UNITED STATES OF AMERICA o
NUCLEAR REGULATORY COMMISSION i
Title:
BRIEFING BY REACTOR VENDORS OV> ? TERS GROUPS -
PUBLIC MEETING Location:
Rockville, Maryland Date:
Tuesday, September 15,1998 4
/
Pages:
1 -- 9 7 4
o 3, p,d '4 ANN RILEY & ASSOCIATES, LTD.
1925 Connecticut Avenue,NW. Suite 1914 4
4 Washington, D.C.20036 hTb'
,fDE mm-p PT9.7 PDR
O DISCLAIMER This is an unofficial transcript of a meeting of the United States Nuclear Regulatory Commission held on September 15, 1998, in the Commission's office at One White Flint North, Rcakville, Maryland.
The meeting was open to public attendance and observation.
This transcript has not been reviewed, corrected or edited, and it may contain inaccuracies.
The transcript is intended solely for general informational purposes.
As provided by 10 CFR 9.103, it is not part of the formal or informal record of decision of the matters discussed.
Expressions of opinion in this transcript do not necessarily reflect final determination or l
beliefs..
No pleading or other paper may be filed with the Commission in any proceeding as the result of, or addressed to, any statement or argument contained herein, except as the Commission may authorize.
l l
l
G 1
1 UNITED STATES OF AMERICA 2
NUCLEAR REGULATORY COMMISSION 3
4 BRIEFING BY REACTOR VENDORS OWNERS GROUPS 5
6 PUBLIC MEETING 7
8 9
10 Nuclear Regulatory Commission 11 11555 Rockville Pike 12 Rockville, Maryland 13 14 Tuesday, September 15, 1998 15 16 17 The' Commission met in open session, pursuant to 18 notice, at 2:04 p.m.,
the Honorable SHIRLEY A. JACKSON, i
19 Chairman of the Commission, presiding.
20 21 COMMISSIONERS PRESENT:
22 SHIRLEY A. JACKSON, Chairman 23 EDWARD McGAFFIGAN, JR., Commissioner 24 NILS J. DIAZ, Commissioner 25 ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
_ _. _ _ _. _ =..
r i
2 l
1 STAFF AND PRESENTERS' SEATED AT THE COMMISSION TABLE:
i 2
JOHN C. HOYLE, Secretary 3
LAWRENCE CHANDLER, Deputy General Counsel
}
4 BILL FOSTER, Babcock and Wilcox 5
Owners Group I
6 THOMAS J. RAUSCH, Boiling Water Reactor 7
Owners Group l
.8 DAVID PILMER, Combustion Engineering i
I 9
Owners Group l
10 LOUIS F. LIBERATORI, JR., Westinghouse Owners
[
11 Group 12 L. JOSEPH CALLAN, NRC i
13 BRIAN SHERON, NRC 14 15 16-1 17 18 19 20 21 i
22 23 24 25 ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
3 1
PPOCEEDINGS 2
[2:04 p.m.)
3 CRAIRMAN JACKSUN:
Good afternoon.
4 I am pleased to welcome members of the NRC staff 5
and the Nuclear Steam System Supply Owners Groups to brief l
6 the Commission on, first, the purpose and organization of 7
the owners groups; secondly, the structure of interactions 8
between the owners groups and the NRC staff; and third, the 9
recent activities of the owners groups.
10 As part of the strategic assessment and 11 re-baselining initiated by the Commission in 1995, direction 12 setting and issues were identified that affect the basic l
l 13 nature of NRC activities and the means by which this work is 14 accomplished.
i 15 The interaction between the NRC and owners groups 16 are encompassed within what we call DSI-13, the role of 17 industry.
)
18 As such, the Comtnission is supportive of and 19 encourages interactions with the owners groups that can 20 enhance the efficiency and effectiveness of the agency and 21 licensees in our regulatory process in resolving safety 22 issues and in ensuring public health and safety, and the 23 Commission is interested in hearing today how these 24 interactions are working, and I ask.that we discuss not only 25 accomplishments but also failures or points of stress from JJRJ RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034
1 k
4 1
both the staff and the industry perspectives so that the 1
2
.Jommission can guide further improvements,.if necessary, and I
3 I understand that copies of the presentation material are 4
available at the entrances to the room, and so, unless my 5.
colleagues have any opening comments they wish to make, Mr.
6 Callan, please proceed.
7 MR. CALLAN:
Thank you, Chairman.
I 8
Good afternoon, Commissioners.
i 9-With me at the table from the NRC staff is Dr.
10 Brian Sheron.
He's the Acting Associate Director for j
11 Technical Review in-the Office of Nuclear Reactor 12 Regulation.
12 Before Brian begins his presentation, I'm going to 14 ask him to also introduce the members from the owners 15 groups.
16 Brian?
r
-17 MR. SHERON:
Okay.
Thank you.
18 With me is Lou Liberatori,from the Westinghouse 19 owners, Dave Pilmer from the Combustion owners group, Tom I
i 20 Rausch from the BWR owners group, and Bill Foster from the 21
. Babcock and Wilcox owners group.
t 22 If I could have the first slide, please.
l 23 The reason that we thought it would be a good idea l
24 to brief the Commission on our interactions with the owners 25 group is because they are, I think, very valuable and have i
ANN RILEY & ASSOCIATES, LTD.
Court Reporters l
1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034 I
i t
5 1
been very extensive recently, and I also think that, as I'll 2
get to in a moment with the next couple of slides, as you 3
said, with DSI-13, our interactions with the industry, I-4 think that the owners groups are playing even an 5
increasingly important role.
6 The owners groups, if I recall correctly, actually 7
came into existence, I believe, right around TMI as a way to 8
address a lot of the technical issues that arose from TMI, 9
and we have had interactions with the owners groups ever 10 since then.
11 They have proven, I think, to be a valuable 12 resource not only to the NRC but also to the utilities 13 themselves as a way to conserve resources and to address 14 common problems.
15 They also contribute -- I'm not going to read all 16 the slides here, but on operational experience and basically in addressing' technical problems that come up, and they do 17 18 directly interface with the NRC.
19 Next slide, please?
20 CHAIRMAN JACKSON:
Can you describe the duties and 21 actions of the regulatory response group?
s 22 MR. SHERON:
Basically, the regulatory response 23 groups are to provide a response to the NRC when important 24 safety issues arise where we need a very quick response from 25 the utilities on addressing specific issues.
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034
_ _. -. - -. - ~ _ _ ~ _ _ -. -.
6 1
CHAIRMAN JACKSON:
And it's always worked that j
2 way, that they have been quickly responsive?
l l
3 MR. SHERON:
For the most part, yes.
We did a j
there really hasn't been that j
4 little survey to find out 5
many times in the past -.in recent times when we've 6
activated them.
7 What I found is Westioghouse -- recently we called 8
them on the part-length control rod issue.
i 9
Babcock and Wilcox was activated naice, one on 10 seismic concerns for fuel assemblies and the other on boron i
11 precipitation.
12 The BWR owners was engaged once with the Viton --
13 I think the pump seals, and the Combustion, we do not -- I'm 14 sorry.
15 MR. RAUSCH:
Valve seals.
16 MR. SHERON:
Valve seals, I'm sorry.
17 And Combustion, we -- according to our records, we 18 really haven't activated that RRG.
19 CHAIRMAN JACKSON:
How does one activate?
And the I
20 membership is drawn from each of the owners groups, or how 21 does that work?
22 MR. SHERON:
Basically, the office director --
23 once a decision is made,'the office director would call the 24 chairman of the RRG and basically explain what the issue is 25 and --
c ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
. ~...
. -. -.. ~. ~. -.. - -..
7 1-CHAIRMAN JACKSON:
No, what I'm saying -- so, it's 21 a-standing group.
3' MR..SHERON:
My understanding, yes.
4 CHAIRMAN JACKSON:
It's a standing group?
5 MR. LIBERATORI:
As far as I know.
6 MR. SHERON:
That's correct.
7 CHAIRMAN JACKSON:
Okay.
I understand.
8 So, each owners group has a standing regulatory 9
response group.
- 10 MR. LIBERATORI:
Yes.
11 MR. SHERON:
Yes.
12 CHAIRMAN JACKSON:
Okay.
I understand.
13 MR. SHERON:
Okay.
14 Second slide, please.
15:
I'm sorry,. third slide.
No, you've got it right 16 there.
I'm sorry.
17 With regard to the interactions with the owners 18 groups, NRR has assigned a project manager to serve as a 19' focal point for coordinating activities, setting up 20 meetings, and being basically our interface with each owners 21 group.
22 We. meet with the owners group usually about twice 23 a year, depending.
24 Sometimes it may be once a' year, but mostly it's 25
-- we meet twice a year with senior management.
Usually Mr.
I ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034 4
w.
m
- +.,
8 1
Collins will attend, I will attend, my division directors 2
will attend, and any other managers and staff that have 3
items on the agenda.
4 We use these meetings as an opportunity to discuss 5
not only technical issues and look for common approaches in 6
terms of resolution.
)
7 We use it as an opportunity to bring forward any 8
new or emerging issues that on our plate.
9 Likewise, the owners groups will come forward and i
10 t' ell us any initiatives and where their -- what the status l
11 is.
12 Issues that we discuss are some like I've just t
13 discussed with the RRG, and we brought up with the RRG 14 others, on the year 2000, for example, status on that, and 15 any other technical issues, for example vessel head cracking 16 and so forth.
17 The project managers that interact -- that are 18 basically the coordinators with the owners group also serve 19 to coordinate with topical report reviews that we do, that 20 are submitted, and basically, overall, provide for more 21 efficient utilization, you know, the owners group, provide 22 for more, efficient utilization of not only the staff 23 resources but also their own.
24 One example is the BWR VIP, which I'm sure you're 25 familiar with, and one of the things we did there is they ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034 i
9 1
submitted a number of topical reports regarding the l
2 inspection and repair of BWR internals, and we did generic 3
reviews of those topicals such that now, if a BWR does an j
4 inspection during an outage, finds some degradation or 5
cracking, they have staff reviewed and approved methods to 6
deal with that, and it basically gets us out of the loop.
7 So, it's very proactive.
8 CHAIRMAN JACKSON:
You mentioned topical reports, 9
and I understand that sometimes there is not a lead plant 10 identified for the implementation of or use of the topical 11 report, and so, the question becomes -- and I'm going to put it to the staff but also any member -- chairman of any of 12 13 the owners groups, I'd appreciate an answer.
14 How does the NRC -- you know, we have declining 15 resources and etcetera, etcetera.
16 How does the NRC assign priority and resources to 17 these reviews, not knowing whether the tcpical report will 18 be utilized but at the same time trying to be responsive to.
19 the owners groups and to prepare che NRC and the industry 20 for the future, because I've actually had criticism come to 21 us because people feel that not sufficient attention has 22 been given to a given topical report, but at the same time, 23 in trying to align resources, there isn't always a lead 24 plant or someone who really wants to make use of it.
25 So, I'm just happy to hear from anyone.
Maybe ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034
10 j
i 1
I'll just go down the line, as I used to do when I was a 2
professor.
If nobody raises his hand, and Commissioner Diaz 3
knows this, then you just go down the line.
4 MR. LIBERATORI:
I guess, from the Westinghouse 5
owners group perspective, most of our submittals will be 6
associated with if not followed up by a lead plant.
There 7
are some that come through that we're still, you know, f
8 trying to identify the specific lead plant, but the generic 9
review can be started, but more often than not, I would say 10 we submit our topicals with the lead plant.
i 11 We find that's most effective, because at the 12 utility end, working on a common issue with a. common 13 submittal certainly helps our resources, and on the staff's 14 end, they can review a generic submittal.
15 That sets the ground rules.for specific l
16, implementation.
It saves time at the back end on the j
l 17 individual plant applications.
i 18 So, we've always looked at the topical review 19 process as a win-win situation.
[
For the Combustion Engineering Owr.ers l
t l
L 21 Group, I think you have to go back a bit in history.
l l
22 As Brian mentioned, there were a number of topical I
23 reports produced in the post-TMI period.
There were no lead i
24 plants for t'aese.
These all got expeditious review because f
25 of.a keen interest on the part of the staff.
I i
l ANN RILEY & ASSOCIATES, LTD.
l Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-3034 L
i L
1 l
11 1
In more recent times, we don't expect topical 2
reports to be reviewed unless there is a lead plant 3
submitted.
4 So, we understand the reality of the situation.
5 CHAIRMAN JACKSON:
Mr. Rausch?
6 MR. RAUSCH:
We're kind of -- I think all the 7
owners groups are fairly similar.
8 I think, if you are talking about a CBLE type of 9
effort, then early in the process I would expect the staff 10 to ask if we had a lead plant id3ntified, or we would just 11 offer one, but many of our efforts, as Dave Pilmer 12 mentioned, are on issues that are high on your priorities 13 list, as well, and it is not necessary, such as suction 14 strainers, to have a lead plant for a comprehensive 15 methodology, because everybody is going to be using it.
i 16 CHAIPMAN JACKSON:
Mr. Foster.
17 MR. FOSTER:
I guess the only thing I would add is 18 that, fram cne B&W owners group perspective, the way we 19 approach license renewal is we put together topical reports 20 that our members could use in their submittals, and we have 21 submitted those to the NRC and we have followed up after 22 that with the submittal of Oconee for license renewal.
23 Now, for that application from Oconee to be 24 completed, there's still a couple of topical reports that 25 have not -- that have beer. submitted for a long time but ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034
12 1
haven't been completed'that will be necessary to be 2
completed prior to that application being able to get 3
approved.
4 CHAIRMAN JACKSON:
Mr. Sheron, can you speak to I
5 that?
6 MR. SHERON:
Well, with regard to the priorities 7
that we assign, I think, you know, the way we try and 8
approach it is that we try to serve the most people that we 9
can.
10 So, if, for example, there's a topical that comes 11 in in which there, for example, are 10 plants which have
?
12 indicated a need for it, versus, say, one, we would 13 obviously give that one higher priority.
14 We like to have a lead plant, because it does i
15 indicate that there is a definite use for it and it is not l
16 just something that we would be doing that might sit on a l
17 shelf for a while.
l 18 We want to make sure that the stuff we're doing is t
19 the highest priority for the industry, as well as for l
20 ourselves.
l l
21 There are situations where we will review topicals 22 where there may not be a lead plant.
23 I think the BWR VIP was a good example where, if 24 the topical report has a real contribution to safety, we
~
25 will review that regardless of whether there is a lead plant s
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
13 1
to make a finding so that now the BWR owners can use those 2
topicals.
3 CHAIRMAN JACKSON:
Has this been a point of 4
neuralgia between us and the owners groups in terms of ho--
5 we prioritize or the priority we assign to these?
6 MR. SHERON:
Sometimes it has.
I think that, for 7
those topicals where we felt they may be more 8
cost-beneficial but not really have a real nexus to safety, 9
we would normally focus en those that had the nexus to 10 safety and then, once we finish those, we would work on the 11 others.
12 The other kind -- for example, on the barrel 13 baffle bolting issue, the owners group, I believe, does have 14 topicals which they would like us to approve in order to go 15 forward with that.
16 We are just limited by the number of resources in 17 terms of those topicals to meet their schedule, and there 18 was a scheduler problem that I think they wanted to have the 19 topicals reviewed by this fall, and I think we couldn't 20 really get to it until -- finish ' em until next spring, and 21 so, we were looking for alternative ways in which they could 22 either go forward and deal with the technical issue, which 23 might -- you know, broken bolts that hold the core formers 24 on, without having a specific NRC review in hand.
25 I'm not sure where that is right now, but yes, ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034
~
14
~1 there are some areas where we have had difficulties in 2
reaching. agreement on priority and schedule.
3 COMMISSIONER McGAFFIGAN:
Is this an area where 4
- you get complaints at RAIs and about lack of discipline in 5
our process.
j 6
I think the Chairman and I are both exploring --
7
. we've heard general criticisms, and obviously, in many l
8 areas, we've heard that RAIs are undisciplined -- I mean i
9 sort of kicking the'can down the road, and is that part of i
10 the concern here, as well?
11 If you could do more topicals more promptly_with 12 fewer RAls, maybe.the same resources could get a few more 13 topicals behind us.
i 14 CHAIRMAN JACKSON:
Is the problem in the process 15 or is it iri the prioritization and the schedule that goes i
16 with it?-
i 17 MR. SHERON:
I guess, from my point of view, it's 18-just in the prioritization, in trying to find staff 19 available to work on it, rather than working on other -- you
[
20 know, either higher-priority topicals or licensing --
21 CHAIRMAN JACKSON:
So, it's not that it takes an 22 excessively long time once you get --
23 MR. SHERON:
I won't deny that there may be some
[
24 that have taken excessively long,-and I certainly can't deny
[
25 that we may have asked questions that perhaps went outside i
l 1
ANN RILEY & ASSOCIATES, LTD.
}
Court Reporters i
1025 Connecticut Avenue, NW, Suite 1014 i
Washington, D.C. 20036 l
(202) 842-0034 i
i s
.~
. _.. _ _ _.... _ _ _. _ ~ _ _ _.. _. _.
15 1
the box a little bit, but I'm not aware that that's some 2
sort of rt endemic problem, at least not in the topicals, 3
but I'd probably want to defer to the chairmen here to see 4
if --
5 COMMISSIONER McGAFFIGAN:
If you're going to defer 6
to the chairmen, one last question.
Did they give you any 7
help at times in sorting out -- if there's a bunch of 8
topicals in and you don't have enough resources, do they 9
-help you, say well our group believes you should work on 10 this one first, even though it will disadvantage plant Y?
11 MR. SHERON:
Yes.
