ML20153F390
| ML20153F390 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 08/29/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Robert Williams PUBLIC SERVICE CO. OF COLORADO |
| Shared Package | |
| ML20153F394 | List: |
| References | |
| NUDOCS 8809070265 | |
| Download: ML20153F390 (2) | |
See also: IR 05000267/1988016
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ .
(
,'
-
1
.,
..
,
a
ME 29 gm
In Reply Refer To:
Docket: 50-267/88-16
Public Service Company of Colorado
ATTN:
Robert O. Williams, Jr.
Vice President, Nuclear Operations
2420 West 26th Avenue, Suite 15c
Denver, Colorado
80211
,
Gentlemen:
This refers to the inspection conducted by Messrs R. E. Farrell and
P. W. Michsud of this office during the period July 1-31, 1988, of activities
authorized by NRC Operating License DPR-34 for the Fort St. Vrain NuclearN
Generating Station, and to the discussion of our findings with you and other
'
members of your staff at the conclusion of the inspection.
Areas toamined during the inspection included operational safety verification,
.
licenser. event report review, monthly maintenance observation, monthly
i
surveillance observation, radiological protection, and monthly security
observation. Within these areas, the inspection consisted of selective
examination of procedures and representative records, interviews with
personnel, and observations by the inspectors. The inspection findings are
Jocumented in the enclosed inspection report.
Within the scepe of the inspection, no violations or deviations were
i
identified.
Should yea have any questions concerning this inspection, we will be [.~ eased to
discuss them with you.
Sincerely.
l
'
Ori;inal Signed By:
,
C,J CALLAN
L. J. Callan, Director
!
Division of Reactor Projects
i
Enclosure.s:
.
Appendix - NRC Inspection Report
50-267/88-16
l
cc w/ enclosures.
(seenextpage)
j
lb
l
k
PS/B
0:
Og\\M
f
RI
w
RIV:S
REfar il/nc
PL c aud
R Mullikin
TFWesterman
LJCalla6
lg
,
.
Q ,/88
{ /y88
/u/88
3 /W88
6 d /88
'
r=mL
6
'
PNV
I
Q
i
_ - _ . . . .
. - _ _ _ _ , , , _ - , , - _ _ _ - _ _ _ _ , _ _ _ _ _ - - - - - - _ - . _ _ .
.
_. . . _ . .
.
.
e
v
.
.
.
Public Service Company of Colorado
-2-
cc w/ enclosures:
C. Fuller, Manager
Nuclear Production Division
Fort St. Vrain Nuclear Generating Station
16805 WCR 19 1/2
Platteville, Colorado 80651
P. Tomlinson, Manager
Quality Assurance Division
Fort St. Vrain Nuclear Generating Station
16805 WCR 19 1/2
Platteville, Colorado 80651
Colorado Radiation Control Program Director
Colorado Public Utilities Commission
bec ts DMB (IE01)
bec distrib. by RIV:
l
l
- DRP
R. D. Martin, RA
!
- RRI
Lisa Shea, RM/ALF
l
- Section Chief (DRP/B)
- RIV File
- RPSB-DRSS
- TSS
- RSTS OPERATOR
- MIS System
- Project Engineer, DRP/B
- DRS
- K. Heitner, NRR Project Manager
- w/766
L