Forwards SALP 5 Board Repts 50-373/85-01 & 50-374/85-01 for May 1984 - Sept 1985.Ratings Show Decline in Operational Performance
ML20151Y945
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 02/11/1986
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20151Y949 List:
References
NUDOCS 8602130226
Download: ML20151Y945 (2)


See also: IR 05000373/1985001

Text

_

DrnB

,

FEB;; pgg

Docket No. 50-373

Docket No. 50-374

Commonwealth. Edison Company

ATTN:

Mr. Cordell Reed

Vice President

Post Office Box 767

Ch;cego, IL 60690

Gentlemen:

Enclosed for your review, prior to our scheduled meeting of February 18, 1986

is the SALP 5 Board Report for the LaSalle County Nuclear Power Station, covering

the period May 1, 1984 through September 30, 1985.

In accordance with NRC policy, I have reviewed the SALP Board assessment and

concur with the ratings.

These ratings clearly show a decline in operational

-performance at the LaSalle station over the assessment period, which is a matter

of significant concern to me.

In fact, I would have to rate the LaSalle

regulatory performance as one of the lowest in Region III.

I would like to

highlight the following items:

1.

LaSalle received a Category 3 rating in four f mctional areas including

all three functional areas directly involved with operations (plant

operations, maintenance / modifications, and surveillance / inservice

testing).

Furthermore, the performance trend within the assessment

i

period for the maintenance and surveillence areas declined, while the

trend for the operations area was mixed.

A Category 3 rating was also

given for the area of quality programs and administrative controls.

Performance in the area of radiological controls, although it remained

a Category 2 rating, also declined.

2.

LaSalle received two Category 1 ratings (in fire protection / housekeeping

and in startup testing) and in both cases this was an improvement

over the Category 2 rating achieved in the previous assessment

period.

Throughout the SALP period, we have had several meetings to discuss. specific

problem areas that have arisen at the LaSalle plant.

To aid in our understanding

i

of operations at LaSalle, we conducted a special Task Force review of LaSalle

operations and, as a result, issued a 10CFR 50.54(f) letter on November 22,

1985 describing our concerns.

In that letter we requested that you evaluate

i

five major areas of concern:

1) adequacy of management structures and practices;

2) adequacy of the maintenance and modification programs; 3) adequacy of

control of work activities; 4) adequacy of the implementation of the Regulatory

L

Performance Improvement Plan; and, 5) adequacy of the resources committed to

L

the LaSalle County Station.

We have received your response and have it under

review. We believe that corrective actions to address these broad concerns

will also substantially address the findings of this SALP report.

Consequently,

we are not asking you to specifically respond to this letter and report.

8602130226 860211

^

ig

i

PDR

ADOCK 05000373

\\{H

G

PDR

Ni

'

.-

-

- ,... .__-

..

a

Commonwealth Edison Company'

2

FEB 1 1 1986

You will have an opportunity to present your comments on the SALP. report at the

meeting on February 18, 1986. We also will consider any written comments received

within 30 days after the meeting.

'In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

' Title 10, Code of Federal Regulations, a copy of this letter and the SALP

Report will be placed in NRC's Public Document Room.

Sincerely,

Original signad by

'Ja'mes#d.U d$ler

f8

Regional Administrator

Enclosure:

SALP 5 Board Reports

No. 50-373/85001;

No. 50-374/85001

cc w/enclosura:

D. L. Farrar, Director

of Nuclear Licensing

G..J. Diederich, Plant

Manager

DCS/RSB (RIDS)

Licensing Fee Management Branch

. Resident Inspector, RIII

Phyllis Dunton, Attorney

General's 0ffice, Environmental

Control Division

J. M. Taylor, Director, IE

H. R. Denton, Director, NRR

Regional Administrators

RI, RII, RIV, RV

N. J. Palladino, Chairman

J. K. Asselstine, Commissioner

.

F. M. Bernthal, Commissioner

T. M. Roberts, Commissioner

L. W. Zech, Commissioner

NRR Project Manager

R. M. Bernero, NRR

J. Axelrad, IE

RIII PRR

RIII SGA

-State Liaison Officer,

State of Illinois

INP0

'

l

3-Ib4(

RIII

RII

RIII

RIII

RII

III RIII

RIII

.

spKe

c

nz/jlk

gh

Ch

otimos N

us

er

o

D

er

DeFayette

.&/94