We've asked -- usually, at the 12 periodic meetings we have with the owners group, we have 13 periodically sat down and gone through the list of topical 14
. reports and asked whether or not they were still -- you 15 know, what their priority was, were they still the top 16 priority, did they move down, were there others that were 17 higher, so that we could focus our resources on the ones 18 that they felt were most important to them.
19 MR. LIBERATORI:
I was going to add to what Brian 20 said.
21 We maintain a running table.
Every time we have 22 one of our management meetings with staff, we throw the 23 tab.1.e up, and that table is prioritized from our 24 perspective, and again, our priority doesn't always match, 25 you know, staff's priority.
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
16 1
We do have different drivers, at least in some 2
levels, and we go over those priorities, and not only do we i
3 talk about the ones that they have in hand, but we also give 4
them a heads-up on those topicals that we see coming, those l
5 that will be submitted in the next three to six months or 6
so, so the staff has a heads-up as to what's coming, as 7
well.
8 So, we certainly do that at our periodic meetings.
9 CHAIRMAN JACKSON:
Please.
10 MR. FOSTER:
While my comment may not be directly 11 related to just topicals, your questions about requests for 12 additional information is a good one.
13 I think that you've gotten some feedback that 14 indicates that there'is some room for improvement there, and 15 I would certainly think that there is.
16 MR. RAUSCH:
I would like to second that, also.
I 17 think there are plenty of occasions where the RAI process 18 for generic submittals went very smoothly, and I think it 19 depends a lot on the issue and the reviewers involved.
20 A couple of specific instances where I think there' 21 could be improvement would be, for example, when there is 22 turnover in the reviewer or in the contractor and you see 23 the same RAI 18 months later.
24 CHAIRMAN JACKSON:
I see.
So, more continuity of i
25 ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034 i
- ~ -
.. - ~. -.
L 17 L
1 MR. RAUSCH:
That's one type of thing.
i 2
CHAIRMAN JACKSON:
-- of approach.
- Okay, i
3 MR. FOSTER:
Or just get it right the first time, f
o 1
4 Let's get the questions on the table we need to address and 5
let's' address them.
It would save us a lot of time in going 6
through a number of cycles.
7 MR. RAUSCH:
Another area concerning us is --
B CRAIRMAN JACKSON:
Although, in principle, some things -- some questions don't -- you don't know till you 9
10 start reviewing, j
11 MR. FOSTER:
That's correct.
l 12 MR. RAUSCH:
There's another issue that I think 13 NEI's been involved in, also, in that occasionally the RAIs i
14 will include words about reconfirming all commitments from i
15 previous SERs.
16 That's been very sporadic, but it's something we i
17 want to be careful about, having to recreate a licensing 18 basis through the RAI process.
19 CHAIRMAN JACKSON:
Do you have any comments,
-20 Brian?
21 MR. SHERON:
The best I could say is that, as you 22 know, in a tasking memo, one of the items that I'm 23 responsible for is looking into the RAI issue, and so, we're 24 aware of a lot of these concerns, as well as others, and 25 we've pat in motion a number of initiatives to try and 1
AJRJ RILEY & ASSOCIATES, LTD.
i Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 i
'dashington, D.C. 20036 (202) 842-0034 j
18 1
improve the process and work better with the industry on the 2
whole review process from start to finish, from the time a 3
submittal comes in to the time an SER goes out, you know, 4
hopefully to minimize a lot of these problems, and obviously 5
we'll be talking to you more on that.
6 COMMISSIONER McGAFFIGAN:
I might just follow up.
7 Some of the higher-priority generic submittals that we have 8
at the moment -- and that's the -- obviously the Babcock and 9
Wilcox topicals that are needed for Oconee, but there also 10 are, I think, on the order of 12 to 20 Westinghouse and GE 11 topicals in that will be used by Hatch, Turkey Point, and 12 presumably lots of other folks, since most of the plants are 13 GE and Westinghouse plants.
14 How are you going to get -- we're also under 15 pressure to -- you know, appropriate pressure to do better 16 after the first couple license renewal applications on the 17 585-day cycle that we have for staff review.
So, getting 18 these topicals done before the submittals come in would 19 probably get -- you know, I don't know what -- I mean I'd be 20 here in 2001 when you're giving your direction, but you may 21 be down to a 345-day period for -- from 585, or God knows 22 what.
23 We won't be at Corbin McNeil's three months or six 24 months, because NEPA won't allow it, but we'll be at -- be 25 under constant pressure to shorten the renewal -- the review ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
1 19 1
time, because we presumably will be learning.
2 But if the topicals haven't been looked at ahead 3
of time, you may not be able to improve the timing.
4 So, how do you see Westinghouse and GE topicals 5
getting reviewed this coming year, before we get the Hatch 6
and Turkey Point applications?
7 MR. SHERON:
We've put additional resources.
Most 8
of these are in the Division of Engineering.
That's the i
9 principle division that has most of the license renewal 10 work.
11 They are -- they have looked at their resources in 12 terms of what is needed in order to meet these schedules.
1 13 Two things that will help the situation -- one is 1
14 we've finished the AP600, and that will free up a number of i
15 reviewers which we will now be able to move onto these
]
16 topicals which we did not have before, and the other is we i
17 do have some generic issues that are going to be finishing 18 up.
19 For example, the 8A46, the seismic, we've pretty 20 much finished that now, and hopefully, the Generic Letter 21 89-10, the pumps -- I'm sorry, the valves program -- is l
22 going to finish up, and so, we've got some reviewers that 23 will be freed up and be able to move over onto these 24 topicals.
l 25 With the B&W topicals, I just checked on the 1
1 I
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034
20 i
status of those about a week ago, and my understanding is 2
they are imminent in terms of going out, and the other thing 3
is that, when topicals do come in -- for example, I believe 4
the BWR VIP topicals have appendices that address the 5
license renewal aspects of that technical issue, and we put 6
higher priority on them when they have the' license renewal 7
appendix on them.
8 CHAIRMAN JACKSON:
How well supported by the 9
plants who have things at stake vis a vis license renewal --
10 how much support are they providing to your topical review 11 process if, in fact, the given topical report has 12 implications for them with license renewal?
13 MR. SHERON:
I personally don't know, because I 14 think, when we interact in terms of the review, we -interact l
15 with the owners group.
Okay.
So, the extent -- to.the 16 extent that they step forward within the owners group to 17 answer questions, perhaps the chairmen might answer that 18 better than I could.
19 MR. LIBERATORI:
Yes.
License renewal is one of 20 those cases where you have a chicken-and-egg situation.
21 You'd like to have a lead plant to maybe give a 22 higher priority to the review, but on the other hand, some 23 of these are very basic generic issues that have to be 24 resolved for the long term, and a lot of the members felt 25 that some of these generic topicals needed to be reviewed to ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034 i
21 l
1 remove some of the regulatory uncertainty from the process 2
before they were willing to commit.
3 So, this is a little bit of a complicated issue at 4
the most because of the broad-based nature of the i
5 information that we're dealing with here, but we have 15 6
reports we've developed, though, for the last five years 7
we've been working on license renewal, five of which we've
{
8 submitted to staff for review.
9 CHAIRMAN JACKSON:
Do you do a risk ranking?
I 10 mean do you have a risk-informed prioritization scheme?
11 MR. SHERON:
Of the topicals?
12 CHAIRMAN JACKSON:
Yes.
I mean assuming they are i
13 ones that don't necessarily have a specific licensee who's 14 interested.
15 MR. SHERON:
I wouldn't call it a risk ranking, l
16 but we use a prioritization scheme, as I said, where we will 17 ask the owners groups what they believe is most important to 18 them.
19 Then, as I said, we will also look and say -- you 20 know, we will try and review those which we think have the 21 most safety significance as well as the most potential 22 users.
23 So, it's not a very, you know, pure, you know, 24 risk -- you know, it's risk-informed if you want to say it.
25 We take a lot of things into consideration.
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
.. -. - -. -. ~. -
-.. - - -. _. ~.. -
... - - ~ - - -.. _
j 22 l'
CHAIRMAN. JACKSON:
Okay.
I 2
MR. SHERON:
Could I have slide'four, please?
i 3
One of the areas that we are focusing on right 4
now, as I just said before, is DSI-13, the role of the i
5 industry, which basically involves addressing how we will f
i 6
utilize more efficiently and effectively both industry 7
consensus standards as well as industry initiatives to 8
address regulatory issues.
I 9
We just had a stakeholder' meeting September 1st in 10 Chicago'to address the issues on the DSI-13, including codes t
t
-11 and standards, as well as industry initiatives and reporting
[
12 requirements, and I believe there will be Commission papers j
13 coming up with the results of that stakeholder meeting, l
14
~ along with the recommendations, over the next couple of 15 months.
16 But I think, in.the context of DSI-13, we have H17
.been looking --Jactually,.we kind of started this some time 18 ago, where we have been looking to the owners groups to 19 proactively address issues and thereby avoid the staff i
20 having to take certain regulatory actions, particularly i
21 generic letters, and so, I would say that, you know, we have I
i 22 a lot of good success stories there.
23 I know the one I always talk about is the BWR VIP, i
24 where we issued a generic letter when we first noticed core l
25-shroud cracking.
I ANN RILEY & ASSOCIATES, LTD.
(
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
[
t
23 1
The generic letter focused strictly on the core 2
shrouds, but then the next obvious questions were what about 3
the rest of the internals, and rather than sit there and 4
crank out more generic letters, you know, what are going to 5
do about this or that, we engaged the owners group, they set 6
up the vessel internals program, and they said we will 7
proactively address how we will deal with other internals 8
from the standpoint of inspection, you know, the repair, 9
etcetera, on that, and the staff basically went into a 10 monitoring mode.
11 CHAIRMAN JACKSON:
How do you know that all 12 licensees have committed to and implemented the given 13 industry initiative?
14 MR. SHERON:
That's been a question we've been --
15 we've actually put to most of the owners groups as one of 16 the remaining issues that we still need to deal with under 17 DSI-13, and that.is, for voluntary initiatives, how do we 18 know that, you know, six months or six years later, a
19 utility won't, you know, back out of a commitment?
20 We're looking at different ways to do it.
Some 21 is, if committing to an action actually affects the design, 22 then it should be reflected in the FSER, which then involves 23 a commitment.
24 The other is, is that a lot of times -- for 25 example, we agreed with the BWR VIP reports that they --
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034
24 1
that based -- that our review of those reports basically 2
constituted an acceptable means of dealing with the I
3 internals from the standpoint of doing inspections, and 4
therefore, provided a licensee went in and did an inspection 5
and therefore did a repair in accordance with those 6-topicals, we would be satisfied, and that only if they 7
decided to deviate from the topical should they come in and 8
inform the staff.
9 We still haven't worked out all the details on l
10 every case, okay?
11 But I think we're making some h'eadway so that, 12 basically, for these voluntary initiatives, we will have 13 some way of having assurance that the utilities will either, 14 you know, continue to abide by the commitments or inform the 15 staff.
E16 Other --
17 CHAIRMAN JACKSON:
What happens if you have 18 licensees that don't implement the initiative?
19 MR. SHERON:
We would have to decide what to do on 20 a plant-specific basis.
21 For example, you know, if a group of licensees 22 decided not to abide by an owners group solution, the burden 23 would be on us to go out and either do -- either issue 24 plant-specific 50.54 (f) letters asking'how they were going 25 to address the issue and then look at their responses and i
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut. Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
}
l
25 determine their acceptability on a plant-specific basis.
1 2
CHAIRMAN JACKSON:
But at this point, you don't i
3_
have necessarily a complete scheme of determining the degree 3
4 of implementation.
Is that what you're telling me?
5 MR. SHERON:
For the most part, we have been i
6 asking. utilities, the owners groups, to provide us with some 7
indication of, you know, how many of their owners have 8
agreed to implement certain actions, either by referencing 9
or sending in a letter or hopefully by documenting it in i
10 some sort of a design basis document.
11 You know, a lot of times, though, the information 12 in the topical reports are not really part of the design; it'
]
13 basically is just a method.
14 And so, as I said, you know, we're still not l
15 100-percent there in terms of saying that we have 16 100-percent assurance that every licensee will abide by 17 something andJnot, you know, change their commitment.
18 COMMISSIONER DIAZ:
Would that be a good idea to 19 have the owners groups, you know, discuss with the 20 responsible party in the NRC what level of, say, voluntary 21-commitment is being abided by or how many plants have done 22 it?
23 Does that get into, you know, conflicts of 24 interest, or how does that work?
25 MR. LIBERATORI:
Well, for the Westinghouse owners ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034 I
[
26 j
group, on.those issues that warrant that kind of attention, l'
- 2 we typically try to address those at our semi-annual 3
meeting.
+
4 There are issues where we've submitted letters to i
5 staff, where they've asked for what's the status of -- for' l
6 exampie, the burnable poison fuel issue on the Westinghouse 7
plants -- we' submitted a letter identify plant by plant 8
who's addressed it, who still has it in, what the dates 9
were.
i 10 So, I've seen.it done both ways, in writing and l
i 11 through discussion.
f 12 CHAIRMAN JACKSON:
It strikes me that this is the i
13 kind of situation where it's potentially easy to lose your i
14 way.
i 15 If you start out from the point of view that there l
16 is an issue that the agency feels it normally would' issue a j
17 generic communication.for, which may have embodied in it --
18 and there are various types of generic communications --
19
.certain requirements, but there's an industry voluntary i
20 initiative in lieu of that, then it strikes me that, at the 21 first instance, the staff has to decide, the NRC has to
[
i t
22 decide, is the voluntary initiative going to cover the 23 waterfront from the point of view of the regulator, and if 24 so, to what extent?
Does it have be 100 percent or not?
25 And then one has to know, i's, in fact, the waterfront I
t ANN RILEY & ASSOCIATES, LTD.
Court Reporters I
1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034~
[
h
27 1
covered.
You have to have that information.
And then, if 2
not, then what are you going to do about it?
3 And I haven t totally heard a totally coherent 4
scheme in terms of those kinds of decision points that would 5
work across the board.
6 COMMISSIONER McGAFFIGAN:
I might just add that I 7
think it's further complicated by backfit considerations, 8
which is cnother issue that we hear a lot about.
9 I think generic communications aren't supposed to 10
-- aren't subject to backfit because they're not -- they 11 don't impose requirements, they're information requests or 12 whatever, and I'm trying to remember what the lawyers write 13 for us.
14 MR. CHANDLER:
As a general matter, that's true.
15 COMMISSIONER McGAFFIGAN:
Right.
16 So, if it's a true requirement, some sort of backfit analysis is required, and many of these items may 17 18 not pass the substantial increase test in 51.09.
19 So, there's -- I think there are backfit issues 20 that lurk in trying to find how this all works, as well, 21 that I don't claim to understand.
I just know that they're 22 probably there somewhere.
23 CHAIRMAN JACKSON:
Does OGC have an opinion on the 24
-- a view on the issue of relying upon "dustry actions 25 instead of NRC issuing some kind of generic communication?
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034 Es
..____._.._m._..__._.._____._,_.___
28 1
MR. CHANDLER:
In terms -- they're essentially 2
comparable to generic communications in terms of whether j
3
'they create binding obligations on the parts of licensees.
{
4 Generic communications, as we've discussed on-5 other occasions, don't create a binding obligation.
They 6
may present an acceptable -- a means acceptable to the staff i
7 for satisfying a particular requirement, much in the same 8
way as an industry commitment might or a licensee commitment I
9 might, might do the same.
10 If more formal binding requirements are necessary, f
11 other steps need to be taken.
12 COMMISSIONER DIAZ:
Is there a way of -- I mean do 13 we track this somehow?
I mean that's the bottom line.
Do 14 we track what is happening?
I think that's what we -- you 15 know, if we have that information, then we can --
j 16 MR. SHERON:
I think now we are starting,.you 17 know, as part of the'DSI-13, to actually, you know, come up 18 with a way to track these commitments, because again, you i
19
' know, we are not dealing with where we have formal
~
i submittals in response to a specific generic letter.
l t
21 I.would add on generic letters that generic i
22 letters do not impose any backfits.
They are -- I think i
23 every generic letter is a 50.54(f) request for information.
l L
i 24 I think the concern that the. industry has and has E
25 always had is the way they're worded, okay?
Because a lot
(
f l
ANN RILEY & ASSOCIATES, LTD.
t i.
1025 Connecticut Avenue, NW, Suite 1014 Court Reporters l
Washington, D.C. 20036 (202) 842-0034 i
a-
i 29 l
l 1
of times we question whether or not a utility remains in l
2 compliance because of some new information, and when we l
3 write the generic letter out, we ask them to tell us, why do 4
you believe you are still in compliance given this, this, L
5 and this, an'd.that is interpreted sort of as, you know, I 6
better fix something or they're going to tell me I'm not in 7
compliance.
8 That's'really -- you know, the letter does not 9
impose anything, but it does put a burden on the licensee to
- 10 justify why they still believe they're in compliance based 11 on this new information, and that seems to be where the 12 point of contention is many times.
13 MR. CALLAN:
There is another aspect to the 14 licensees' frustration, I think, about generic l
15 communications, and that is, to the extent that they are 16 followed up on through the inspection process, oftentimes, 17 too, that inspection process -- there is utility or licensee l
I 18 concern that additional requirerents are backfit on them due 19 to inspector expectations.
20 COMMISSIONER McGAFFIGAN:
And I might, in a less, l
21 than uniform way.
22 MR. CALLAN:
Less than uniform way.
l 23 CHAIRMAN JACKSON:
That's why the issue of the 24 coherent scheme and what Commissioner Diaz raised about l
25' being able to track what's going on.
