Text
- - _______ _ _
.a l
MFE log # TXX-88653 File # 10118
=
=
WELECTRIC September 1, 1988 I.mT hS A U. S. Nucl(ar Regulatory Commission Attn: Document Control Desk Washington, D. C.
20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET N05. 50-445 AND 50-446 ENF0RCEMENT ACTION (EA) 86-09, APPENDIX B, ITEM 1.B.2 REF:
1)
TV Electric Letter TXX-4946 from W. G. Counsil to J. H. Taylor, o-'ed August 4, 1986.
2)
Electric Letter TXX-6439 from W. G. Counsil to the NRC dated i
6, 1987 3) lectric Letter TXX 6899 from W. G. Counsil to the NRC dated october 30, 1987 4)
TV Clectric Letter TXX-88150 from W. G. Counsil to the NRC dated January 29, 1988 Gentlemen:
l Reference (3) provided our revised response to EA 86-09, Appendix B. item 1.B.2.
In that response we stated that a review was being conducted to assure i
that any handwritten comments contained in safety related vendor dranings i,.
our active files were properly dispositioned.
In reference (4), we stated that this reviev would be completed no later than September 1.
983.
Dispositioning of the Deficiency Reports generated as a result of this review will extend beyond September 1, 1988. According y the date when full compliance will be achieved for EA 86 09, Append x B, item 1.B.2 is hereby 1
revised to be no later than December 30, 1988.
Very truly you 5, I,A) G Cour<.
W. G. Counsi,1 By:
D. R. Woodlan Harager, Docket Licensing B50/gj i
c - Mr. R. D. Martin, Region lY t
Resident Inspectors, CPSES (3) l,)