{

Centrol Room

$21, S22, $23, S23 4

{

Control Recm offices

$137, $130. $139 6

i

$140, J141, $142 t

Cable Spreading Recm S4, S7, 59, $10 23

$47 through $67 j

(total: 25) l Ccmputer Rocm 55, S6 2

{

l olesel Generator Rooms H550A, B thru H557A, B (See 3.14.B.3.c) i and R796A. 3 thru H819A, 5 l

(16 in each room)

(

l O-G Bldg.-Cardox Room

$540, $541, $542 3

j j

-2400-l

s;Page 240ga74 - FDL PSAPS 3.14 BASES l The water and CO2 Fire Protection Systems provide fire suppression l

capabilities in those areas of the plant wnere orotection of plarit equipment is 4

deemed necessary.

r f

A.

Water Fire Protection SystCO i

Two fire pumps supply water to sprinklers, manual hose s',ations, and hyirants in or turroundirg the plant. One electrically driven pump is poaered from an emergency power bus; the other pump is diesel driven. The capacity of each pump is in excess of the system design load.

In the event that both fira, mp bect me Inoperable, LrneJ14te corrective l

measures are taken since this syf te is a major porthn of the fire suppression i

capability of the plant.

Re requirement fot a twenty four hour report to the Comission provides for prompt evalua: 1on of the acceptability of the corrective measures to provide adequate fire sunpression capability for the continued

.I protection of the plant, i

i B.

C09 Fire Protection Systems i

The CO2 Fire Protection Systems previod fire suppression capability for the i

Cable 5preadir.g Room, Computer Room, Control Room, HPC' Rooms, and the Diesel Generator Rooms.

The specified minimum cuantities of i.02 provide the

]

Capability to flood the Cable Spreading Rono and Computer Room simultaneously, a HPCI rocm, or a Diesel Generator Room with sufficient CO2 to meet 3

J concentration objectives.

In the event that portions of the C0; Fire Protection $ystem are inoparable.

I alternate backup fire fighting equipment is required to be marJe nailable in the j

af fected areas until the affected fire suppression equipment can be returned to

)

service.

f i

1 C.

Fire Dete: tion t

1 Operability of the fire detectors ensures that adequate warning is available for I

the P W Dt detection of fires.

This capability is required in order to detect l

and Ic. ate fires in their early stages, prompt detection of fires will reduce j

the potential for damage to plant equirent and is an integral element in the overall plant fire protection program.

Table 3.14.C.1 specifies the minimum 1

j reber of operable detectors in each room.

l There are sixteen heat detectors in each diesel generator rcom, two detector s I

]

located in close proximity to each other at each of eight locations (each j

constituting a "zone"). Actuation of both detectors in any zone will initiate i

Cardox cischarge in tne room and a trip signal to the diesel generator in the 1

room. Cne detector or bcth detec. ors in one zone of each diesel generator room I

fray be inoperatie for a period not to esteed seven days without co?pensatory

]

measures being taken.

1

-2409-i I

1 I

i l

CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing Application were served on the following by deposit in the Mnited States Mail, first class postage prepaid, on the 7th day of Septemter, 1988 i

William T. Russell, Regional Administrator U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 T. P. Johnson, Resident Inspector U.S. Nuclear Regulatory Commission Peach Bottom Atomic Power Station i

j P. O. Box 399 Delta, PA 17314 Mr. Thomas Gerusky, Director Bureau of Radiological Protection

^

Department of Environmental Resources P. O. Box 2063 Harrisburg, PA 17120 t

t I

l khl l

Eug e /J. Bradley j

Attorney for i

Philadelphia Electric Company 1

4 j

l' b