I mean you can l
l ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034 I
30
.1 re-normalize the process.
2 MR. CHANDLER:
The other possibility is they have l
3
-- they. reflect the changed position which also may have f
4 some backfit implications.
That's what I was referring to j
5 before.
L 6
CHAIRMAN JACKSON:
Right.
7 MR. SHERON:
But I think, on a positive note, we f
8 have -- I think, with the BWR VIP, we probably avoided two j
9; additional generic letters as a minimum.
10 We never sent one out on the barrel baffle bolting e
11' with the Westinghouse owners, because they took a proactive 12
. stand on that.
i 13 We have, right now, another where we have engaged
{
14 NEI to look at a concern we had with regard to the Oconee i
i 15 HPI line crack at the weld and the fact that the inspection i
16 techniques were missing -- I won't say missing, but there e
l
-17 appeared to be a discrepancy in the ASME code, and rather j
18 than, again, issue out a generic letter, we asked NEI to i
19 engage the industry to say, you know, here's the issue, l
t 20 okay?' It's not something of immediate safety concern and l
21 the like, but nonetheless, you know, if you would like to
{
22 proactively deal with this, we'll, you know -- you know, l
23 we'll be willing to sit back and, you know, see what you 24 come up with on that.
j 25 So, it is working, and I think -- I checked, and I I
t ANN-RILEY & ASSOCIATES, LTD.
Court Reporters l
1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 l
(202) 842-0034 l
31 think the staff had come -- I don't know if I brought it 1
2 with me.
3 A lot of people probaoly don't understand that, in 4
total, we have canceled more generic letters this year than 5
we issued.
So, we are changing our whole approach on 6
generic letters.
7 CHAIRMAN JACKSON:
Now, on the other hand -- I'm 8
already jumping ahead to your recent successes, slide five.
9 Let me say this.
10 You issued a generic letter in July of this year 11 on, you know, protective coating deficiencies and foreign 12 material in containment, and from a big-picture perspective, 13 it seems that we've been dealing with and discussing ECCS 14 strainers and foreign material in containment for more than 15 five years, and so, what's the problem?
16 Why has it not come to resolution?
I mean is it 17 an important issue or is it not?
18 MR. SHERON:
It's an important issue from design 19 base.
From a risk perspective, I think we're taking a hard 20 look at that.
21 For example, on the -- the whole coating issue 22 came about because it was brought to our attention from 23 outside the agency'that there were coatings inside 24 containment that were, in theory, qualified, okay, that were 25 actually flaking off, and so, it represented a source of ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034
32 1-
. debris which hadn't been considered in any of the 2
calculations.
3 In dealing with it, the generic letter, in
'4 essence, asked the industry to tell us what is your program 5
for dealing with the coatings.
6 CHAIRMAN JACKSON:
Is this an issue that's being
,7 dealt with by the owners groups?
l 8
MR. SHERON: 'The owners groups, I believe --
9-Tom, you can probably speak to what you're doing.
.0-MR. RAUSCH:
Yes, they're all engaged to some i
1 11 degree.
}
12 The BWRs -- it's inseparable from the suction 13 strainer resolution issue.
So, we were several years ahead 14 on that issue.
i 15-The BWRs are quite different from the PWRs, both 16 from a design and risk standpoint on the issue.
f 17 So, we saw that we really needed to link 18.
resolution of coatings to the suction-strainer issue, and 19 we're well in the process of doing that, with the same 20' personnel on the staff that we've been interacting with all 21 along.
22 CHAIRMAN JACKSON:
So, when do you expect to come 23-to some -- at.least iterate to a stable point?
4 24 MR. SHERON: -Well, the industry has submitted' 25 information for -- I mean one thing you're looking at is to i
ANN RILEY & ASSOCIATES, LTD.
i l
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014
~
Washington, D.C. 20036 (202) 842-0034 t
s a
33 1
get credit for leak before break, because if you don't have 2
the jet impingement loads hitting the containment and 3
basically flaking off the paint, then you don't have the.
4 debris source.
5 So, that's one thing we're looking at, is the 6
ability to give credit for leak before break.
That's still 7
under consideration by the staff.
As a matter of fact, it 8
went to our risk-informed panel, I think, last week.
But 9
that may be one approach to dealing with it.
10 But basically we've kind of characterized it as 11 that, you know, the industry really needs to come back and 12 tell us what is their opinion on this.
13 If their FSAR says that they have qualified 14 coatings and the coatings are falling off, then, you know, I 15 think they either need to tell us that -- they need to 16 change their FSAR and say it's not a qualified coating and 17 here's why it's okay or you go in and you remove it and put 18 a qualified coating on.
19 So, we've kind of said that this is really, you 20 know, not our problem that we dreamed up.
That was 21 something that just -- you know, it's an aging problem that 22 needs to be dealt with.
23 CHAIR!%N JACKSON:
Okay.
24 MR. SHERON:
Okay.
The next slide, pleart number 25 five.
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034
1
~
34 1
This is just a list of somelof the, I would call, 2
recent successes that we've had.
)
3 One area, I think, of note was the vendor audits, 4
the last item there, where we had the issue with the Siemens 5
inspection on the ECCS and found difficulties, and the 6
question arose of, gee, aren't licensees supposed to audit 7
their vendors, and what we were concerned with was that the 8
audits were probably more of a paper audit than an in-depth 9
technical audit, and we raised -- rather than go out, again, 10 with a generic connunication of sorts to the industry, we 11 engaged them to address the issue, and my understanding is 12 they've created NUPEC, which is -- in essence, what they're 13 doing is getting technical experts from various utilities 14 that have the expertise and going out and doing in-depth 15 technical audits of the vendors, okay?
16 So, you're not doing the paper audits; you're 17 doing these in-depth technical ones that look at 18 correlations, look at validation, and so forth.
19 So, again, I think that was a real success in the 20 industry, you know, acknowledged what the issue was and 21 picked up the ball and ran with it.
22 In summary -- last slide, please.
23 COMMISSIONER McGAFFIGAN:
Could I just ask one 24 question?
25 MR. SHERON:
Sure.
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034
_ _ _. ~ _. _. -. _
35 1
COMMISSIONER McGAFFIGAN:
The definition of the 2
word "recent" or the adjective "recent" -- some of these 3
look like they're fairly old, in the early_'90s or maybe 4
even late '80s type things.
Is that fair to say?
5__
MR..SHERON:
I think most of these were probably 6
within the last three or four years.
7 COMMISSIONER McGAFFIGAN:
Standard' tech specs?
8 The emergency operating procedures?
9 MR. SHERON:
Well, the emergency operating 10 procedures have been an ongoing -- you know, I think that 11 we're reaching resolution on those now because the industry, 12 you know -- but they did take the initiative to go forward 13 and develop the emergency operating procedures.
14 Yes, there's probably a mixe~ bag here.
Some may 15 have actually originated back in the early '90s, but I think j
16 17 CHAIRMAN JACKSON:
So, "recent" means recently 18 coming to some state of fruition.
19 MR. SHERON:
Yes, although some of them actually 20 were identified and resolved recently.
As I said, the 21 vendor audits, the barrel baffle bolting, the BWR internals 22 projects, suction strainer -- these were all, I think, 23 within the past three or four years.
24 CHAIRMAN JACKSON:
Okay.
25 COMMISSIONER DIAZ:
Let's see.
One issue here --
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
36 1
you know, we have a passing interest in risk information.
2 That, you know, keeps occurring.
3 How have you been working in this area with the 4
owners group?
I know that the Westinghouse owners group and 5
Do you consider that, you know, a 6
success?
Is that matching up with what the agency is trying 7
to do in some areas?
8 How do you see the, quote, " risk-informed" efforts 9-by the owner groups or if there's, you know, significant 10 coupling with what the agency is doing, at least?
11 MR. SHERON:
Well, I think that the risk-informed 12 efforts that the owners groups are participating in, you 13 know', basically are aligned with, you know, where the staff 14
-- you know, what the staff was working on, in areas, for 15 example, of PRA certification.
16 The risk-informed ISI and IST -- those efforts, 17 you know, as they relate to the various owners group -- as 18 you know, one of the ISI methods was a Westinghouse method 19 and so forth.
20 COMMISSIONER DIAZ:
Is that a success?
I-mean is 21 it something that happened and is finished?
22 MR. SHERON:
It's not quite finished.
I'm not 23 going to call it a complete success.
It was a long review.
24 I think there was problems probably on both sides that 1 25 could point to, so I'm not going to point fingers.
You ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034
37 1
know, I don't'want to point blame.
l 2
We're trying to bring it to closure now.
We do 3
have a schedule for completing the IST topicals and the s
4 pilot plants.
5 We have a meeting set up with NEI, I believe, at 6
the end of this month to address the concerns that-were 7
expressed in a recent letter that was addressed to me.
8 There are two issues with regard to implementing 9~
ISI.
l 10 One is the question of the goodness of a PRA.
To 11 what extent does the staff have to understand and, you know, 12 assure itself that the PRA being used to develop the 13 risk-informed ISI program -- you know, is it adequate for 14 that?
I 15 The second is that the topical reports are 16 generic, and we have to have some assurance that they're 17 applicable to the specific plants that want to use them.
18 And so, these are the two key items that we have
)
19 on the agenda with our meeting with NEI to see if we can
(
)
20 bring t'
=e two to resolution, and hopefully, when that's 21
.done, ws ill be able to very quickly process any license 22 amendments that propose to use the risk-informed ISI as an 23 alternative to the current ASME code.
24 COMMISSIONER DIAZ:
And what do you mean by close 25 to resolution?
Six months?
I ANN RILEY & ASSOCIATES, LTD.
Court Reporters 3
l 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
.i
38 1
MR. SHERON:
I'm hoping by the beginning of the 2
calendar year.
3 COMMISSIONER DIAZ:
Okay.
i 4
MR. SHERON:
Slide six, just to summarize, I 5
think, overall, t h'e owners groups have been very proactive 6
in addressing issues, and I think they're playing an 7
increasingly more important role, in particular with regard 8
to DSI-13 and_its implementation.
9 I think the successes that we've talked about 10 basically have saved staff resources as well as, I think, 11 come up with -- in my mind, it comes up with a better 12 solution.
13 I've always said that the utilities know their 14 plants the best, and therefore, I think they're in the best 15 position to really define what'is the right solution, and I 16 would just close by saying we certainly encourage the owners t
17 group to continue working in a proactive way.
18 CHAIRMAN JACKSON:
Okay.
19 MR. SHER.ON:
Thank you.
20 CHAIRMAN JACKSON:
Thank you.
I 21 Who is going to lead off in speaking for the L
22 owners groups?
23 MR. FOSTER:
I am, Chairman.
24 My name is Bill Foster.
I work for Duke Energy 25 Corporation at Oconee Nuclear Station, and I'm the chairman ANN RILEY & ASSOCIATES, LTD.
i Court Reporters L
1025 Connecticut Avenue, NW, Suite 1014 l
Washington, D.C.
20036 (202) 842-0034 l
T 39 l
1 of the steering committee of the B&W owners group.
2 I have two parts I want to play here.
One is some 3'
general comments about all the owners groups andethen some 4
specifics about the B&W owners group.
5 Slide one, please?
Next slide, please.
6 All of the domestic operating plants are members 7
of one or more owners groups..There is significant l
8 international participation in our owners groups, and a very l
9 key element of owners groups is our NSSS vendor who I
i, r
l 10 participates within each of the owners groups.
i 11 CHAIRMAN JACKSON:
Do your international partners j
12 actually work on the resolution of the issues, and do they 13 implement the recommendations?
I 14 MR. FOSTER:
I'll let one of the -- some of the l
15
_other guys -- the B&W owners group has very small 16 participation internationally.
17 CHAIRMAN JACKSON:
Westinghouse is a good 18 candidate.
i 19 MR. LIBERATORI:
We have eight international i
20 members right now of the Westinghouse owners group', and we i
21 see varying levels of participation, some very active, 22 attend all the meetings, even send members to some of our i
23
. subcommittee meetings.
Others are in it just for the 24 information.
So, it runs the whole gamut as far as we've 25 seen.
ANN RILEY & ASSOCIATES, LTD.
1 Court Reporters
{
f 1025 Connecticut Avenue, NW, Suite 1014 I
Washington, D.C.
20036 (202) 842-0034
~
40 1
CHAIRMAN JACKSON:
What about CE?
2 MR. PILMER:
CE has one international member, the 3
Korean electric power, three operating units.
They express 4-a high degree of interest in the products of the owners 5
group, but as far as what they do with them, I have no 6
direct information en that.
7 MR. RAUSCH:
We have very large international 8
participation, very similar to Westinghouse in terms of --
9 depending on the issue that we're actively engaged.
1 10 We have actually two European efforts.
A special l
11 conference is held on risk issues,'another one on valve
]
12 issues, annually,.and we're in the process of encouraging
-i 13 more international participt. tion on the issues directly.
We i
14-have a.new effort, in fact, that is doing that from the 15 beginning.
l 16 But typically, it's an'out-flow from the U.S.
to i
17.
the associate members, we call them.
I i
'18 COMMISSIONER McGAFFIGAN:
This is ringing a bell 19 with something I read in the last couple days, I'm not sure i
20 which publication, but a recent IAEA meeting, Ed Jordan was R21 there tiepresenting the United States, apparently, and there l
22 was some discussion among regulators present about not
'23 duplicating each other's regulatory decisions and having an 24 IAEA database of regulatory decisions that are made in 25 various countries, and it appeared, based on the news l
ANN RILEY & ASSOCIATES, LTD.
Court Reporters i
1025 Connecticut Avenue, NW, Suite 1014 I
Washington, D.C. 20036 (202) 842-0034 l
i 1
n-
i 41 1
report, to have been accepted by this conference as a 2
recommendation.
3-It strikes me that these groups, plus'others -- I 4
mean, presumably Framatome or whoever has owners groups --
5 that they would need -- if this is actually going to happen in IAEA space, you all would have to feed in -- or maybe 6
7 it's the regulator's job to say.what regulatory decisions 1
[
8 are made, but when you have voluntary commitments in lieu of 9
a regulatory decision or as an acceptable means of meeting l
10 the regulatory requirement, then that sort of information l
11 has to feed into this database.
q
(
12 It's a very interesting concept.
I'm not sure
)
13 whether -- how much in the way of resources are going to be 14 required to fill this IAEA database, but you all.probably 15 have an interest in it.
16 MR. LIBERATORI:
.The industry itself has become 17 very global, obviously, and we do spend a lot of time with 18 the French and the Japanese exchanging data, now more so 19 than certcinly we have in the past, and the international 20 members also take the opportunity to make presentations to" 21 our owners groups, at our owners group meetings, as well.
22 So, there is very active participation.
L 23 CHAIRMAN JACKSON:
Okay.
i 24 MR. FOSTER:
Plant expenditures collectively for i
25 the owners groups for 1998 should approximate $35 million.
i ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034 i
i 42 1
.Next slide, please.
2-All of the owners groups have essentially common
[
3 objectives, one of those being to resolve common regulatory 4
issues.
5 We normally do that through our owners groups 6
committee activities, and as we talked about earlier, when 7
necessary we do-respond through our regulatory response 8
groups.
9 We address generic issues in a cost-effective 10 manner by sharing cost for the work we accomplish.
We 11 undertake projects for our technical and economic benefit, 12 and the owners groups do provide an excellent forum for 13
. sharing of information and best practices.
14 CHAIRMAN JACKSON:
Do you -- have you had any 15 indications that deregulation and competition is in any way 16 affecting the level of support for owners group activities?
17 NR. FOSTER:
Certainly, from my perspective with 18 the B&W owners group, there's certainly budgetary impacts of 19 us all wanting to become more efficient.
20 CHAIRMAN JACKSON:
And so, what does that mean in 21 terms of the impact on the owners?
22 RMR. POSTER:
There's a pressure to reduce the 23 amount of money that's put into the owners group, or maybe a 24 better way to say that is the owners group budget becomes 25 more competitive with other dollars spent than the utility ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034
~..
43 1
as to where that split will be for the available dollars.
2-Next slide, please.
3 The owners group does provide a good forum for 4
communication with all parts of our industry, and that
-5 certainly includes the NRC, and as mentioned already, we do 6
have regularly scheduled meetings with NRC senior management 7
with all the owners groups, and we do work directly with the
'8
. staff on specific issues, whether they're from a technical 9
or licensing basis.
10 All of the owners groups do work together with the 11 aid of the NEI.
I do know all of the various owners group 12 chairmen here through interactions with the joint owners 13 group.
We had a meeting yesterday, as a matter of fact.
We 14 do discuss industry issues in that forum.
15.
A joint owners group effort on air-operated valves 16 was recently initiated to develop maintenance and testing 17 guides for the industry.
I think that's an excellent 18 example of a joint owners group activity.
19 We also participate with NEI in task force, as 20 appropriate.
21 CHAIRMAN JACKSON:
Is there a role for joint 22 owners groups in terms of the development of probabilistic 22 safety assessment standards and certification?
24 MR. FOSTER:
I'm not sure that I could answ~er 25 that.
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
l 44 1
MR. RAUSCH:
It's'already started.
There's an 1
2 effort entitled PSA certification.
I believe the staff has 3
held a workshop in that regard, and I believe the BWR owners 4
group initiated it.
I think Westinghouse owners group is on 5
board.
I'm not sure how many other ones are on board.
I 6
think we've all been sharing the information.
7 CHAIRMAN JACKSON:
So, you're actually part of 8
that effort.
9 MR. RAUSCH:
Yes.
10 CHAIRMAN JACKSON:
Okay.
