ML20153G606

From kanterella
Jump to navigation Jump to search
Responds to NRC Re Violations Noted in Insp Rept 50-219/87-25.Corrective Action:All Armed Response Personnel Are & Will Continue to Be Scheduled for Weapons Requalification at Least Every 12 Months
ML20153G606
Person / Time
Site: Oyster Creek
Issue date: 08/10/1988
From: Manganaro F
GENERAL PUBLIC UTILITIES CORP.
To: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20153G603 List:
References
NUDOCS 8809080249
Download: ML20153G606 (3)


Text

-

GPU Nuclear Corporation NggIgf Post Office Box 388 Route 9 South Forked River, New Jersey 08731-o388 609 971 4000 Writer's Direct Dial Number:

August 10, 1988 Mr. Stewart D. Ebneter Division of Radiation Safety and Safeguards US Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406

Dear Mr. Ebneter:

Subject:

Oyster Creek Nuclear Generating Station Docket No. 50-219 Inspection No. 50-219/87-25 A letter from your office dated February 15, 1988, contained a notice of violation of the Security fraining and Qualification Plan at Oyster Creek and classified it as a Level V violation in accordance with 10 CFR 2, Appendix C.

The attachment to this letter provides GPU Nuclear's response to that violation.

Inspection 87-25 was conducted on August 24-28, 1987, and the report and citation were issued with your letter dated February 5,1988. However, your letter was never received by GPU Nuclear addressees at the Oyster Creek Nuclear Generating Station. On July 14, 1988 GPU Nuclear discovered the report and citation had been issued. GPU t1uclear then notified the NRC Resident Inspector of the reason for the delay and prepared the attached response.

If you have any questions regarding this matter, please contact Mr. Michael Heller, Oyster Creek Licensing Engineer, at (609)971-4680.

Very truly yours, M

F. F. Ma naro Vice Pr s/ dent and Director Admini t ation FFM:MH:tir (0268A/18) g incac)

Attachment cc: US Nuclear Regulatory Commission NRC Resident Inspector Q80-go Attention: Document Control Desk Oyster Creek Nuclear co$ Washington, DC 20555 Generating Station om Forked River, NJ 08731 to

$8 Mr. Alexander W. Dromerick 8C Project Manager o US Nuclear Regulatory Commission 8$ Division of Reactor Projects I/II C0 " Washington, DC 10555 GPU Nuclear Corporation is a subsidiary of the General Public Utiht.es Corpcration

F

.=

~.

RESPONSE TO NOTICE OF VIOLATION INSPECTION NO. 50-219/87-25 Notice of Violation:

As a result of the inspection conducted on August 24 through August 28, 1987, and in accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C, the following violation was identified:

Paragraph 4.3 of the Training and Qualification Plan states, in part, that weapons requalification will be completed at least every 12 months.

Contrary to the above, on August 26, 1987, during a review of weapons qualification records, it was determined that a period in excess of 12 months had elapsed between requalifications for individuals in five of twelve cases audited. Further, review of work schedules confirmed that those individuals had performed armed security duties after the 12 month period.

This is a Severity Level V violation. (Supplement III)

Response

GPU Nuclear concurs with the violation. Site protection officers assigned as armed response personnel were being scheduled to complete weapons requalification every 12 months + 3 months. As corrective action, all armed response personnel are and will continue to be scheduled for weapons requalification at least every 12 months, never to exceed a 12 month .

! period. Full compliance was achieved on August 31, 1987, i

i L

i f

f

- . - , - - - - - - - - , . , -,- .- . . . . - - - - - - . - .