ML20151Y585

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-321/87-31 & 50-366/87-31.Response to Violation a Clarifies Concerns & Will Be Deleted from NRC Records
ML20151Y585
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 08/12/1988
From: Gibson A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
References
NUDOCS 8808260471
Download: ML20151Y585 (2)


See also: IR 05000321/1987031

Text

_

.

._

.

_

-

. _

_ _

_

__

J.

m

.

-

-

s

,

August 12, 1988

Docket Nos. 50-321, 50-366

License Nos. DPR-57, NPF-5

Georgia Power Company

ATTN: Mr. W. G. Hairston, III

Senior Vice President -

Nuclear Operations

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-321/87-31 AND 50-366/87-31

Thank you for your response of July 5,1988, to our Notice of Violation

issued on May 31, 1988, concerning activities conducted at your Hatch facility.

We have evaluated your response to Violation A and have concluded that your

response clarifies our concerns.

This violation will be deleted from our

records and no additional response is required.

We have evaluated your response to Violation B. reg (arding inadequate post

maintenance testing on the _ Reactor Water Cleanup

RWCU) system inboard

isolation valve 1G31-F001 on December 25, 1984, and found that it meets the

requirements of 10 CFR 2.201.

We will examine the implementation of your

corrective actions during future inspections.

We have evaluated your response to Violation B regarding post modification-

testing after installing a- 45 second time delay in the RWCU system high

differential flow isolation logic.

Your response clarifies our concerns.

This part of Violation B will be deleted from our records and no additional

response is required.

We appreciate your cooperation in this matter.

Sincerely,

c

t

gg

(Original signed by A. F. Gibson)

,

emo

58'

Albert F. Gibson, Director

og

Division of Reactor Safety

$o

a

ec:

R. P. Mcdonald, Executive Vice

50

President, Nuclear Operations

o$

J. T. Beckham, Vice President,

$4

Plant Hatch

m

H. C. Nix, Plant Manager

5

g'O

0. M. Fraser, Site Quality Assurance

(QA) Supervisor

L. Gucwa, Manager, Nuclear Safety

and Licensing

bec:

(Seepage 2)

x,-

w

t,o

...

'.

,

.

Georgia Power Company

2

August 12, 1988

bec: !iRC Resident Inspector

DRS, Technical Assistant

Hugh S. Jordan, Executive Secretary

Document Control Desk

State of Georgia

3

e.

%

w

% gk

ro

K

s

GAEfelisle

M51nkule

fBrownlee

CAJu an AFGi) on

08/0//88

08/{ /88

08/'/88

08/g/88

08/gd/88 08/

8

g

-