11 MR. LIBERATORI:
And we all work through the NEI 12 task force on that, as well.
13 MR. FOSTER:
Next slide.
14 Each of the~ owners groups also works with INPO and 15 EPRI.
16 INPO provides the owners groups with performance l
17 measures and nerformance data.
We also acquire from them 18 industry experience, lessons learned.
l 19 From EPRI, they frequently attend our meetings.
l' 20 They share their information with us.
We understand their 21 initiatives, and as necessary, we do use their services in 22 helping us with our various projects and efforts.
l 23 Next slide, please.
24 At this point, I'll move to providing you some 1
25 information about the B&W owners group.
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 l
(202) 842-0034
l 4
l i.
45 1
Next slide, please.
2 The B&W owners group is rather small compared to-3 the other owners groups.
We're made up of five utilities j
'4-that have the B&W NSSS system.
That includes seven 5
operating units.
6 We work through a typical structure of an 7
executive and a steering committee that provides direction 8
to our various committees, task forces, and working groups.
L 9
We do have'a Framatome project team that's kind of i
10 the glue that holds us together and supports our collective 1
'll efforts.
12 Currently we have underway over 80 projects.
I'll 13 be covering just a few of those projects at a high level and 14 give you a feel for some of our activities.
i 15 Next slide, please.
16 CHAIRMAN JACKSON:
Actually, I noted that you have t
17 these two distinct. groups -- risk-based --
i l
18 MR. FOSTER:
Yes.
i 19 CHAIRMAN JACKSON:
-- applications --
i 20 MR. FOSTER:
-- working group, yes, ma'am.
I l
21 CHAIRMAN JACKSON:
-- and the regulatory L
22 reduction.
I mean how are they intertwined?
They're not?
t 23 MR. POSTER:
The risk-based applications working i
24 group.is primarily looking at probability risk assessment 25 issues.
4 4
i ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034 l
46 1
The regulatory reduction working group was most 2
active when we were looking at cost-beneficial licensing 3
actions.
There's not a lot of work in that particular arena 4
yet, a good bit of work over in the probability area.
5 CHAIRMAN JACKSON:
Okay.
6 MR. FOSTER:
Next slide, please.
7-I need to back up one slide, please.
Thank you.
8 Steam generator lifecycle management takes about 9
40 percent of our budget or better over the last several 10 years, and we have projects ongoing in numbers of our 11 committees that support our steam generator efforts.
12 That includes our analysis committee, chemistry 13 committee, NDE committee, certainly the steam generator 14 committee, 15 Just to mention a couple of our more prominent 16 efforts, we have an effort underway for some time to develop 17 an alternate repair criteria for inter-granular attack and 18 primary water stress corrosion cracking degradation 19 mechanisms.
20 As an owners group, we work together to prepare 21 generic letter responses for the steam generator generic 22 letters.
(
_23 Each of our utilities has participated in tube 24 pull projects' in our generators to help us understand the 25 various degradation mechanisms that we've gained after ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034 l
1
6 47 1
analysis of those tube specimens, and we currently and 2
continually have projects underway to improve our eddy 3
current production and analysis techniques.
4 Next slide, pit _se.
5 We have numerous efforts underway supporting the 6
integrity of our reactor vessels.
This includes irradiation 7
of surveillance specimens in our vessels.
We use this 8
collected radiation data, then, to test those specimens, and 9
then we use that data to meet our 10 CFR 50 requirements.
l L
10 We also actively support industry development of j
11 analysis and test methods.
12 CHAIRMAN JACKSON:
Let me ask you a question about 13 reactor pressure vessel integrity.
14 Whatever happened to annealing?
That died on the 15 vine?
16 MR. LIBERATORI:
It didn't.
I have it on one of 17 my later slides.
18 CHAIRMAN JACKSON:
Oh, you do?
I'll wait.
19 MR. LIBERATORI:
Okay.
20 CHAIRMAN JACKSON:
The second question, though, 21 which relates to this, and maybe others will cover it, and 22 that is, you know, when I was in Japan a couple of years 23 ago, they were doing work to be able to look more directly 24 at the reactor pressure vessel in situ, because the 25 specimens, surveillance capsules sometimes, or as they call ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034
4 48 1
them, the coupons, you know, there was a question about the 2
degree of their fidelity to the actual composition of the 3
welds of the reactor pressure vessels, as well as the 4
coupons themselves are not subject to the same -- quite the 5
same environment in terms of stress and so forth, because 6
it's not just irradiation but, you know, the other factors.
7 Are you doing anything along those lines in terms 8
of in situ measurements of the integrity of the reactor 9
vessel?
Have you had any international interactions or 10 cooperation in that regard?
11 MR. FOSTER:
I'm not aware of any nor am I i
12 prepared to answer that question.
13 MR. LIBERATORI:
I'm not prepared to answer in 14 detail.
What I can say, though, is the industry is i
15 formulating a materials reliability program effort that's 16 similar to what's been in function with respect to steam 17 generators.
18 CHAIRMAN JACKSON:
19 MR. LIBERATORI:
And the intent is to deal with 20 material issues that relate to all PWRs, and I know reactor 21 vessel integrity is one of the first three items that they
[
22' want to look at.
23 CHAIRMAN JACKSON:
Okay.
-24 MR. PILMER:
I'm going to address reactor vessel 25 issues, also.
CE manufactured 53 of the domestic reactor ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034
l 1
i I
t 49 1
vessels in this country, and we have a big program on that, 2
but I've never heard that chere was a real concern with the 3
faithfulness of the c'apsules to indicate embrittlement.
L l
4 There are uncertainties, of course, and I believe they're l
5 well accounted for.
t 6
CHAIRMAN JACKSON:
I'll be interested when you l
7 come around to talk about how you, in fact, bound those 8
uncertainties.
l 9
MR. PILMER:
Okay.
10 CHAIRMAN JACKSON:
Okay.
Thanks.
11 MR. FOSTER:
Next slide, please.
12 i
We do have a very active materials committee in i
13 the B&W owners group, and we have been active participants in the formation and work that's going on in this industry, 14 15 PWR material reliability project that Lou just mentioned.
16 In the materials area, we do have projects i
17 underway looking at reactor vessel internals bolting, and I
18 I'll address that a little further in a minute.
19 We have activities underway that address industry 20 issues relative to the control rod drive nozzle weld PWSVC 21.
issues.
Our work in that area ~ included development of 22 inspection and repair techniques and then the inspection of 23 our most susceptible units.
24 We have an ongoing program'to inspect in-service 25 control rod drives.
The effort there is to measure wear on
(
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034
50 1
those dri.ves and see if we can't extend the life expectancy 2
of those existing drives.
3 We've been systematically in our materials 4
committee reviewing our reactor coolant alloy 600 materials.
5 Our core performance committee has regular ongoing 6
projects to review spent fuel, looking for the effects of 7
swelling, wear, corrosion on those fuel assemblies.
8 Our operation support committee has been reviewing 9
generic emergency operating procedure guidance, and where 10 our various utilities may have a need to deviate from that 11 guidance, we've been working through an effort to minimize 12 the need for any deviations.
13 And as part of our steam generator life management 14 efforts, our chemistry committee has a project that they've 15 been reviewing and working on that's looking at the 16 capabilities of titanium injections to delay or stop tube 17 degradation.
We have injected titanium in two of our 18 generators, two of our utilities' generators.
19 Next slide, please.
'20 At this point, I'll review just a few of -- a 21 couple of our issues that we consider successes in the B&W 22 owners group.
23 One such effort was our response to the Prairie 24 Island partial length control rod housing cracking issue.
25 Unlike Westinghouse that just has a few rods with those ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034 l
51
~1
_similar weld metals, all of our drives have similar welds.
2' Our plan there inspected a statistically 3
significant number of the plant motor tubes.
We also did 4
extensive reviews of our material and construction data.
5 From those inspections and those reviews, we
'6 -
completed a preliminary safety assessment and have submitted 7
a topical; report that indicates we're safe in that arena.
8-We found no cracking similar to Prairie-Island, and we did 9-review the results of our. work and findings with the staff.
15 Next slide, please.
11 In response to international issues relative to 12 reactor vessel bolting problems, we completed preliminary 13 safety acsessment that showed that our design differences 14 and lower bolt stresses eliminated immediate safety concern.
15 We have put in place a six-year project to 16 continue to look into this issue.
That project includes the 17 identification of inspection,-repair, and replacement 18 techniques, and materiale that could be used in that arena.
e i
19 We're also continuing to evaluate radiation i
20.
assisted stress corrosion cracking issues,-and our project 21 also includes development of plans for potential internal i
22 inspections down the road.
23 We also presented that information to the NRC 24 staff.
l 25 Last slide, please.
i ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 i
Washington, D.C.
20036 1
(202) 842-0034 1
-. ~... - - _,. -.. -
52 1
The last recent effort to discuss was our generic 2
. license. renewal efforts.
This was a joint effort to support r
i 3
member potential applications.
Initially, four of our five 2
utilities funded this project.
We still have three of those
.{
5 five supporting it.
f 6
As I mentioned earlier, we did submit our first I
.7 application in July,.when the Oconee submittal was'made, and i
8 our effort, as we discussed,-develop generic topical reports
[
9
'that could be. referenced by member utilities.
10 I've listed those topical reports and their status i
11 currently.
12 This concludes my portion of the presentation, l
13 Chairman, in support of B&W efforts.
At this time, I'll e
14 turn it over to Tom Rausch for the boiling water reactors.
l
[
15 MR. RAUSCH:
Thank you, Bill.
16 Well, it's certainly my pleasure to be here today.
l 17 I have been'very heavily involved in the BWR owners group E
i 1L8 for about 10 years, starting as the chairman of a large t
-19 committee, then as my company's representative -- that's f
20 Commonwealth Edison -- and now, recently as chairman of the I
'21 owners group.
i
-22 I'm a strong believer in the value of the owners 23
- group to both us and to the NRC.
24.
Could I have the organization slide?
f 25 I'm not going to dwell on organization other than i
i ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 i
Washington, D.C. 20036 (202) 842-0034 h
~
,g l
53 1
to say that we are from different outstanding working groups 1
2 or subcommittees.
The big box at the bottom is really where 3-all our action is, i
4 Each activity is separately managed and funded.
5
.The net result is similar to the PWRs, and we have a large 6
number of people involved, since each of our 45 or so
)
7 efforts has its own roster.
l 8
Also, as much as I'd like to take credit for all i
9-the glowing words Brian has had for the PWR vessel internals
- 10 project, it is a separate organization.
We are awfully 11 close.
12 For a lot of reasons, it was decided to fund it
)
13 separately and manage it separately, although there is a 14 very large overlap in the executive leadership, so that we 15 come from similar molds.
16
-Next slide, please.
17 We have a particularly active executive oversight 18 committee that's a subgroup of the executive's.
19 They help to ensure that our priorities stay 20 aligned with what the-owners need, and.when you look at the 21 list of activities, which I won't have time to talk about in 22 much detail, you'll see that many of our priorities are key 23 NRC issue, as well.
24 The BWR fleet is somewhat heterogenous.
Very 25 early, we evolved into an organization that works both on ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034
54 l
I what we call a generic basis, where everybody participates, 2
and on a cafeteria basis, which is even more common in our 3
own risk group.
4 CHAIRMAN JACKSON:
Now, when you say 5
participation, you mean in industry initiatives?
6 MR. RAUSCH:
Means in owners group activities.
We 7
may have an activity that involves five owners, all who have 8
the same type of containment, and the other 15 or 16 owners 9
don't have anything to do with it.
i 10 CHAIRMAN JACKSON:
I understand that, but'I'm 11 talking more relative to generic issues.
12 MR. RAUSCH:
To generic issues, everybody 13 participates.
The rules don't allow -- there's a voting 14 criteria.
Three-quarters vote on a new effort, and 15 everybody has to participate.
16 So, our approach is a very flexible organization, 17 since we're very specific to the issue, and it's very 18 executive-driven.
19 Next slide, please.
20 Now, I've somewhat artificially just separated the
~
i 21 issues into categories just to help go through them, but 22 they really -- we really don't bin our activities.
t 23 This just gives you an idea of what we've been 24 working on.
I'll highlight just a few of these.
There's 25 too many to talk about all'of them.
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034 l.
.=
55 1
The regulatory issues are perhaps what we're best 2
known for, but as you can see, there's a number of other 3
activities which are aimed at improving safety, sharing 4
information, or reducing costs.
5
. Examples in this category range from developing 6.
optimum outage schedules to preparing guidelines for 7
reactivity management at a site.
8 The first three regulatory issues we've already 9
discussed somewhat.
They're all interrelated -- suction 10 strainers, NPSH, and containment coatings.
11 We've worked closely with the staff on all of 12 these issues, as well as with~NEI and the PWRs, where 13 appropriate, and we view resolution of the suction strainers 14 as a success story'and as appropriate frequent open 15 communication with'the staff, really at various phases of 16 the issue, without which we don't think we would have been 17 successful.
18 CHAIRMAN JACKSON:
Before you go, what do you mean by integrated risk-based regulation, and how does that play 19 20 off against the NEI initiative to revise the regulations to 21 be more risk-informed?
22 MR. RAUSCH:
It's pretty much a good example of 23 how the NEI initiative w'ould be of global importance to the 24 light-wLter industry, light-water reactor industry, and our 25 owners group committee -- its leader is a member of that ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034
4 56 1
task force, and so, what we do is -- it's kind of like a 2
seamless transition from the industry's perspective and then 3
take it down to a more technical level on the boiling water 4
reactors.
5 That committee really has a large number of 6
efforts it's done.
One example would have been -- was on 7
MOV 89-10 issues.
8 CHAIRMAN JACKSON:
I'm really talking about, with 9
risk-based, do you mean purely PRA-driven?
10 MR. RAUSCH:
Yes.
11 CHAIRMAN JACKSON:
I see.
12 MR. RAUSCH:
They worked with NEI.
13 CHAIRMAN JACKSON:
Okay.
So then that takes me to 14 PSA certification.
15 MR. RAUSCH:
We are the initiators of that.
16 CHAIRMAN JACKSON:
And you're working with ASME on 17 PSA certification?
18 MR. RAUSCH:
We've communicated with them.
I'm 19 not real familiar with the effort.
20 MR. SHERON:
ASME is developing the PRA guide.
l 21 Certification, though, I think is strictly a 22 utility-industry effort.
j 23 CHAIRMAN JACKSON:
Okay.
24 COMMISSIONER DIAZ:
Could you comment, then, on 25 license renewal?
1 l
l l
l ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 l
Washington, D.C. 20036 (202) 842-0034
s 57 1
MR. RAUSCH:
We've had varying degrees of activity 2
in license renewal.
We were very actively funded several 3
years ago, and you asked about impact of deregulation.
4 Right about that time, the budget pressures and number of utilities who felt that they were not going to run 60 years 5
6 led us to turning it into what we call a cafeteria effort as
)
7 opposed to a generic effort.
It's been scaled down quite a 8
bit..
9 Although the vessel internals project is still 10 very important, it's very generic, and we do work with that, 11 also with EPRI, and we do have some generic topicals, but 12 we're not at the same scale of effort as some of the other 13 owners groups.
14 Could I have the next slide, please?
15 This slide simply illustrates a little bit of 16 other types of activities we're involved in.
Both materials i
17 items listed involve obtaining inspection relief.
18 CHAIRMAN JACKSON:
Well, you know our thrust is 19 risk-informed regulation --
20 MR. RAUSCH:
Yes.
21 CHAIRMAN JACKSON:
-- not risk-based regulation, l
22 MR. RAUSCH:
And unfortunately I can't change the 23 title of the committee.
I can ask them to change it.
24 The reason we have a smaller number of materials 25 issues -- pardon?
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
4 58 i
1 CHAIRMAN JACKSON:
You should consider that.
2 MR. RAUSCH:
Yes, we should.
3 The vessel internals project really handles most 4
of the materials issues.
5 The boilers are -- the first two issues listed 6~
there are very important, improve water chemistry and 7
hydrogen addition.
We're looking for some relief in i
8-inspection frequency, and we're working well with the staff
]
9 on that, as well as on the second issue, due to improved UT 1
10 techniques.
11 Briefly mention the year 2000 program.
GE is 12 working lwith us to identify all potentially susceptible j
l 13 equipment they've ever delivered to every licensee and f
14 providing an initial assessment of Y2K readiness.
That's' j
15 kind of' accelerating owners efforts and providing like a QA i
I 16 check on their own assessment.
l 17
. CHAIRMAN JACKSON:
From the NSSS perspective, do l
18 you have some sense in terms of bounding'the problem?
How 19 big an. issue is it and how much in the way of resources do I
i
~
20 you think will be required to resolve the issue?
l 21 MR. RAUSCH:
It's a big issue in the sense of it 22 does take a lot of resources.to make sure we don't have a I
23 problem.
I'm not aware of very many plant hardware embedded 24 circuit-type issues that have arisen on the boiler side.
l
.25 The ones we have looked at have been benign.
l I
I l
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 l
(202) 842-0034
f 59 i
i 1
CHAIRMAN JACKSON:
Have all the assessments been l
l 2
completed?
I l
3-MR. RAUSCH:
No.
The utilities are in a varying l
1 4
range of completion on assessments, but I think -- we just 5
had an NEI-joint owners group meeting yesterday, and.I can't l
6 recall the-figure, but by the end of the year, it will be 7
very high -- high fraction of assessments will have been
(
8 completed.
l 9
CHAIRMAN JACKSON:
All'right.
Because you know 10 the NRC is, in fact, beginning tiJpections of that area.
11 MR. RAUSCH:
Right.
