. 'i'
'
SAFEGilARDS INFORMATION
-
'
.
AUG 191988
Docket Nos. 50-335, 50-389
>
Florida Power and Light Company
ATTN: Mr. W. F. Conway
Senior Vice President - Nuclear
P. O. Box 14000
Juno Beach, FL 33408-0420
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT N05. 50-335/88-20 AND 50-389/88-20
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
Ms. O. Masnyk on August 3, 1988.
The inspection included a review of
activities authorized for your St. Lucie facility,
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during t% inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
,
and representative records, interviews with personnel, and observation of
i
activities in progress.
The inspection findings indicate that certain activities appeared to violate
NRC requirements.
The violations described in the enclosed inspection report
are under consideration for escalated enforcement action.
Accordingly, no
Notice of Violation is being issued at this time and no response to this
letter is required.
However, please be advised that the number and
characterization of violations described in the enclosed inspection report may
]
change as a result of further NRC review.
An Enforcement Conference to
discuss these violations has oeen scheduled for September 6,1988.
You will
be advised by separate correspondence of the results of our deliberations on
this matter.
In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and
i
security measures are exempt from public disclosure.
Therefore, the enclosure
to this letter with the exception of the report cover page, which presents a
nonexenipt sunnary, will not be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
f
P
G
J. Nelson Grace
\\\\
Regional Administrator
f.
\\
"
Enclosure:
(See page 2)
% $,,,,a w,,,vi
ccoum um.m.vaetm* d
htormsum Whert teparated from
SAFEGUARDS INFORMATION
- ~'**-*"d***""
,
4-
'.4
SACUARDS INFORMr'ON
'
.
AUG 191988
'
Florida Power and Light Company
2
l
Enclosure:
'
NRC Inspection Report
(SafeguardsInformation)
cc w/ enc 1:
K. N. Harris, Vice President
St. Lucie Nuclear Plant
G. J, Boissy, Plant Manager
J. 8. Harper, Site QA Superintendent
bec w/ enc 1:
NRR/DRIS/SB
bec w/ Inspection Summary:
NRC Resident Inspector
Document Control Desk (RIDS IE04), 016
State of Florida
.
JM
A
m(
vF4
,
Masnyk: tm
DMcTufre
ClinJ
PStohr
RCrignjak
08/W88
08//o/ 8
08//y88
08/i7/88
08/t*/88
RII
R
RII
r
RI
RII
o.
ko'ddaff
r
Kins
Mf8st
W son
es
08/(f/88
/g/88
08/ /88
'T>/88
- '08/n/88
/
,
.
b5E?
.2:
SAFEGUARDS INFORMA
'
'*
.
.
-
-