Forwards Insp Repts 50-277/88-04 & 50-278/88-04 on 880201-11.No Violations Noted
ML20153B868
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 05/02/1988
From: Johnston W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Kemper J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20153B872 List:
References
REF-GTECI-A-07, REF-GTECI-CO NUDOCS 8805060100
Download: ML20153B868 (2)


See also: IR 05000277/1988004

Text

.

.

..

.

_

.

.

.

~

.

.-

. .

. .: ..

.

f[

r

i

,

MAY 0 2 1988 '

Docket-Nos. '50-277

50-278

1

Philadelphia Electric Company

ATTN: Mr. J. S. Kemper, Sr.

!

.

Vice President

Nuclear

2301 Market Street

!

Philadelphia, Pennsylvania 19101

i

,

Gentlemen:

[

i

Subject:

INSPECTION NOS. 50-277/88-04, AND 50-278/88-04

j

This letter refers to the special inspection conducted by Mr. S. K. Chaudhary,

!

of this office on February 1-11, 1988 at the Peach Bottom Atomic Power Station,

L

4

Units 2 and 3 at Delta, Pennsylvania, and the corporate engineering offices in

4

Philadelphia, Pennsylvania. Mr. Chaudhary discussed the findings of the

'

inspection with Mr. H. W. Vollmer of your staff at the conclusion of the

r

inspection.

L

i -

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas, the

!

inspection consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

L

^

t

Within the scope of this inspection, no violations were observed.

,

'

No reply to this letter is required. Your cooperation with us in this matter

.

is appreciated.

l

Sincerely,

!

Orie;inni Signed B71

P. K. TOPOD

,

F

William V. Johnston, Acting Director

Division of reactor Safety

Enclosure: NRC Region I Combined Inspection Report

i

Numbers 50-277/88-04, and 50-278/88-04

!

l

i

'

I

h

.

'

I

f

'

0FFICIAL RECORD COPY

CIR P8 88-04 - 0001.0.0

04/28/88

!

l

l

.

'

8805060100 830502

l

ADOCK0500{}7

DR

6

-

.

A

A,.

t

~

4

..

-.

,

,

Philadelphia Electric

2

l

Company

j

cc w/ enc 1:

J. W. Gallagher, Vice President, Nuclear Services

!

.

E. C. Kistner, Chairman, Nuclear Review Board

[

Dickinson M. Smith, Vice President, Peach Bottom Atomic Power Station

i

Jack Urban, General Manager, Fuels Department, Delmarva Power.& Light Co.

'

John F. Franz, Plant Manager, Peach Bottom Atomic Power Station

Troy B. Conner, Jr., Esquire

l

W. H. Hirst, Director, Joint Generation Projects Department,

Atlantic Electric

Bryan W. Gorman, Manager, External Affairs

Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)

r

Raymond L. Hovis, Esquire

7

Thomas Magette, Power Plant Siting, Nuclear Evaluations

'

W. M. Alden, Director, Licensing Section

,

l

Doris Poulsen, Secretary of Harford County Council

}

l

Public Document Room (PDR)

,

1

Local Public Document Room (LPDR)

i

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

,

Commonwealth of Pennsylvania

'

,

bec w/ encl:

!

Region I Docket Room (with concurrences)

i

Management Assistant, DRMA (w/o enc 1) Section Chief, DRP

l

Robert J. Bores, DRSS

i

.

G. Bagchi, NRR

T. Marsh, NRR

4

C.Y. Cheng, NRR

!

!

f

,

!

'

!

i

!

a

i

1

!

i

i

l

.,

,

!

!

_

?

i

i RI:DRS

/

RI:0RS

c RIWRS

rChaudhary/mk/ki/r# Strosnider

pohnston

'

4/26/88

4/29/88

4/26788

.i

1

0FFICIAL RECORD COPY

CIR PB 88-04 - 0002.0.0

04/25/88

j

-

.

1

3

i

.

'

.

.

!

)

t