I think our Byron Station and 12
-our Braitwood Station is4x2 the list.
13 CHAIRMAN JACKSON:
And the issue of embedded --
14 MR. RAUSCH:
Yes.
15 CHAIRMAN JACKSON:
-- chips and tha' kind of thing 16 is -- has a high Congressional focus, 17 MR..RAUSCH:
Yes.
I. don't want -- I certainly 18 can't trivialize the issue, because you have to go way down 19 to the chip level --
20 CHAIRMAN JACKSON:
Right.
21 MR RAUSCH:
-- make sure you have it 22 characterized.
23 CHAIRMAN JACKSON:
Well, that's why it's important 24
-- I mean -- and you know, you kind of answered it quickly, 25 but the issue of how far along you are in doing assessments, 1
ANN RILEY & ASSOCIATES, LTD.
Court Reporters i-1025 Connecticut Avenue, NW, Suite 1014 I
Washington, D.C. 20036 (202) 842-0034
60 1
and it's not just for.you --
2 MR. RAUSCH:
Right.
3 CHAIRMAN JACKSON:
-- it's for, you know, all of 4
the -- can you tell me how far along the assessments are?
5 MR. RAUSCH:
Alex Marion is here from NEI.
6 Do you recall, Alex?
i
'7 By the end of the year, 80-percent complete.
8 CHAIRMAN JACKSON:
And that is for assessment.
l 9
MR. RAUSCH:
Yes.
[
10 CHAIRMAN JACKSON:
Is there an integrated approach 11 for what happens then, based on what you find?
f 12 MR. RAUSCH:
You go into the next phase.
I mean 13 there's testing and re-radiation, depending on what the j
14' assessment was, if you have a lot of items that need to be 15 be further tested or --
16 CHAIRMAN JACKSON:
I understand the process, l
17 because we go through it ourselves as an agency.
The f
18 question really becomes, you know, what the planning is in 19 terms of knowing how good or how bad your situation is, what 20 your contingency planning is.
f 21 MR. RAUSCH:
All I can say is what the industry --
i 22 what I'm aware of, what we're doing, and both us, NEI, and 23 EPRI are fulfilling an information sharing role, and in the 24 area of standards, I know we have plans to address i
25 contingency planning at the BWR owners group just from the ANN RILEY & ASSOCIATES, LTD.
j Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 l
Washington, D.C. 20036 (202) 842-0034 i
, = -
l
- _. _ -...~,.
e i
61 1
standpoint of what others are doing to end up with a better f
2 product.
T 3
So, beyond that, I know the EPRI effort is f
4 massive.
I think 600 people were at the last workshop.
I 5
think that was the number.
l 6
CHAIRMAN JACKSON:
Okay.
7 MR. RAUSCH:
I'm going to mention just one other j
8 issue on this slide.
9 Design basis issues is an example of where an 10 owners group can complement NEI activities, in this case 11 taking NEI 97-04, which is their document intended to 12 substantially clarify 50.2 down to more level of detail, and 13 then our effort, which is somewhat new, is to take it to 14 another further level of detail for BWRs.
15 There's room to -- the more precise we can be and 16 consistent we can be in what exactly is design basis and 17 what.isn't, I.think it's good for all of us.
It's an issue 18 affecting everything from operability and reportability to 19 50.59.
20 Next slide, please.
21 Certainly suction strainers and related activities 22 have been discussed enough.
It belongs high on the list of 23 recent successes, and I won't discuss it further.
24 The next bullet, briefly, we have a joint owners 25 group effort on motor-operated valve period verification.
i ANN RILEY & ASSOCIATES, LTD.
Court Reporters I
1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
i 62 1
1 You may be aware of it.
This is a real good example of how i
2 owners groups can' work with the NRC.and with each other, f
i 3
We have a high percentage of owners involved in --
4 of all the light-water reactors, addressing Generic Letter 5
96-05.
i 6
In this case what we're doing is having -- sharing
[
7 test burdens.
A lot of testing involved.
By using 37 l
8 utilities and 94 units, we dramatically reduce individual l
T 9'
owner testing requirements and adding a high degree of 10 consistency to what testing is done.
11 So, this is a very good example of a win-win 12 situation, 13 We've already briefly talked about PSA 14 certification.
15' Next slide?
I i
16 Bill's already mentioned the joint owners group 17 efforts on the AOVs.
I like to list it as a success story l
18 primarily because all four owners groups are working 19 together from the very beginning of the issue.
20 We couldn't tell for sure if this is the first 21 time this has ever been done, but it's certainly the first i
22 time in recent memory that the four owners groups are t
'23 actually tackling a concern from the very beginning.
24 In this case, we're using operating experience, 25 and we. intend to proactively define a utility program.
We ANN RILEY & ASSOCIATES, LTD.
5 Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 i
Washington, D.C.
20036 (202) 842-0034
._m_-
l 63 i
intend to share the results with the NRC and believe that we 1
(
l 2
can end up with a very high-quality effort without a lot of 3
effort on the staff's point.
{
4 The other examples listed here go back in time 5
somewhat.
They range ~from the regulatory response group on 6
sticking pilot valve diaphragms to stability and accident 7
management guidelines.
So, as you'd like, we can talk about i
8 these later.
9 Any questions?
10 CHAIRMAN JACKSON:
Well, actually, questions as we 11 go along.
12 MR. RAUSCH:
Sure.
13 CHAIRMAN JACKSON:
What value in tenns of risk 14 reduction do you believe the severe accident management 15 guidelines.have had?
16 MR. RAUSCH:
I don't think the owners -- at least 17 our owners group -- I don't think we've ever really come up 18 with a position on that.
I'd have to give you a personal 19 one.
.20 I know, from what I've heard of people on the 21 implementing side, there is some -- a little bit of 22 frustration since the boiling waters reactors already had 23 EOPs that transcended design basis accidents.
So, there's 24 frustration that we're going even fu'rther out into very 25 low-frequency events.
l ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 t
Washington, D.C, 20036 (202) 842-0034
64
~1 But other than that, you know, I think there's 2
definitely improvement, particularly organizationally.
3 Again, I don't think we have a real position on that.
4 Any other owners groups?
5 MR. LIBERATORI:
I guess I would offer that, you 6
know, we've learned a lot since TMI.
7 The state of knowledge of core degradation 8
progression and so forth is much more well-known now, 9
obviously, than it was then, and I think what we've done 10 here is taken what we've learned and put it in a framework 11 that could be used, you know, should such a situation arise.
12 So, it's captured, it's organized, it can be used 13 by utility emergency planning organizations should the 14 situation arise.
15 CHAIRMAN JACKSON:
So that's the sense in which 16 it's a success.
Okay.
17 MR. LIBERATORI:
It's when you've gotten to the 18 last EOP and it hasn't worked, what do you-turn to next?
19 You go here.
20 CHAIRMAN JACKSON:
Right.
Okay.
Thank you.
21 MR. RAUSCH:
Next slide, please.
22 I'd like to close with this issue, high-exposure 23 channel bow, simply because it's a good example of how we 24 can reduce the impact of an issue or how the owners group 25 can reduce the impact of an issue both to ourselves and to ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034
65 1
the staff.
2 Recently, a boiling water reactor experienced 3
degradation in scram time performance, and it's just a 4
single drive.
5 During the refueling outage, they noticed visibly 6
evident channel bow on one assembly.
It turned out to be a 7
high-exposure assembly in that same cell that the control 8
blade was slow.
9 They were able to detect it well before any safety 10 significance, in this case because they were still well 11 within the tech spec scram time, but the had been 12 conservative and disarmed the valves in that drive and left 13 the rod inserted anyway.
14 But where we came in is GE had performed an 15 initial assessment, communicating the results to all the 16 owners and to the NRC, and when the staff started reviewing 17 it, they had a lot of questions.
18 They called me and asked questions related to the-19 impact on the fleet and the safety significance, and between 20 the owners group and GE, we were able to very rapidly answer 21 the questions and develop a mc'nitoring program.
In fact, we
'22 did it inside of two weeks.
23 CHAIRMAN JACKSON:
Was this handled through the 24 regulatory response group?
25 MR. RAUSCH:
No, it wasn't.
I think the level of ANN RILEY & A % OCIATES, LTD.
Court keporters 1025 Connecticu*, Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034 1
1 l
\\
66 1
concern was -- probably wasn't there, but it was -- I'm not 2
sure where it fell on the threshold.
I think, absent our 3
information, it may have.
4 MR. SHERON:
I don't profess to know back when, 5
you know, exactly what prompted the staff to just, you know, 6
contact the owners group directly versus direct response, 7
but my guess is, as Tom said, it didn't reach the threshold 8
where we would consider activating the RRG.
9 CHAIRMAN JACKSON:
I see.
Okay.
i 10 MR. RAUSCH:
I think, early en, we knew it was a i
11 small subset of channels that were susceptible, but exactly 12 how wide that was wasn't known.
13 CHAIRMAN JACKSON:
Very good.
14 MR. RAUSCH:
That's it with this.
15 I'd like to introduce Dave Pilmer, CE owners 16 group.
i 17 MR. PILMER:
Thank you, Tom.
18 I work for Southern California Edison and the San 19 Onofre Nuclear Gen 3 rating Station.
I've been chairman of 20 the CE owners group for the past two-and-a-half years.
21 The CE owners group consists domestically of eight i
22 utility members.
We have 14 operating units.
A recent 23 defector of our group was' Maine Yankee.
24 I'd like to draw your attention to the 25 organization chart.
I'm not going to dwell on this, because I
e ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
67 it follows a description that you've already heard twice 1
2 now.
[
3 I would point out that we have 14 functional areas 4
depicted in the boxes under there.
I'm going to refer to 5
those as subcommittees, even though you'll see three I
6 different terminologies used, t
7 The subcommittee term usually refers to a standing
[
8 or permanent organization with a functional interest as l
9 shown by the name.
The working groups and the task forces 10 are more narrowly focused and come into existence and go out 11 of existence when their function has been served.
12 I would also -- to give you a flavor of what 13 owners groups are really abouti I would point out that, of 14 the 14 boxes you see there, four of those are aligned with 15 the station direct line functions, whereas the other 10 I 16 would characterize as being engineering support functions, 17 the point being that this owners group -- and I think it's 18 fair to say the others, too -- are primarily an engineering 19 suppcrt organization.
i 20 Let me run through a few of the selected 21 activities of the CE owners group.
22 The first bullet you see there refers to steam 23 generators, and let me comment that we have tried to focus 24 our activities in terms of what we call strategic issues.
25 The number one strategic issue that our owners group faces f
^
t ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 r
(202) 842-0034-
68 1
is steam generators and the management of' steam generators f
2 and their preservation.
3 The first task you see there is quite a large one.
4 It involves developing an alternative repair criteria to
-5 deal with axial tube crack indications.
6 I believe it's fair to say that the practice in --
i 7
amongst the CE' plants is that any indication, no matter how 8
slight, results in the tube being plugged for lack of any i
9 definitive alternate repair criteria or regulatory approved 10 means of keeping cracks in service.
j 11 I'm going to come back and mention some other l
12 steam generator activities which are not -- which have been 13 completed.
The selected activities I'm talking about now l
t 14
'are work in progress.
j 15 The second one -- since we're irreverently 16 referred to risk-based products -- you can see, I still use 17 that term, also.
18 CHAIRMAN JACKSON:
You can have risk-based 19 products.
I'm just saying that we talk about risk-informed
(
l 20 regulation.
i-i i
21 MR. PILMER:
Risk-based products are the basis for l
22 which we can make risk-informed decisions.
l 23' CHAIRMAN JACKSON:
They're used in risk-informed 24 decision-making.
25 MR. PILMER:
I still get it wrong.
I t
i ANN RILEY & ASSOCIATES, LTD.
Court Reporters
[
1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034 k
o 69 1
CHAIRMAN JACKSON:
We'll keep working at it, j
2 COMMISSIONER McGAFFIGAN:
Talk to your lawyers.
i j
3-CHAIRMAN JACKSON:
That's right.
Talk to your i
4 lawyers.
That's right.
And our lawyers.
5 MR. PILMER:
The first I'd like to mention are 6
revisions to our technical specifications dealing with 7
allowed outage times, and I'm happy to say that we have, for 8
our pilot plant or our lead plant, approval now for the 9
first two on this list, which deals with taking a 10 low-pressure safety injection and the safety injection tanks 11 out of service longer than the standard period of time.
12 In all of these cases, I would point out that the 13 risk assessments performed indicate that taking them out of 14 service in mode one for a longer period of time is a safer 15 course of action than to drive the plant to a mode five 16 shutdown to affect the action that would be indicated.
17 We have pending, nearing completion, one on 18 emergency diesel generators, and in an earlier stage of 19 review, high-pressure safety injection and containment spray 20 pumps.
21 As part and parcel of that, we have, through the 22 owners group, developed a configuration risk management 23 program, guidelines to apply to our members and which has 24 been shared with the industry for -- which I think will be 25 valuable as others proceed in this area, as well.
ANN RILEY & ASSOCIATES, LTD.
Court Reporters i
1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C 20036 (202) 842-3034 4
70 1
And I don't know if I agree with -- I guess I 1
2 agree with Tom that they started the certification program, 3
we picked up that idea, but we've been working on it for 4
quite some time, at least two years, and it has revealed a 5
lot of valuable insights as to how various people do IPEs i
6 and IPEEEs, their risk assessments.
7 I think that the product of this will provide a B
great deal of credibility and value to the whole area of 9
risk assessment.
10 I won't say anything more about sump strainer 11 performance.
It's been mentioned quite at length.
12 Going on to the next slide, we have an active 13 program within our owners group to -- improving plant 14 performance in the areas of plant unreliability and 15 equipment failures, to identify these contributors and to 16 improve our plant performance.
17 Needless to say, it's both from a safety 18 perspective as well as economic that one wants to have a 19 high quality of operations and to avoid forced outages.
20 CHAIRMAN JACKSON:
What have you identified?
Or 21 let me put it this way, not that you need to give me some 22 enumeration, but when you've identified the largest 23 contributors to plant unreliability and equipment failures, 24 how do those contributors play off against the assumptions 25 in the IPEs for CE PWRs?
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
71 l
1~
MR. PILMER:
Well, there is a link there, but I am 2
not. aware that we have-identified that would indicate a 3
shortcoming on the IPEs.
4 These are more of the practical things that lead 5
to improving plant availability, and as far as I know, they 6
are consistent with assumptions on --
7 CHAIRMAN JACKSON:
But have you done an explicit 8
playoff of one --
9 MR. PILMER:.Really, that's not the focus.
10 CHAIRMAN JACKSON:
No, I understand that.
Okay.
11 So, that's not the focus, but perhaps -- I mean that is a 12 useful activity, because if one has PSAs that are predicated 13 on certain assumptions that, you knot *, identify these as 14 part of a risk assessment --
15 MR. PILMER:
Yes, that it. good link and, I 16 think, a useful thing to do.
17 CHAIRMAN JACKSON: 'Right.
18 MR. PILMER:
I agree.
J 19 The focus of this, of course, is to find out where 20 we have problem equipment or processes or procedures and to.
21 improve them, to get the reliability up.
22 CHAIRMAN JACKSON:
Yes.
23 COMMISSIONER McGAFFIGAN:
Could I address a 24 question that is on this point, at least peripherally'.
25 Maybe others could answer'it, as well.
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C 20036 l
(202) 842-0034
a 72 1
There was a little excerpt in Nuclear News Flashes 2
yesterday that said only 20 -- the NRC employee talking is 3
Dale Rasmussen -- only 20 utilities so far have signed up to 4
use a failure database NRC has collected.
NRC queried 5
utilities of their interest early last month via 6
administrative letter.
The database covers '80 to '95, 7
includes events from LERs and in PRDs, etcetera.
Rasmussen 8
said NRC would like to expand the availability of the 9
database but has not worked out the details for sharing 10 partially proprietary information.
11 Where does this stand?
I'm not sure whether I 12 should ask Brian or you all.
Were we expecting a larger 13 reply than 20 utilities?
It's on the issue of sharing a 14 failure database that we have compiled.
15 MR. SHERON:
Well, the database was developed by 16 EEOD.
17 COMMISSIONER McGAFFIGAN:
Right.
i 18 MR. SHERON:
Mr. Rasmussen works there.
19 I'm not that familiar with it.
I think, on the 20 one meeting I did have, I think the expectation was, is that
)
21 we would probably get a lot more subscribers, you might say, 22 to use it in terms of its value.
23 COMMISSIONER McGAFFIGAN:
And do any of the owners 24 group folks have any indication as to why people aren't.
25 signing up for this database?
i ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
a 73 1
MR. LIBERATORI:
I don't have information to 2
respond right now.
3 COMMISSIONER McGAFFIGAN:
Okay.
4 MR. PILMER:
I think, in that scenario, we'll 5
always be glad as an owners group to communicate with the 6
staff what the view is of our members, j
7 COMMISSIONER McGAFFIGAN:
I don't know how much j
8 we're charging.
Maybe we're charging a fortune, too.
l 9
MR. PILMER:
I'm not personally familiar with it.
10 I do understand that we make use of some other commercial i
11 failure database.
i 12 I'd like to make one remark about Y2K readiness.
13 The owners group -- our owners group has a project that looks at all of the digital equipment supplied by -- as part 14 15 of the NSSS for all of our members.
16 It's gone to the preliminary assessment.
It's 17 practically complete with a detailed assessment, and it's my 18 understanding we expect to be -- at least for that part, the 19 NSSS-supplied equipment, we expect to be complete by the end 20 of this year with respect to both identifying any required 21 testing or remedial measures to be taken.
