Proposed Tech Spec Change Request 34,revising Surveillance Frequencies for Alternate Shutdown Instruments & Changing Channel Check to Instrument Check
ML20153D246
Person / Time
Site: Cooper Entergy icon.png
Issue date: 08/26/1988
From:
NEBRASKA PUBLIC POWER DISTRICT
To:
Shared Package
ML20153D242 List:
References
NUDOCS 8809020126
Download: ML20153D246 (2)


Text

- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

e LIMITING CONDITION FOR OPERATION SURVEILI.ANCE REQUIREMENTS

. E. Drywell I.eak Detection E. Dryvell I.eak Detection The limiting conditions of Instrumentation shall be calibrated operation for the instrumentation and checked as indicated in Table that monitors drywell leak 4.2.E.

detection are given in Table 3.2.E.

F. Primary Containment Surveillance F. Primary Containment Surveillance Information Information The limiting conditions of Instrumentation shall be calibrated operation for the instrumentation and checked at indicated in Table 4.2.F.

that provides surveillance information readouts are given in Table 3.2.F.

G. Recirculation Pump Trip G. Recirculation Pump Trip The limiting conditions for Instrumentation shall be functionally operation for the instrumentation tested and calibrated as indicated on that trips the recirculation Table 4.2.G.

pumps as a means of limiting the consequences of a failure to scram during an anticipated transient are given in Table 3.2.G.

H. Post-Accident Monitoring H. Post-Accident Monitoring The limiting conditions for oper- Instrumentation shall be functionally ation for the instrumentation that tested and calibrated as indicated monitors post-accident conditions on Table 4.2.H.

are given in Table 3.2.H.

I. Alternate Shutdown Capability I. Alternate Shutdown Capability

1. The alternate shutdown instruments 1. Each monitoring instrumentation listed in Table 3.2.I-1 and controls channel of Table 3.2.I-l shall be listed in Table 3.2.I-2 shall be demonstrated operable by performing operable during reactor power operations the Instrument Check and Channel and when the reactor coolant temperature Calibration at the frequencies shown is above 212'F. on Table 4.2.I.
2. With less than the minimum equipment 2. Each isolation switch, power supply, specified in Table 3.2.I-1 and and control circuit for the 3.2.I-2 operable, restore the components listed in Table 3.2.I-2 inoperable equipment to operable status shall be demonstrated operable at within 30 days, or notify the NRC and least once per cycle by operating provide plans to restore alternate each actuated component from the shutdown capability. Alternate Shutdown Panels.

p 40 BB[

f

  • ' ' ~ ~

Table 4.2.I Alternate Shutdown Instrumentation Surveillance Frequencies Instrument Channel Instrument Check Calibration HPCI Turbine Steam Inlet Pressure (Reactor Pressure) Note 1 Note 1 EPCI Pump Discharge Flow Note 1 Note 1 Reactor Water Level (fuel zone) once/ month once/ cycle Reactor Shroud Level once/ month once / cycle Suppression Chamber Level once/ month once/ cycle Emergency Condensate Storage Tank Level once/ month once/ cycle RHR System Loop B Flow Note 1 Note 1 Torus Teaperature once/ month once/ cycle Note 1 - This instrument will be checked and calibrated at the same time as the control room instrument r, hat shares the same sensor.