Forwards FaAA-PA-R-85-10-03, Torsiograph Test of Emergency Diesel Generator EDG 1A at Shearon Harris Nuclear Power Plant, Per Request for Test Results.Conclusions Listed. Status of Tdi Program Also Encl
ML20153C040
Person / Time
Site: Harris 
Issue date: 02/11/1986
From: Cutter A
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML18019A579 List:
References
NLS-85-464, NUDOCS 8602180240
Download: ML20153C040 (3)


Text

t' Cp&L Carolina Power & Light Company SERIAL: NLS-85-464 FEB 11.1986 WD-

_PWH - A/BC's TECH SUPPORT Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation AD - J* KNIGHT (ltr only)

United States Nuclear Regulatory Commission EB (BALLARD)

Washington, DC 20555 EICSB (HOSA)

PSB (CAMMILL)

PSB (BEHLINGER)

- SHEARON HARRIS NUCLEAR POWER PLANT F0B (BENAROYA)

UNIT NO.1 DOCKET NO. 50-400

/~~ ~ _~

EMERGENCY DIESEL GENERATORS

~~

Dear Mr. Denton:

At a recent meeting of the Transamerica DeLaval Incorporated (TDI) Owners' Group, Carolina Power & Light Company (CP&L) was requested, by Mr. C. Berlinger of your staff, to submit the results of a torsiograph test performed on the Shearon Harris l A diesel generator. A copy of the test report is enclosed in Attachment A and the conclusions of this test are as follows:

The first natural fregwency of the torsional system is approximately 28.8 Hz, and is in good agreement wiih Delaval Holzer calculations.

The stresses are below DEMA's allowables for both single order and combined responses at full load and 110% load, w

The engine was operating in an adequately balanced manner.

The results are consistent with those presented in the Phase I crankshaf t report and

' the DR/QR report for Shearon Harris.

In addition to the test report, CP&L would like to take this opportunity to provide your staff with an update on the current status of the Shearon Harris TDI program since our last submittal of May 13,1985. This update is provided as a brief report in Attachment B.

As recommended by NRC, the TDI Owners' Group has recently initiated a program to review the maintenance and surveillance recommendations contained within the DR/QR

(

report. Significant changes made to the SHNPP maintenance and surveillance program as a result of the OG's~ review will be documented as described in our letter of May 13, i

1985.:-

9602180240 860211

-I i

PDR ADOCK 05000400

=

~ -

so3\\

411 Fayetteville Street

  • P. O. Box 1551
  • Raleigh. N. C. 27602

. w ~.n 8-w..+

w. san

Mr. Huold R.' Denton FEB 111986 h

. NLS-85-464/Page 2 Carolina Power &' Light Company considers this generic safety issue, as it applies to the

- Shearon Harris TDI diesels, resolved. We request that the NRC provide written concurrence with our assessment by March 31,1936. In the meantime should you have

-any questions concerning this letter, please contact Mr. P. P. Carier at (919) 836-8165.

Yours - y truly, lh[s A. B. Cutt

- Vice Presi en Nuclear Engineering & Licensing ABC/PPC/ljs (3176PPC)

=-

Attachments cc:

Mr. B. C. Buckley (NRC)

Mr. Wells Eddleman

- Mr. G. F. Maxwell (NRC-SHNPP)

Mr. John D. Runkle ~

' Dr. J. Nelson Crace (NRC-RII)

Dr. Richard D. Wilson Mr. Travis Payne (KUDZU) ~

Mr. G. O. Bright (ASLB)

Mr. Daniel F. Read _(CHANGE /ELP)

Dr. J. H. Carpenter (ASLB)

Wake County Public Library Mr. J. L. Kelley (ASLB)

Mr. H. A. Cole t

9

r~~~~~

\\'.

Attachment A to NLS-85-464 Torsiograph Test of Emergency Diesel Generator EDG 1 A Report FaAA-PA-R-85-10-03, October l985 (57 pages including appendix)

Shearon Harris Nuclear Power Plant Unit 1 - Docket 50-400 (3176PPC/ljs)