22 The next one, I think, is worthy of attention 23 here, and that is an outage readiness peer review program 24 that we have initiated, where we take some of our members 25 and experts in the outage planning process and we go to the l
l ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034 l
74 1
-- each of our other member plants a few months before they 2
begin an outage.
3 We perform a readiness review.
This gets down to 4'
the nuts and bolts of performing outages and sharing 5-experiences, and it's been very valuable in improving the 6
efficiency of our outages.
7 I am going to mention another one later about 8
dealing with -- let me put it this way.
We're going to do 9
similar things in the area of plant performance and design 10 basis issues, as well, to help our members in a similar 11.
fashion.
12 They're not developed enough for me to report on 13 at this time.
14 You've already heard much here, I think, about the 15 ASME programs on risk-infomed IST/ISI.
We are part of 16 that, as well.
In fact, one of our' members is the pilot 17 program in the -- of the EPRI program, and other activities 18
-include the implementation of the improved standard 1
19 technical specifications.
20 We currently have two of our members, two out of 21 eight, that have implemented the improved standard tech 22 specs, and.there are others nearing that point of 23.
implementation.
24 So,'those are examples of work in progress by'our 1
25 owners. group, and in terms of things that are largely L
ANN RILEY & ASSOCIATES, LTD.
j.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034 l
l
. - -. - - - _ - ~..
=
l 75 1
complete that I'm going to label successes here, to begin 2
with are the emergency procedure guidelines that were an 3'
outgrowth of the TMI action plan.
4 Initially, the Commission required that emergency I
5 procedures be submitted for review and approval by the NRC 6
staff.
That was back in the early '80s.
What that actually 7
ended up with was approval of NSSS generic emergency 8
procedure guidelines.
9 But the work did not stop there, and I think we 1
10 can be proud of the fact that, through experience and 11 emergency exercises and new insights into failure modes and l
12 so forth, these emergency procedures guidelines that were 1
13 originally approved more than 10 years ago have undergone an 14 order of magnitude improvement based upon that experience.
15 So, they're at a very high degree of development 16 at this time.
17 We continue to make improvements; We do not 18 continue to ask for the NRC to review these.
There's no j
i 19 requirement for that, and given your resources, probably, 20 wouldn't merit it anyway.
21 We do provide them, though, for information to 22 staff, so that we keep the staff up to date as to where we 23 stand with these.
24 And secondly, the severe accident management I
25 guidelines, which is an owners group product and is out t
i ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 l
(202) 842-0034 l
76 1
there for all of our members, as'far as I know, being
)
2 complied with by all our members, for. implementation by the i
3 end of this year, which is the basic time schedule.
i 4
I'm going to jump down to the last one here on 5
steam generator management.
6 We have an in situ pressure testing guidelines 7
which has been valuable in understanding the nature of eddy 8
current indications and whether or not these constitute j
9 unstable cracks or not.
i 10 By the way, we do in situ pressure testing where i
11 we have a crack indication.
As I already indicated, all of 12 those tubes get plugged, however they go through testing to i
13 show that the analysis by the -- done for those indications 14 is valid.
(
15 The last'two items are related.
We have an 16 extensive eddy current flaw library and steam generator i
17 defect database; and these are specific to the CE design 18 steam generators.
They wouldn't be applicable to the other i
19 PWRs.
t 20 And finally, on the generic material integrity 21 concerns, the alloy 600 reactor vessel head penetrations, I i
22 think that we've been agreeable to providing information to i
23 the staff.
We've even included susceptibility ranking for 24 the CE plants anyway.
25 We've had one plant that's undergone a l
i ANN RILEY & ASSOCIATES, LTD.
{
Court Reporters i
1025 Connecticut Avenue, NW, Suite 1014 l
Washington, D.C. 20036
[
(202) 842-0034 i.
.. -. - ~.. - -.. ~. - -.
s-
_yy l'
comprehensive inspection of the head nozzles.
That was our v
2
.most highly susceptible-plant.
3
'We have another plant that underwent-a partial
-4_
' inspection, and we'have a third plant, also high on the-i.-
5 susceptibility ranking, scheduled to undergo complete 6
inspection by the middle of'nset year.
-7.
And what we have seen so'far,'all the information 8
available to us'does not. indicate that there's any real 19 safety concern.
10:
Last, I'm going to mention here the reactor vessel.
4 11 work.that we have done.
This work has been focused on weld 12 materials and properties.
As I already mentioned, there are 13:
53 of the commercial vessels in this country.that were 14 constructed by Combustion Engineering, 15 So,'our working group on this includes many 16
. utilities.which are not_ members.of the CE owners group but 17' own a CE vessel.
18 The nature of the work was to gather all available 19 weld chemistry data from many sources that were not'known, 20 certainly to the NRC, to have existed, but we have found 21 extensive new data, and these have been used to improve the 22 characterization, draw confidence intervals on our knowledge 23 of the copper and nickel content for those welds.
24 CHAIRMAN JACKSON:
Do the ' coupons have the same 25 content?
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202)'842-0034
78 t
t 1
MR. PILMER:.The coupons are_well within~the i
2 tolerance of the data that's known.
The weld chemistry 3'
includes.the coupons.
4 Now, the coupons are made from the same material 5
.They're made at-the same time that the welds are put in 6
place.
[
7 But.from'one part of -- as we found out, one 8
sample of the same -- five samples of the same weld, they 9
don't give precisely the same data on chemistry content.
10 But they are statistically bounded, and the coupons are i
11 included in there.
.12 I think your earlier comment about'the 13 representativeness of coupons refers more to.the uncertainty I
14:
on the fluence applied to those coupons, i
15 The fluence is calculated, and it's different from 16 the fluence at the. vessel well, and of course, the coupons l
17 are closer and experience' higher fluence in the vessel, so i
18 that there's an adjustment made to that.
19 CHAIRMAN JACKSON:
Well, there is also a question 20
-- and, you know, this is not to get into a technical 21 debate, but the vessel itself has stresses on it that the 22 coupon does not.
23
-MR. PILMER:
Very true, yes.
24 CHAIRMAN JACKSON:
Okay.
25 MR. PILMER:
The owners group program on this has ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034
0 79 1
been -- dealt with the issue of variability of the chemistry 2
in the weld material.
3 That's been the focus of our task, and that's 1
4 complete now, and I believe that the staff is pleased with 5
the information we have developed on that.
It resolves some 6
very important problems indicated where there appeared to be 7
high variability in these weld materials, and I think we B
have the best knowledge we can have at this point in time on 9
that variability.
10 CHAIRMAN JACKSON:
Tell me about the direct 11 measurement of fracture toughness.
12 MR. PILMER:
Well, that is a -- the way 13 embrittlement is monitored today, we look at the shift in the sharpy data taken at a different energy level.than the 14 15 fracture toughness.
16 So, all I can say is that they're looking at 17 they have a research program in which these coupons 18 themselves would be the direct measurement of fracture 19 toughness, using a different measurement technique, and I i
20 regret to say I'm not a materials man, and so, I don't'know 21 the --
22 I would also point out that not all of our members 23 are participants in this work.
We have different distinct 24 classes of vessels out there.
25 We have everything ranging from -- one of the ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
c 80 1.
plants -- one of our members had directly participated in 2
the vessel anneaiing program because they anticipated 3
potential need for that for their vessel, all the way to --
4 and I'll name by name -- the Palo Verde vessel, which is the
-5 vessels which are good for 1,000 years.
6 So, theres not a lot of interest on their part in 7
pursuing this type of work.
8 That's also true of the San Onofre vessels, not 9
good for 1,000 years but well beyond any possible lifetime.
10 That completes my --
11 CHAIRMAN JACKSON:
What about the 22-day benchmark 12 outage?
13 MR. PILMER:
I'm trying to speed things along, and 14 that's -- this is an economic one.
15 We have an outage management working group, as you 16 could find on our organization chart.
They have exchanged 17 information.
They've worked on'the ideal outage, producing 18 a reference outage, and it is a 22 -- we call it a 22-day 19 benchmark outage.
20_
To that one adds other specific items of work
~21 that's not in that benchmark outage, but we think that we 22 can improve the efficiency of our outages, and I think the 23 operating experience data' indicates that the whole industry, 24 not just the CE fleet, are, indeed, making big strides in 25-that.
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034 1
~. _
4 81 1
CHAIRMAN JACKSON:
How much of a transfer of 2
activity to on-line maintenance does this require, and how 3
are risk assessments used?
4 MR. PILMER:
This benchmark outage does not depend 5
upon shifting work to on-line.
This is directed at improving the efficiency, eliminating the dead times during 6
7 outages, and to help people learn how to do a better 8
planning job.
9 CHAIRMAN JACKSON:
Okay.
Thank you.
10 MR. PILMER:
Thank you.
11 I'll turn it over now to Lou Liberatori from the 12 Westinghouse owners group.
13 MR'. LIBERATORI:
Thank you, Dave.
14 As Dave said, my name is Lou Liberatori.
I'm 15 currently employed by Consolidated Edison Company of New 16 York.
I've been associated with the owners group as a 17 primary representative for a number of years now.
I've been 18 chairman since the beginning of this year.
19 Could I have the organizational slide, please?
20 Let me just dwell here for a few moments.
21 You can contrast the owners group -- at least the 22 Westinghouse owners group organization with the BWR owners 23 group right now.
We have five standing subcommittees that 24 are aligned with functional areas -- analysis, licensing, 25 operations, materialc, systems and equipment engineering.
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034
\\
\\
'82
'l The large majority of our work tends to be
_ eneric, although we do have cafeteria-style options -- we
-2.
g 3
call them' subgroups -- where smaller groups of utilities can 4
group'together to perform work, but the majority of the 5-owners group work does tend to be generic.
6' We have 23 domestic utility members, and we have eight international members, plus Westinghouse, who is also 7
'8 La paying member of the owners group.
9 We require a three-quarter vote, as Tom mentioned 10 the boilers do.
'So, any program that makes it through the
'll-owners group has the approval of at least 18 utilities.
So, j
l 12 any product that comes out of the owners group has
. ide-range backing.
13 w
14 If you look at the organizational chart, we.have a 11 5
. steering committee that's elected 'by the primary
'16 representatives, we have ties to a full-time project office l
17.
within~ Westinghouse, we.have ties to an executive advisory 18 committee.
Every member has a single executive on that 19 committee.
They meet once a year with the steering 20 committee.
j 21-We also have a smaller subgroup, called the 22-executive management group, of five executives that meet 23
_ with the steering committee quarterly and provide core 24 direct input to us strategically in progress of the work we 25 have. going on.
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036
{
(202) 842-0034
--w s
J
83 1
If you look just below the steering committee box, 2
you'll see our regulatory response group, also issues review 3
group and potential issues core team.
All of those are 4
varying degrees with which the owners group handles emerging 5
issues.
6 Obviously, the RRG is the one that's been in place 7
since TMI, and these other functions have evolved over time 8
to deal with issues that don't warrant the attention that an 9
RRG activation would give.
10 So, we've built layers of ways of dealing with 11 emerging issues within the owners group, and that chairman 12 reports directly to the steering committee, ec :rou can see 13 on the chart.
14 We do have working groups, as some of tne other 15 owners groups do, that are either issue-specific or 16 functionally specific.
17 To the bottom right, we do have our, if you'll 18 excuse the title, risk-based technologies working group.
19 They function both in PSA peer-review type of work and also 20 provide consultation to the rest of the subcommittees and 5
21 working groups that may want risk-inforraed input into the 22 work that they're doing.
So, we utilize them sort of across 23 the board.
24 I'll go through some selected activities below.
I 25 won't touch base with all of them, but I'll mention some of ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034
i 84 l
r 1
them.that I think will be of interest.
j 2
We; at any time, have approximately 70 or so i'
3 active projects, again spread throughout the owners group 4.
organization.
I've listed some of the ones that are 5
regulatory related on the next two slides.
6 On the first slide there, the first couple of 7
issues are ones that evolve from plant experiences, things 8
that were discovered at other plants.
9' The part-length housing issue from Prairie Island 10 we've talked about before.
l 11 The high burn-up fuel was the reactivity insertion 12 accident issue that actually had its origins with some i
13 French experience, and the next one is the vessel head l
14 nozzle issue we've talked about.
15 All of those, the owners group is dealing with j
t' 16 internally as well as interacting with the rest of the i
17 industry on.
18 Moving down the list, shutdown regulations, we i
?
19 have a shutdown issues working group, if you noticed on the l
j 20 chart up there, that was involved in providing comments to l
l 21-the draft rules over the last few years, but also, I
I
[
22 internally, it gave us the opportunity to share best i
23 practices in terms of outage management, similar to some of i
24 the things that the CE owners group has done, and I'll 25 mention one particular product that came out of that on a f
t I
ANN RILEY & ASSOCIATES, LTD.
i Court Reporters i
1025 Connecticut Avenue, NW, Suite 1014 j
Washington, D.C.
20036 (202) 842-0034 i
-~
85 1
later slide.
i 2
We've looked at things.such as increased break l
3.
opening time for pipe rupture assumptions.
4 And the last one -- let me point out -- the core t
t 5
damage assessment methodology.
This is another one of those 6
issues that really hasn't been touched-since Three Mile 7
Island.
A lot has been learned; a lot of our thinking has 8
changed.
9 In fact,-some of this current thinking is being incorporated into the severe accident management guidelines 10 11 that all the utilities are implementing right now, and what 12 we did is basically submit -- this is one of our topicals we 13 have in to the staff, basically a revised core damage 14 assessment methodology based on the state of knowledge of 15 core damage progression to date.
16 At the top of the next slide, post-accident 17 sampling requirements, this is a nature followup that we 18 currently have working -- we have not submitted a report yet 19
.-- where we're actually taking the core damage assessment i
20 methodology as revised and are proposing changes to the 21 post-accident sampling requirements, or will propose, based 22 on what we think makes sense today based on where the core 23 damage assessment methodology understanding is.
24 The next several here are all projects that'we 25 have working 1.nternally but are interacting with the ANN RILEY & ASSOCIATES, LTD.
i Court-Reporterc 1025 Connecticut Avenue, NW, Suite 1014
)
Washington, D.C. 20036 (202) 842-0034
i 86 1
industry on.
2 We've mentioned the joint MOV program and some of i
3 the vessel integrity issues where we're feeding the industry 4
effort.
5 We've also had internal efforts on improved tech 6
specs and on addressing our piece, or the Westinghouse NSSS 7
vendor piece, of the steam generator internals degradation 8
issue and response to that generic letter.
9 And the last bullet on that slide, license i
10 renewal, as I touched on briefly earlier, we're in the fifth 11 year of license renewal mk within the owners group.
12 It has typically taken about 20 percent of our i
13 budget, so we've put a lot of time and effort into this, and 14 we've submitted the generic topical reports on key issues, 15 similar to the reports that Bill talked about earlier that 16 the B&W owners group has submitted, and I'll also mention 17 some products in a later slide that we have been able to use 18 right now.
19 So, there have been some benefits that apply today 20 from our license renewal work.
l 21 The next slide, please?
t 22 Some of these areas didn't start as regulatory 23 issues, so I categorized them as safety performance 24 enhancements.
25 Obviously, the risk-informed applications has ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034
87 1
evolved into a major industry and staff issue.
We have lead 2
plants for all of the various activities for the ISI and 3
IST, and we're working through the integrated industry i
4 effort without pilot plants.
)
5 In fact, Surry is the one that Brian was referring 6
to earlier that we're hoping to get the SER on by the end of 7
this year.
8 PSA peer review we also have a pilot effort on to
)
9 do such a review.
It's ongoing right now.
Our intent is to 10 use that as a -- to develop a metnodology for benchmarking 11 for the rest of our members to use for their PSA peer 12 reviews.
13 Baffle barrel bolting -- we affectionately call it i
14 BQ so we don't have to try to say that, but this is an item 15 that came out of license renewal as a start.
It was an 16 aging management concern that, when we looked at it, the 17 information told us it wasn't just a life extension issue 18 but it was also an issue that needed to be dealt with within 19 the current license dates of our members, and we put 20 together a very proactive program.
21 We went to our executives and got supplemental 22 funding to start this in a mid-year.
It's a multi-year 23 effort, on the order of three to four years, and millions of 24 dollars to address this.
25 We have lead plants that, this fall, we'll be ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034
88 1
inspecting and removing bolts, and the owners group is 2
funding hot cell work for those bolts so that we understand, 3
if_ cracking exists, what those mechanisms are, so that we 4
can compare that to the French experience, which is what 5
brought it to our attention in the first place.
6 So, we have a very active program, and again, 7
that's probably taking something on the order of 20 to 25 8
percent of our budget, as well.
9 We continue to support the EOPs on a generic 10 basis.
The ERGS, or the emergency response guidelines, are 11 the WOG generic version of the EOPs.
12 We have a maintenance program that's still ongoing 13 that allows utilities to feed back questions of any nature 14 at any time.
We've revised our EOPs probably on the order 15 of three or four times over the 15 years that they've been 16 on the street..
17 So, we'are constantly evaluating and updating the 18 EOPs as information becomes available to us.
19 The last two items on that slide are just vessel 20 integrity materials chemistry issues, similar to what you've 21 heard from the other owners groups.
That's the Westinghouse 22 input to basically the industry efforts on those.
23 Next slide, please.
j 24 Here we have several what I'll call internal 25 initiatives.
l l
ANN RILEY & ASSOCIATES, LTD.
l Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034 l
89 1
Many of our owners wanted to get together and 2
discuss reactor coolant chemistry, and there was such 3
tremendous interest in it that we actually formed a working 4
group for it.
