ML20153D604
| ML20153D604 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 09/18/1998 |
| From: | Grant G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Wadley M NORTHERN STATES POWER CO. |
| Shared Package | |
| ML20153D608 | List: |
| References | |
| 50-263-98-12, NUDOCS 9809250114 | |
| Download: ML20153D604 (2) | |
See also: IR 05000263/1998012
Text
. _ _ _ _ _ _ _ _ . _ _ . __. _ . . _ _ _ . _ _ _
_ .
. _ ._ _
._.____._ _ _ _
..-
September 18, 1998
-
..
l
Mr. M. Wadley
President, Nuclear Generation
Northern States Power Company
414 Nicollet Mall
Minneapolis, MN 55401
SUBJECT:
MONTICELLO INSPECTION REPORT 50-263/98012(DRP)
Dear Mr. Wadley:
!
On August 31,1998, the NRC completed an inspection at the Monticello reactor facility. The
enclosed report presents the results of that inspection.
During the 6-week period covered by this inspection, the conduct of activities at the Monticello
L
facility was generally characterized by safety-conscious operations, sound engineering and
maintenance practices, and careful radiological work controls. Planned power reductions, a
reactor shutdown, and a reactor startup were conducted in a controlled and deliberate manner.
(
'
j
No significant issues were identified.
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
enclosure will be placed in the NRC Public Document Room.
.
i
'
L
Sincerely,
Original signed by
'
M. Dapas for
Geoffrey E. Grant, Director
i
Division of Reactor Projects
Docket No.: 50-263
License No.: DPR-22
'
Enclosure:
. Inspection Report 50-263/98012(DRP)
cc w/ encl:
Plant Manager, Monticello
State Liaison Officer, State
of Minnesota
l
l
DOCUMENT NAME: G:\\mont\\ mon 98012.drp
j.
. To receive a copy of this document, indicate in the box "C" = Copy w/o attach /enci "E" =
l
Copy w/ attach /enci"N" = No copy
OFFICE
Rill
6
Rill
M
l
l
.
l
NAME
Kunowski/nA E Grant B/M) hr
!
DATE
09/11/98
09// 7 /98
'
l
OFFICIAL RECORD COPY
1
"
9809250114 980918
ADOCK 05000263
G
,
l
.
_ _ - .
-
--.
.
-
, _ -
. . .
.. . . _
_ .
_
. . . _ . . _ _ _ _
_ _ . . _ . _ . . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ . _ . . -
'
_.
. ,'
.
I
Mr. M. Wadley
-2-
j
'
l
Distribution:
1
t
' CAC (E-Mail) .
'
Project Mgr., NRR w/enci
J. Caldwell, Rill w/enci
C. Pederson, Rlli w/enci -
,
B. Clayton, Rlil w/enct
SRI Monticello w/enci
DRP w/enci
TSS w/ encl
DRS (2) w/enci
-
)
Rill PRR w/ encl
i
. PUBLIC IE-01 w/enci '
l
Docket File w/enci
- -
. GREENS
i
'
IEO (E-Mail)
DOCDESK (E-Mail)
l
l
l
l
L
i
!-
L.
I
f
..
\\
L
I
!
-.25000:
,
w
--- ,
--1
se
-wr