ML20153B691

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-425/88-19 on 880511-22,0606-10 & 0711-14 & Notice of Violation
ML20153B691
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 08/18/1988
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
Shared Package
ML20153B695 List:
References
NUDOCS 8808310052
Download: ML20153B691 (2)


See also: IR 05000425/1988019

Text

x

u-

--

1

s

,.

a

-

j.

y

.

.

,

l

AUG 18 808

- :

Docket No. 50-425

License No. CPPR-109

Georgia Power Com)any

-

ATIN: Mr. W. G.

iairston III

'

SeniorVice-President

)

Nuclear Operations

i

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION

j

(NRCINSPECTIONREPORTNO. 50-425/88-19)

,

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted

by S. J. Vias on May 11-12 June 6-10, and July 11-14, 1988.

The inspection-

included a review of activities authorized for your Vogtle facility.

At the

3

conclusion of the inspection, the findings were discussed with those members

'

!

of your staff identified in the enclosed inspection report.

!

-

4

.

Areas examined during the inspection are identified in the report.

Within

!

4

these areas, the inspection consisted of selective examinations of procedures

!

and representative records, _ interviews with personnel, and observation of

l

activities in progress.

,

!

The inspection findings indicate that certain activities appeared to violate

3

~

NRC requirements.

The violation

references to pertinent requirements, and

elements to be included in your r,esponse are described in the enclosed Notice

.

,

of Violation.

'

!

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

i

Title 10, Code of Federal Regulations, a copy of this letter and its enclosures

will be placed in the NRC Pucife Document Room.

,

,

,

The responses directed by this letter and its enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

t

,

Paperwork Reduction Act of 1980, Pub. L. No.96-511.

l

l

.

!

!,

DO$khf

8

Pbh

gg

$# $

1

,.

.

-

.

.

Georgia Power Company

2

AUG 18 FM

Should you have any questions concerning this letter, please contact us.

Sincerely,

ODlG!NAL O!G'd? BY

VlilCil L. E'ROWNLEE

Virgil L. Brownlee, Chief

ReactorProjectsBranch3

DivisionofReactorProjects

Enclosures:

1.

Notice of Violation

2.

NRC Inspection Report

cc w/encis:

R. P. Mcdonald, Executive Vice

President, Nuclear Operations

P. D. Rice, Vice President, Project

Director

C. W. Hayes, Vogtle Quality

Assurance Mana

G. Bockhold, Jr.ger, General Manager,

Nuclear Operations

J. P. Kane, Manager, Nuclear Licensing

and Engineering

J. A. Balley, Project Licensing

,

Manager

8. W. Churchill, Esc. , Shaw

Pittman, Potts anc Trowbridge

D. Kirkland, Ill, Counsel,

Office of the Consumer's Utility

-

Council

i

D. Feig, Georgians Against

Nuclear Energy

bec w/encis:

E. Reis, OGC

J. Hopkins, NRR

M. Sinkule, RIl

i

!

DRS, Technical Assistant

l

NRC Resident Inspector

Document Control Desk

t

l

State of Georgia

Rll

Rll

Rll

5hU

% ^.

pyy$

SJVias

CPatterson

MSinkule

8/R/88

8/n/88

8/;c//88

i

'

_ __

_