5 This is a case where many of the members felt that 6
they needed to share experiences, and we wanted to learn 7
best practices from others.
So, that's one of those 8
initiatives that we started on our own.
9 The GOTHIC shutdown model came out of our work 10 when we were looking at the -- actually commenting on the 11 shutdown rule.
12 We started comparing how people set down their 13 outages, how they determined decay heat, how they determined 14 at what points in the outage could you do certain things, i
15 such as drain-down to mid-loop operation and detention ahead 16 and things like that, and it looked like many utilities were 17 trying to develop their own way of calculating that or 18 simplifying that calculation, and we got together as an 19 owners group and actually developed a model for us to use, 20 you know, internally for our own use, for the shutdown risk i
21 studies.
22 So, this is a case where we took some of our 23 discretionary funding and developed a model that was useful 24 to us.
25 CHAIRMAN JACKSON:
The staff did a fairly 4
AJRI RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034 i
i l
90 1
extensive review of W-GOTHIC, the modified version, as part 2
of the AP600 review.
Have you been able to make use of any 3
of that in terms of any enhancements or updates to GUTHIC?
l 4
MR. LIBERATORI:
Well, we took the W-GOTHIC and I
5 modified it for shutdown purposes.
6 CHAIRMAN JACKSON:
Okay.
7 MR. LIBERATORI:
That's what we did here, 8
specifically for shutdown management.
9 Guide tube pin replacement -- this was the cracked 10 pin at Vogle, and the owners group funded some money in 11 there to assist in the determination of the cause and for 12 what the appropriate replacement material would be.
So, we 13 he' ped fund the plant-specific effort there and gained 14 generic benefit from it.
15 ASIX is a chip-based replacement model for the 16 protection systems, the cards and the protection system.
It 17 was a firm-ware option that the owners group -- that's still 18 an open program to develop replacement cards for the future, 19 as the older cards become obsolete.
i 20' Pressurized thermal transients -- this is another 21 case where we proactively went out and installed temperature 22 monitoring probes on several plants to determine the effects l
23 of startups and shutdowns on the pressurizer itself, to 24 develop additional operating procedure guidelines to reduce 25 the type of, you know, thermal stresses that the pressurizer ANN RILEY & ASSOCIATES, LTD.
Court Reporters i
1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 t
(202) 842-0034 l
91 1
. would see over the life of the plant.
2 So, those are some of the initiatives that we 3
started basically without, at least initially, regulatory 4
input.
5 Down on the recent successes slide, we talked 6
earlier about regulatory-response groups.
7 We've been activated twice in the last three 8
years.
i 9
The two issues were'the incomplete rod insertion 10 issue, which occurred at two of our plants, and the 11 part-length control rod drive weld defect issue, which 12 occurred at Prairie Island, which we talked about earlier.
13 In both of these cases, the regulatory response
(
14 group functioned as was originally envisioned.
TMI, I l
15 think, worked to both ourselves and the staff's advantage.
i 16 In the case of the incomplete rod insertion, we 17 did get an initial bulletin out to licensees on that issue.
18 However, the follow-up longer-term work that the utilities 19 did was able to allow staff.not to issue a supplement to 20 that~ bulletin, and right now, we're continuing to manage 21 this as an industry issue.
22 This, I would say, is-one of those issues that 23 staff is monitoring what we're doing.
24 The part-length control rod drive issue -- that's l
25 another is' sue that's currently still ongoing.
We've had i
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 1
(202) 842-0034
92 L
i i
1 several utilities remove the housings themselves for further i
2 examination.
3 We have other utilities do in situ non-destructive 4-examination of those, and we're still looking to the people l
5 that have these part-length rod housings to determine the 6
long-range plan.
We're still working with staff on thst.
7 But to date, staff has not had a generic communication or j
I j
8 seen the need to issue a generic communication on that 9
issue.
f 10 COMMISSIONER DIAZ:
I understand the staff had 11 some questions or problems with the part-length -- the way l
12 this was being resolved?
[
13 MR. LIBERATORI:
I would just categorize it as i
14 we're working with staff to determine, you'know, how many i
15 inspections are really needed to give both of us the level l
16 of confidence we need,.that this was a unique fabrication 17 defect and that it wasn't a random event.
18 CHAIRMAN JACKSON:
I hate to.do this to you, but j
19 we have a publicly-scheduled affirmation.
So, I'm going to 20 have to ask you to --
21 MR. LIBERATORI:
Sure.
i' 22
.Proactive management of baffle barrel bolts we
'l l
23 talked about earlier.
24 Why-don't we just go to the closing slide?
25 COMMISSIONER McGAFFIGAN:
Could I catch you before ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034
_ - _. ~ _...-
-.. _. ~ _..
l 93 l
1 you get to the closing slide?
l i
2 MK. LIBERATORI:
Sure.
3 COMMISSIONER McGAFFIGAN:
The 15 license renewal 4
generic technical reports -- have those all been submitted 5
to the staff?
6.
MR. LIBERATORI:
No.
7 COMMISSIONER McGAFFIGAN:
How many require review?
8 MR. LIBERATORI:
We had intended to submit five to 9
the staff, which we have, basically key ones -- reactor 10 vessel internals, pressurizer, RCS supports, class one 11 piping containment.
Those are the ones that we've submitted 12 to staff.
13 If we get agreement on the approaches in those 14 major issues, the other less complicated, more direct issues 15 would fall in place.
We see no need to have all of the 16 license renewal work we're doing at those levels to get 17 staff review.
18 COMMISSIONER McGAFFIGAN:
Are there anymore coming 19 other than those five?
20 MR. LIBERATORI:
No.
The five are all we have 21 planned to submit.
22 COMMISSIONER McGAFFIGAN:
Okay.
23 MR. LIBERATORI:
The closing slide, please?
24 CHAIRMAN JACKSON:
I didn't mean to keep you from 25 hitting some high points, if there were some others you ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034
94 1
wanted --
2 MR. LIBERATORI:
That's okay.
Oh, I'm sorry.
I 3
should back up to the vessel annealing.
You did ask a 4
question earlier.
5 We did have a window of opportunity there with the 6
Marble Hill reactor vessel, and Westing' house and Cooper Heat 7
and DOE had put funding in place to do that, but there was 8
still a shortfall in some funding.
9 So, the owners group stepped up, and I believe we 10 contributed something on the order of three-quarters of a 11 million dollars, and some individual utilities also provided 12 additional funding-so that we could go forward and actually 13 complete the effort.
14 So, the effort was completed.
I don't know that 15 we have a final report at this-tir.e, but we were able to get 16 it completed.
17 That was an issue where we felt that, generically, 18 we had the window of opportunity and it may be something 19 we'd need in the future.
So, we did step up and provide 20 funding.
21 CHAIRMAN JACKSON:
Do you plan to have a report?
22 MR. LIBERATORI:
Yes.
I think the issue is just 23 in the funding right now.
Okay.
I understand it was 24 issued.
We found the money.
25 CHAIRMAN JACKSON:
Thank you.
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C. 20036 (202) 842-0034
95 1
MR. LIBERATORI:
Okay.
So, I'd just like to 2
-provide some concluding remarks on behalf of all four owners 3
groups at this point.
4 The first observation I'd like to make is that the 5
owners groups provide a broad focus, including key 6
regulatory issues, and at the time of TMI, when most of us 7
-were formed, you know, clearly the effort was 100-percent 8
regulatory reactive-driven at that time.
9 We have moved to where we have a split -- and it's 10 different among the owners groups -- where we do have funding in place in time to work on discretionary items that 11 12 help us as utilities, as well as deal with regulatory 13 issues.
14-The second point I'd like to make is that the 15
. owners groups do produce high-quality products for a number 16 of reasons.
17 One :is that there is tremendous operational 18 experience that is brought to bear at the owners groups.
19 As you've heard, every utility that has a licensed 20 plant has representatives both at the primary group level as 21 well as subcommittee level.
We get the benefit of that 22 experience.
23 We have the benefit of direct NSSS involvement.
4 24 So, the technical expertise of the NSSS vendors is brought 25 to bear.
ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034
96 1
And there is extensive review and consensus 2
processes within the owners group workings that lead to a 3
very well-developed, high-quality product when we're done.
4 Clearly -- I think we talked about this earlier --
5 it's certainly an efficient use of resources.
6 Not only is there cost-sharing benefits but also 7
the benefit in just having common approaches to common 8
issues, and in terms of NRC staff, certainly, if they could 9
review an issue once generically, this is clearly a win-win 10 s'ituation.
11 And I think, collectively, we agree that, in the 12 almost 20 yearn that the owners groups have been in place, 13 the products have been highly effective in enhancing both t
14 safety as well as the reliability of our plants.
15 So, I thank you on behalf of my colleagues here i
16 for being able to make this presentation.
17 CHAIRMAN JACKSON:
Well, I would like to thank the
(
18 owners group representatives and the NRC staff for an 19 informative and full briefing on the many diverse activities l
l 20 and initiatives that the owners groups have contributed to.
21 In fact, I believe that your efforts have gone a 22 long way toward the resolution of a number of key safety 23 issues, and probably your success is due to your own 24 front-line experiences with design and operational issues at 25 the various licensee facilities and the fact that that l
i ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034
97 1
allows you to -- drawing on your own NSSS base, to provide 2
unique insights.
3.
But I thought I would kind of give you three 4
points I think we all need to continue to focus on.
5 First is to act promptly, and that's on our side 6
and your side, on safety issues, including. generic design 7
questions.
8 Secondly, which you're already focused on, but as 9
we go along, I think we have to continue to study and 10 resolve equipment aging issu'es.
11 And the third is to pursue risk-informed initiatives vigorously but to pursue them with the knowledge 12 13 that the initiatives can end up -- can cut both ways.
14 That is to say that they can provide regulatory 15 relief where it's justified, and will, I believe, but it can 16 also result in increased regulatory oversight where 17 warranted and.that it has to be a chips-fall-where-they-may 18 understanding.
19 But I encourage you to continue your efforts and 20 to actively participate along with our other stakeholders in 21 ensuring safe plant operations, and again, I thank you, and 22 unless my colleagues have any comments, we're adjourned.
23
[Whereupon, at 4:15 p.m., the meeting was 24 concluded.]
25 ANN RILEY & ASSOCIATES, LTD.
Court Reporters 1025 Connecticut Avenue, NW, Suite 1014 Washington, D.C.
20036 (202) 842-0034
~ -. _.
-o CERTIFICATE i
s l
This is to certify that the attached description of a meeting of the U.S. Nuclear Regulatory Commission entitled:
TITLE OF MEETING:
BRIEFING BY REACTOR VENDORS OWNERS GROUPS --
PUBLIC MEETING i
1 PLACE OF MEETING:
Rockville, Maryland DATE OF MEETING:
Tuesday, September 15, 1998 was. held as herein appears, is a true and accurate record of the' meeting, and that this is the original transcript thereof taken stenographically by me, thereafter reduced to typewriting by me or under the direction of the court i
reporting company l
Transcriber: Tamara Shion i
Reporter: _Mark Mahonev l
l
p#>9 RE %,
G i
s
%+++ e
- i NUCLEAR STEAM SYSTEM SUPPLY (NSSS)
OWNERS GROUPS September 15,1998 I
Rockville, MD Dr. Brian W. Sheron Acting Associate Director for Technical Review Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission i
l I
NSSS OWNERS GROUPS i
e Unique and Valuable Resource for Resolution of l
Technical Issues Applicable to a Specific Vendor Product Line l
9 Assist Utilities ir; Carrying Out Their Safety Function in an Effective and Efficient Manner O
Improvements in Operational Safety in a Cost-Effective
~
Manner e
Contribute Operational Experience and Technical l
Competence to the Discussion of Problems i
e Regulatory Response Group Capable of Quick l
Assessment of Emerging Safety issues l
O Direct Interface with the NRC l
2
j l
i NRCINTERFACE i
e NRR Project Manager Assigned to Each Owners Group to Serve as Focal Point for Actions j
e Management Meetings are Typically Held on j
a Semi-Annual Basis with Owners Groups e
Senior NRR Management Attend (Office Director, ADT, Division Directors) e Project Managers Provide Coordinated Review of Topical Reports and Vendor Specific issues j
o Efficient Utilization of Resources for NRC and Owners Groups 3
i
THE ROLE OF INDUSTRY e
DSI-13, " Role of Industry" - Encompasses Use of Standards and Industry initiatives for Efficient Use of Regulatory Resources l
e Meeting Planned with Stakeholders on Codes
& Standards and Industry Initiatives as a Result of Recent Commission SRM e Some Owners Group initiatives have Proactively Avoided the Need for NRC Generic Communications - NRC Then Monitors and Reviews Industry Actions 4
9
,~
_.m
RECENT SUCCESSES S
Generic Emergency Operating Procedures S
Standard Technical Specifications 1
4 Severe Accident Management Guidelines e
ECCS Suction Strainer and Net Positive Suction Head issues in General Electric Plants j
i 9
BWR Vessel and Internals Project i
e Baffle Barrel Bolting issue in Westinghouse Plants i
e Vendor Audits 5
l i
l
i i
t 1
SUMMARY
9 Owners Groups Have Been Doing a Good Job in Proactively Addressing issues i
e Sucesses Have Resulted in More Efficient Use of Licensee and Staff Resources, More Effective Solutions that Recognize Licensees' Unique
~
Knowledge of their Plants, and Therefore Reduced 1
' Burden to Both Licensees and Staff I
e Owners Groups are Encouraged to Continue to Proactively Address Regulatory and Safety issues 6
i w
l i
i i
i i
NSSS Owners Groups Chairmen l
Presentations to NRC Commissioners l
l September 15,1998 t
l l
l i
e l
Owners Groups l
l B&WOG i
l BWROG i
CEOG i
WOG l
All domestic operating plants are members
=
International utility participation
=
i NSSS Vendor participation j
=
l Planned 1998 expenditures approx. $35 Million
=
1 1
i 1
i i
4
1 m
Objectives
= Resolve common regulatory issues through:
. Committees
. Regulatory Response Groups (RRGs) o
= Address generic issues in a cost-effective manner Enhance communications Share "Best" practices Industry Relationships Owners Groups provide a vehicle for interacting with:
.NRC
. Routine senior management meetings
. Issue-specific meetings and correspondence
. NEI
. Quarterly Joint Owners Group Chairmen's meeting l
.NEI task force participation l
l l
[
2
\\
l l
\\
Industry Relationships
.INPO
+ Exchange ofinformation through designated points of contact
.EPRI
+ Exchange ofinformation through ussignated points ofcontact 1
4 Babcock and Wilcox Owners Group Presentation to NRC Commissioners Bill Foster, Chairman September 15,1998 3
organization Executive Committee Igg project orra R.ak Bened 4ptcehore Wbrkmg Group Reguietary Re&cten Workmg Gw D
I&C l
S pport Pe noe G retor RV W/G
- Volvo Workm3 Group
~ L~~' "*
= L~::.= ~
- Dcxw Redude TF Selected Activities Once Through Steam Generator Life Cycle Management:
= Alternate repair criteria for IGA & PWSCC
= SG integrity & internals generic letter responses SG tube pull project a
ECT production improvements
=
l l
I 4
e
Selected Activities Reactor Pressure VesselIntegrity:
. Irradiation of surveillance capsules a Materials testing
= Reactor vessel material analyses in compliance with 10CFR50
= Support ofindustry development of analysis and test methods i
r Selected Activities RCS Materials Activities:
= RV intemals bolting
= CRDM LifeX program
= Other alloy 600 issues Fuel post irradiation examination effort EOP deviation minimization effort Titanium inhibitor applications i
i 3
_ _ _ _.. _ _ _ _ _ _ _ _ _ _ ~.. - _ _ _ _. _ _. _ _ _.. _ _ _ _ _ _ _ _ _. _ __ _ _ _.__-
~
Recent Successes CRDM Motor Tube Cracking
= Developed issue assessment plan
= Inspected 77 B&WOG plant motor tubes (three different types) a Researched construction / material histories
= Completed preliminary safety assessment Recent Successes RV Internals Bolting Project
= Completed preliminary safety assessment a Developed comprehensive six-year plan
. Identified inspection, repair, and replacement techniques
. Evaluating IASCC issues a Developing potential internals inspection plan 6
p.
