ML20153H448
| ML20153H448 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 09/02/1988 |
| From: | Greenman E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Gerster W ILLINOIS POWER CO. |
| References | |
| IEB-85-003, IEB-85-3, NUDOCS 8809090181 | |
| Download: ML20153H448 (2) | |
Text
,
UNITED STATES pM84 9[%,
I NUCLEAR REGULATORY COMMISSION f
- ; ; %(
REGION 111 j
,se nooseveu aoao g, m,g,f o u ~ u m ~., u, ~ o,,
.m.
SEP0 2 G53 Docket No. 50-461 Illinois Power Company ATTN: Mr. W. C. Gerstner Executive Vice President 500 Sor+h 27th Street Decatur, IL 62525 Gentlemen:
Your letters of May 15 and September 10, 1986, and March 2, 1987, pertaining to Clinton, contained your response to IEB 85-03, "Motor-Operated Valve Comon Mode Failures During Plant Transients Due to improper Switch Settings". The review of these responses led to the issuance of a request for additional infont.ation on March 25, 1988, and response by you on May 16, 1988.
Review of this additional information indicates that your selection of the applicable safety-related valves, the valves' maximum differential pressures and your program to assure valve operability requestad by action item e. of the bulletin is now acceptable.
The results of our inspections to verify proper implementation of this program and the review of the final response required by action item f. of the bulletin will be addressed in forthcoming inspection reports.
& k. k_=,. D Edward G. Greenman, Director Division of Reactor Projects See Atteched Distribution G809090181 GG0902
{DR ADOCK 05000461 ID" l[s PDC
Illinois Power Company 2
SEP 0 2 t988 Distribution cc:
D. P. Hall, Vice President R. D. Freeman, Manager, Nuclear Station Engineering Department
-DCD/DCB (RIDS)f" Licensing Fee Management Branch Resident Inspector, RIII Richard Hubbard J. W. McCaffrey, Chief, Public Utilities Division H. S. Taylor, Quality Assurance Division, Sargent & Lundy Engineers David Rusenblatt, Governor's Office of Consumer Services Sheldon Zabel, Esquire, Schiff, Hardin, & Waite L. Larson, Project Manager, General Electric Company Chairman of DeWitt County Illinois Department of Nuclear Safety D. Schopfer, Project Manager, Sargent & Lundy Engineers R. J. Kiessel, NRR J. A. Stevens, NRR i
,