Forwards Insp Repts 50-324/88-27 & 50-325/88-27 on 880716- 22.Violation Noted Under Consideration for Escalated Enforcement Action.Enforcement Conference Scheduled for 880908
ML20151Z751
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 08/17/1988
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML20151Z754 List:
References
NUDOCS 8808300124
Download: ML20151Z751 (2)


See also: IR 05000324/1988027

Text

s

a

'

" '

AUG 171988

b

Docket Nos. 50-325, 50-324

License Nos. OPR-71, DPR-62

Carolina Power and Light Company

ATTN: Mr. E. E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. O. Box 1551

Raleigh, NC 27602

Gentlemen:

SUBJECT: AUGMENTED INSPECTION TEAM REPORT NOS. 50-325/88-27 and 50-324/88-27

This refers to the special inspection conducted by the NRC Augmented Inspection

Team (AIT) during the period July 16-22, 1988. The inspection included a

review of the equipment failure that precipitated the shutdown of Unit 1 on

July 13-15, 1988, and a review of those equipment failures that occurred during

the shutdown and their impact on both units. At the conclusion of the inspec-

tion, a debrief on the inspection findings was conducted with members of your

staff. A formal exit will be conducted with you and members of your staff on j

August 18, 1988. .

1

The enclosed copy of the AIT report identifies the areas examined during this

review. Within these areas, the inspection consisted of selective examinations

of procedures and representative records, interviews with personnel, and

observation of activities in progress.

The equipment failures reviewed by the AIT are, individually, not of high safety

significance. However, the number of failures and the previous high failure

rate of plant equipment indicates that management has tolerated operation of I

the facility with unreliable equipment. The AIT identified that not only does

the licensee need to correct the pattern of equipment failures for the purpose

of minimizing challenges tc safety systems, but also needs to recognize the

detrimental effects of unreliable equipment on operator morale and effectiveness.

The inspection findings also indicate that certain activities appeared to l

violate NRC requirements. The violation described in Section III.A of the  ;

enclosed report is under consideration for escalated enforcement action. '

Accordingly, a Notice of Violation is not enclosed and no response to this

violation is required at this time. However, please be advised that the

characterization of this violation may change as a result of further NRC

review. An Enforcement Conference to discuss this violation is scheduled for

September 8,1988. You will be advised by separate correspondence of the

results of our deliberations on this matter.

l

l

0

PDRG903300124 880017 '

ADOCK 05000324 l

PDC

.

r

', AUG 171988

,

Carolina Power and Light Company 2

In accordance with 10 CFR Part 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

We appreciate your cooperation during our team inspection and subsequent

evaluation of the equipment failures related to the Unit 1 shutdown. Should you

have any questions concerning this letter, please contact us.

Sincerely,

J. Nelson Grace

Regional Administrator

Enclosure:

AIT Inspection Report

cc w/ encl:

M. A. McDuffie, Senior Vice President

P. W. Howe, Vice President

Brunswick Nuclear Project '

J. L. Harness, Plant General Manager

bec w/ encl: )

NRC Resident Inspector '

Document Control Desk i

'

F. Miraglia, NRR

S. Varga, NRR

E. Adensam, NRR

B. Buckley, NRR

C. E. Rossi, NRR l

W. Lanning, NRR

E. Jordan, AE0D

R. L. Spessard, AE00

W. Troskoski, ED0

W. Kane, RI

E. Greenman, RIII

J. Callen, RIV

D. Kirsch, RV

State of North Carolina

RII RII RI RII

PFrFdricfson:tj DVerrelli Reyes AGibson GJenkins rn t

08/g/88 08/g /88 08// 788 08/G88 08/l7 /88 ' 08/O/88

1

-.

_

-

s

- kQ Croo UNITED STATES

~'

/ o NUCLEAR REGULATORY COMMISSION

[ "(

a

n

0

REGloN ll

101 MARIETTA STREET,N.W.

E' -O *) f ATLANTA, GEORGI A 3o323

' %.J c5

.....

AUGMENTED INSPECTION TEAM

REPORT NOS. 50-325/88-27 AND 50-324/88-27

Licensee: Carolina Power-and Light Company

P. O. Box 1551

Raleigh, NC 27602

Docket Nos.: 50-325 and 50-324

License Nos: DPR-71 and DPR-62

Facility Name: Brunswick Units 1 and 2

Inspection Members: B. C. Buckley, Project Manager, NRR

C. A. Casto, License Examiner, RII

E. N. Fields, Reactor Engineer, NRR

P. J. Fillion, Reactor Inspector, RII

L. W. Garner, Senior Resident Inspector, RII

R. L. Lloyd, Reactor Operations Engineer, AE00

H. K. Shaw, Senior Mechanical Engineer, NRR

P . Taylor, Reactor Inspector, RII '

Team Leader: J 3 .n--

P. E. Fredrickson, Chief

/7!Y

Oate Signed

'

Projects Section 1A, RII