Recent Successes License Renewal Efforts
= Generic effort to support member applications
= RCS topical report approved by NRC
= Pressurizer topical report approved by NRC
= Reactor vessel topical report submitted to NRC
= Reactor vessel intemals topical report submitted to the NRC Boiling Water Reactor Owners Group Presentation to NRC Commissioners Tom Rausch, Chairman September 15,1998 1
N
l organization EXECUTIVE COMMITrEE EXECUTIVE OVERSIGHT COMMITTEE i
I Regulatory
Response
Group l
l CHAIRMAN Advisory Committee i
PRIMARY REPRESENTATIVES VICE CHAIRMAN Emerging issues Team 1
COMMITTEES l
l i
Activities
= Active executive oversight / involvement
= Priorities aligned with key issues; NRC issues considered key issues
= Flexible processes
. Generic and " Cafeteria-Style" participation
. Subsets of owners frequently work together
= Emerging issues process
. Accelerates action
. Proactive philosophy l
l
Selected Activities i
Reculatory issues safety. Operations & Maintenance ECCS Suction Strainers Emergency Procedure (Bulletin 96-03)
Guidelines NPSH issues (GL 97-04)
Scram Frequency Reduction Containment Coatings Outage Management j
Appendix R Circuit Analysis issues Turbine Outage Optimization MOV-Periodic Verification (GL 96-05)
BWR Maintenance Integrated Risk-Based Regulation Radiation Protection /ALARA (MOV, Maint. Prioritization, RGs/SRP). Reload Analysis & Core PSA Certification Management License Renewal i
Reactivity Controls Review e
4 Refueling Platform Air-Operated Valves i
i Selected Activities i
a j
Materials & InsDeCtlOns
- Improved water Chemistry
. FW nozzle inspection relief re:
2 NUREG 0619 i
j Utility-Driven Cost Effective initiatives
{
. Y2000 issues l
. GE turbine controls l
. Large breaker maintenance
{
. Design-bases issues 4
1 i
ii I
i
}
Recent Successes
= ECCS suction strainer & related activities
= Joint Owners' Group (JOG) MOV-periodic verification
= Integrated risk-based regulation
= PSA certification
\\
l 1
Recent Successes
= JOG Air-Operated Valves (AOVs)
Program
= Scram solenoid pilot valve diaphragms
= BWR stability
. Severe Accident Management (SAM)
10 l
Success Highlights High Exposure Channel Bow Issue
= Following owner notifications, GE evaluated and communicated to NRC and BWR owners
= Staff contacted BWROG Chairman requesting impacted plants, exposures and action plan
= GE provided requested information to NRC and determined issue to be oflow safety significance
= BWROG rapidly prepared monitoring program
= Continuing close communication with the Staff through issue closure 1
i l
Combustion Engineering Owners Group Presentation to NRC Commissioners David Pilmer, Chairman September 15,1998 11
.. - -.. ~ -. - ~ _
. ~. _.. -..
a organization Comednse l
I croc I
Ce l
l Analysis Opershees Maternals Chesustry Sebcomensese Subcomentare worldeg Group Sabrementare IJeessing lieseter ISTS Oseage Seheemedeme Weasel Coevereise Meengensat Wertues Groep Task Feeve Werknes Groep Sesem Prohetsbete lastroenessaaes Egeposes &
Geesrater
-Selety Assessmem
& Cesarets M
e l
Task Force martdes Groep wer6&as Groep Seheemmitee ADV Vaar 2000 Task Ferse Task Force l
Selected Activities
= Steam generator axial crack alternate repair criteria
= Development ofnumerous risk-based products:
. Revisions to technical specifications to extend allowed outage times for LPSI, SIT, EDG, HPSI, and CS
. Developed configuration lisk management program guidelines for members / indust <y
. PSA certification program
= Safety assessment for ECCS sump strainer performance i
12
\\
Selected Activities
= Plant performance improvement program to identify largest contributors to plant unreliability and equipment failures a Year 2000 readiness
= Outage readiness peer review program
= Development of risk informed IST and ISI programs
= Implementation ofimproved standard technical specifications
= Joint owners group program on AOV Recent Successes
= Generic emergency procedures and severe j
accident management guidelines
= Development ofimproved standard technical specifications a Numerous products to improve steam generator management including:
. In-situ pressure testing guidelines
. Steam generator defect database
. ECT flaw library 1
13
e e
Recent Successes e Initiatives on generic material integrity concerns:
. GL 97-01 on reactor vessel penetrations
. GL-97-06 on steam generator internals
. CEDM housing susceptibility to the defect found at Prairic Island 2 m Reactorvesselweldissues:
. Improved characterization of weld chemistry (best estimate Cu and Ni values)
. Direct measurement of fracture toughness
. Developed 22-day benchmark outage model I
(
Westinghouse Owners Group Presentation to NRC Commissioners Louis F. Liberatori, Jr., Chairman September 15,1998 14
1 1
i i
a 1998 Westinghouse Owners Group Organization Structure i.__.
I i -_.
- -- _ _ i
_:=_ -
. w_
i- _'
=
=
a I
i I
.=
=.
==
- =. =
'M Selecte'd Activities Regulatory Related a Part length CRDM housing issue
= High burn-up itel
= RVHP Alloy 600 PWSCC
= Shutdown regulations
. Increased break opening time a Core damage assessment methodology 15
Selected Activities Regulatory Related. cont'11
= Post accident sampling requirements
= GL 92-01 Revision 1 Supplement 1 (RVI)
= Improved technical specifications
= SG internals degradation
. License renewal Selected Activities Safetv/ Performance Enhancements Risk informed applications for ISI & IST a
PSA peer review
=
Baffle barrel bolting
=
= ERG /ARG maintenance Frac 31re toughness / master curve
=
RPVDATA database
=
16
i Selected Activities Safety / Performance Enhancements. cont'd
= Reactor coolant chemistry GOTHIC shutdown model s
a Guide tube replacement pin
=
ASIC based RPS module
=
Pressurizer thermal transients
=
Joint Owners Group AOV Program a
i Recent Successes Regulatory Response Group
=
. Resolution of the Incomplete Rod Insertion Issue
. Resolution of Part Length CRDM lscue Proactive management ofBBB issue
=
I Resolution of high burn up fuel issue for
=
licensed limit Implementation ofsevere accident
=
management guidelines i
i 17 i
s Recent Successes a Completion of boron credit in Spent Fuel Pool Program
= Completion of the Reactor Vessel Annealing Demonstration Program
= Completion of 4 Life Cycle Management System Engineer Field Guides a Completion of 15 License Renewal Generic Technical Reports 1
Closing
= Broad focus including key regulatory issues
= Produce high quality products:
. Operational experience
. NSSS Technical Expertise
. Review / consensus process e Achieve more efficient use of resources:
. Common licensee approaches
. One-time NRC reviews
. Highly effective in enhancing safety and reliability 18
l MM NSSS Owners Groups Chairmen Presentations to NRC Commissioners l
September 15,1998 Owners Groups B&WOG BWROG CEOG WOG
= All domestic operating plants are members
= International utility participation
= NSSS Vendor participation
= Planned 1998 expenditures approx. $35 Million 1
~
J i
Objectives a Resolve common regulatory issues through:
. Committees
. Regulatory Response Groups (RRGs)
= Address generic issues in a cost-effective manner
= Enhance communications
= Share "Best" practices Industry Relationships Owners Groups provide a vehicle for interacting with:
.NRC
. Routine senior management meetings
. Issue-specific meetings and correspondence
. NEI
. Quarterly Joint Owners Group Chairmen's meeting
.NEI task force participation 2
Industry Relationships i
4
)
.INPO l
. Exchange ofinfonnation through i
designated points ofcontact 1
1
. EPRI
. Exchange ofinformation through
)
designated points of contact 4
i i
l t
i l
i l
Babcock and Wilcox Owners Group i
l Presentation to NRC Commissioners 1
l i
Bill Foster, Chairman i
September 15,1998 i
i 4
1 i
k 3
i i
Organization Executive Commttee i
S*ng Project Offee
_ _ _ ~
... - - ~
f&C Pe rue Renew TF
ca =
a.
J=,
j -
~~
L. - -
_ v- - ~
_ swoveo
- U.n T-.
- Does Redman TF Selected Activities Once Through Steam Generator Life Cycle Management:
= Alternate repair criteria for IGA & PWSCC
= SG integrity & internals generic letter responses
= SG tube pull project i
ECT production improvements-
=
l l
4 f
1 Selected Activities I
Reactor Pressure VesselIntegrity:
= Irradiation of surveillance capsules a Materials testing
= Reactor vessel material analyses in compliance with 10CFR50
= Support ofindustry development of analysis and
^
test methods
-l 1
i n
Selected Activities RCS Materials Activities:
)
= RV intemals bolting i
= CRDM LifeX program
= Other alloy 600 issues Fuel post irradiation examination effort EOP deviation minimization effort Titanium inhibitor applications i
l j
5 t
Recent Successes CRDM Motor Tube Cracking
. Developed issue assessment plan l
s Inspected 77 B&WOG plant motor tubes (three different types)
= Researched construction / material histories
= Completed preliminary safety assessment
~
.~
Recent Successes RV Internals Bolting Project o Completed preliminary safety assessment a Developed comprehensive six-year plan
. Identified inspection, repair, and replacement techniques
= EvaluatingIASCC issues
= Developing potential internals inspection plan 6
Recent Successes License Renewal Efforts
= Generic effort to support member applications a RCS topical report approved by NRC
= Pressurizer topical report approved by NRC
= Reactor vessel topical report submitted to NRC
= Reactor vessel internals topical report submitted to the NRC Boiling Water Reactor Owners Group Presentation to NRC Commissioners Tom Rausch, Chairman September 15,1998 7
Organization EXECUTIVE COMMITTEE EXECUTIVE OVERSIGHT COMMITTEE i
t i
Regulatory
Response
Group l
CHAIRMAN Advisory Committee PRIMARY REPRESENTATIVES
~
VICE CHAIRMAN Emerging issues Team I
COMMITTEES Activities
= Active executive oversight / involvement
= Priorities aligned with key issues; NRC issues considered key issues
= Flexible processes
. Generic and " Cafeteria-Style" participation
. Subsets of owners frequently work together
= Emergingissuesprocess
. Accelerates action r
. Proactive philosophy l
8
Selected Activities Reaulatory issues Safety. Operations & Maintenance ECCS Suction Strainers j
e Emergency Procedure (Bulletin 96-03)
Guidelines NPSH lssues (GL 97-04)
Scram Frequency Reduction e
e Containment Coatings Outage Management e
e Appendix R Circuit Analysis issues Turbine Outage Optimization e
e MOV-Periodic Verircation (GL 96-05)
BWR Maintenance Integrated Risk-Based Regulation Radiation Protection /ALARA e
(MOV, Maint. Prioritization, RGs/SRP)
Reload Analysis & Core e
PSA Certification Management e License Renewal Reactivity Controls Review e
Refueling Platform e
Air-Operated Valves i
e Selected Activities Materials & Inspections improved water Chemistry e
FW nozzle inspection relief re:
NUREG 0619 Utility-Driven Cost Effective initiatives
. Y2000 issues
. GE turbine controls
. Large breaker maintenance
. Design-basesissues 4
9
4 Recent Successes
= ECCS suction strainer & related activities a Joint Owners' Group (JOG) MOV-periodic verification
= Integrated risk-based regulation
= PSA certification
[
Recent Successes
= JOG Air-Operated Valves (AOVs)
Program
= Scram solenoid pilot valve diaphragms a BWR stability
= Severe Accident Management (SAM)
10 i
I v
a
,.+
Success Highlights High Exposure Channel Bow Issue il
= Following owner notifications, GE evaluated and communicated to NRC and BWR owners
= Staff contacted BWROG Chairman requesting
]
impacted plants, e:cposures and action plan
= GE provided requested information to NRC and j
determined issue to be oflow safety significance
= BWROG rapidly prepared monitoring program j
= Continuing close communication with the Staff j
through issue closure l
i i
i j
Combustion Engineering l
Owners Group i
l Presentation to NRC Commissioners l
l David Pilmer, Chairman September 15,1998 1
1 I
i
)
1 A
11 i
1
.__m..
._.._.._...m_.__._._____
e Organization
~Comaidense 1
l CEOG l
sesering Presees commma Orme Auslysm Operstmas Materials Chemuery Seheemsstesse Seheemmitwe wwtse6 Gr**P 5eteemustee IJssesses herser IST3 Ossage Subsemassene vessel Coeversese Meessemese Werkseg Gesep Task Force w erWag Group Seeen Prebehibsek la ese Egespasse &
Geerreew
-sefray ^
& Ceeereas Mmeeresere Task Feree wechses Groep werheeg Groep
&nbeemmseme AOV Veer 2000 Task Force Task Feree
)
LF Selected Activities i
l
= Steam generator axial crack alternate repair criteria i
= Development of numerous risk-based products:
l
. Revisions to technical specifications to extend allowed outage times for LPSI, SIT, EDG, HPSI, and CS
. Developed configuration risk management program l
guidelines for membersTmdustry I
. PSA certification program i
= Safety assessment for ECCS sump strainer performance i
l I
l l
U
e l
1 Selected Activities i
l i
= Plant performance improvement program to identify largest contributors to plant unreliability and i
equipment failures j
= Year 2000 readiness 1
i
= Outage readiness peer review program j
= Development of risk informed IST and ISI programs l
= Implementation ofimproved standard technical j
specifications
= Joint owners group program on AOV l
1 l
l I
l
}
i i
l i
Recent Successes i
= Generic emergency procedures and severe accident management guidelines
= Development ofimproved standard technical specifications l
= Numerous products to improve steam i
generator management including:
l
. In-situ pressure testing guidelines 4
i
. Steam generator defect database
)
,. ECT flaw library i
i i
13 i
A
l Recent Successes e Initiatives on generic material integrity concerns:
. GL 97-01 on reactor vessel penetrations
. GL-97-06 on steam generator internals
. CEDM housing susceptibility to the defect found at Prairie Island 2
= Reactor vessel weld issues:
. Improved characterization of weld chemistry (best estimate Cu and Ni values)
. Direct measurement of fracture toughness a Developed 22-day benchmark outage model l
[
l b
Westinghouse Owners Group Presentation to NRC Commissioners Louis F. Liberatori, Jr., Chairman September 15,1998 l
l 54
_ _.. _. _ ~., _.. _.. _
. ~.. _. _.. _.. _.
t i
)
1998 Westinghouse Owners Group Organization Structure 4
i_ -
i _-
- _- _ i m
i _.- !
4 i
==.
e
^^
Seguas W
.=.
==
.y
=
4 1
)
i I
Selected Activities Regulatory Related j
= Part length CRDM housing issue l
= High burn-up fuel
= RVHP Alloy 600 PWSCC
= Shutdown reghlations
= Increased break opening time
= Core damage assessment methodology i
I l$
1 i
Selected Activities Regulatory Related. cont'd
= Post accident sampling requirements
= GL 92-01 Revision 1 Supplement 1 (RVI)
= Improved technical specifications
= SG internals degradation I
= License renewal i
s a
Selected Activities Safetv/ Performance Enhancements Risk informed applications for ISI & IST a
PSA peer review
=
Baffle barrel bolting
=
ERG /ARG maintenance
=
Fracture toughness / master curve
=
RPVDATA database
=
r 16
t 2
Selected Activities Safetv/ Performance Enhancements, cont'd
= Reactor coolant chemistry l
= GOTHIC shutdown model
= Guide tube replacement pin l
= ASIC based RPS module l
= Pressurizer thermal transients
= Joint Owners Group AOV Program i
l i
i Recent Successes 4
l
= Regulatory Response Group l
. Resolution of the Incomplete Rod Insertion Issue j
. Resolution of Part Length CRDM Issue j
= Proactive management ofBBB issue l
= Resolution of high burn up fuel issue for licensed limit j
= Implementation of severe accident management guidelines i
1 i
17 4
4
Recent Successes Completion of boron credit in Spent Fuel Pool
=
Program Completion of the Reactor Vessel Annealing
=
Demonstration Program Completion of 4 Life Cycle Management
=
System Engineer Field Guides Completion of 15 License Renewal Generic
=
Technical Reports i
l Closing Broad focus including key regulatory issues
=
Produce high quality products:
=
. Operational experience
. NSSS Technical Expertise
. Review / consensus process l
= Achieve more efficient use of resources:
. Common licensee approaches l
. One-time NRC reviews
. Highly effective in enhancing safety and reliability 18
~
l l
gn reg l
h 4
%*e i
NUCLEAR STEAM SYSTEM SUPPLY (NSSS)
OWNERS GROUPS J
September 15,1998 Rockville, MD Dr. Brian W. Sheron Acting Associate Director for Technical Review Office of Nuclear Reactor Regulation i
U.S. Nuclear Regulatory Commission l
i i
NSSS OWNERS GROUPS O
Unique and Valuable Resource for Resolution of l
Technical Issues Applicable to a Specific Vendor I
Product Line e
Assist Utilities in Carrying Out Their Safety Function in an Effective and Efficient Manner e
improvements in Operational Safety in a Cost-Effective Manner e
Contribute Operational Experience and Technical Competence to the Discussion of Problems e
Regulatory Response Group Capable of Quick Assessment of Emerging Safety Issues e
Direct Interface with the NRC 2
s L
NRCINTERFACE e
NRR Project Manager Assigned to Each j
i Owners Group to Serve as Focal Point for Actions e
Management Meetings are Typically Held on l'
a Semi-Annual Basis with Owners Groups e
Senior NRR Management Attend (Office Director, ADT, Division Directors) j i
e Project Managers Provide Coordinated Review l
of Topical Reports and Vendor Specific issues e
Efficient Utilization of Resources for NRC and Owners Groups j
f 3
I
THE ROLE OF INDUSTRY e
DSI-13, " Role of Industry" - Encompasses Use i
of Standards and Industry Initiatives for Efficient Use of Regulatory Resources I
e Meeting Planned with Stakeholders on Codes
& Standards and Industry initiatives as a Result of Recent Commission SRM e Some Owners Group initiatives have Proactively Avoided the Need for NRC Generic Communications - NRC Then Monitors and Reviews Industry Actions
.l
[
RECENT SUCCESSES i
e Generic Emergency Operating Procedures 9
Standard Technical Specifications l
l 9
Severe Accident Management Guidelines O
ECCS Suction Strainer and Net Positive Suction l
Head issues in General Electric Plants O
BWR Vessel and Internals Project l
9 Baffle Barrel Bolting issue in Westinghouse Plants i
e Vendor Audits 5
I
SUMMARY
i e
Owners Groups Have Been Doing a Good Job in l
Proactively Addressing issues O Sucesses Have Resulted in More Efficient Use of Licensee and Staff Resources, More Effective Solutions that Recognize Licensees' Unique Knowledge of their Plants, and Therefore Reduced Burden to Both Licensees and Staff i
l e Owners Groups are Encouraged to Continue to i
Proactively Address Regulatory and Safety issues i
6 3