ML20151Y196
| ML20151Y196 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 09/02/1998 |
| From: | Dave Solorio NRC (Affiliation Not Assigned) |
| To: | Cruse C BALTIMORE GAS & ELECTRIC CO. |
| References | |
| TAC-M99222, TAC-MA1108, TAC-MA1109, NUDOCS 9809180148 | |
| Download: ML20151Y196 (4) | |
Text
_
September 2, 1998 Mr. Charl::s H. Crusa, Vice President i
Nuclear Energy Division Baltimore Gas and Electric Company 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702
SUBJECT:
REQUEST FOR ADDITIONAL. INFORMATION FOR THE REVIEW OF THE CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT NOS.1 & 2, INTEGRATED PLANT ASSESSMENT REPORT FOR THE SAFETY INJECTION SYSTEM (TAC NOS. MA1108. MA1109, AND M99222)
Dear Mr. Cruse:
By letter dated March 3,1998, Baltimore Gas and Electric Company (BGE) submitted for review the Safety injecticn System (5.15) integrated plant assessment technical report as attached to the " Request for Review and Approval of System and Commodity Reports for License Renewal." BGE requested that the Nuclear Regulatory Commission (NRC) staff review the Safety injection System (5.15) report to determine if this report meets the requirements of 10 CFR 54.21(a), " Contents of application-technicalinformation," and the demonstration required by 10 CFR 54.29(a)(1), " Standards for issuance of a renewed license," to support an application for license renewalif BGE applied in the future. By letter dated April 8,1998, BGE formally submitted its license renewal application.
The NRC staff has reviewed the Safety injection System (5.15) report against the requirements of 10 CFR 54.21(a)(1),10 CFR 54.21(a)(3). By letter dated April 4,1996, the staff approved BGE's methodology for meeting the requirements of 10 CFR 54.21(a)(2). Based on a review of the information submitted, the staff has identified in the enclosure, areas where additional information related to scoping is needed to complete its review. Should the staff have additional information needs related to aging management they will be forwarded under a separate correspondence.
Please provide a schedule by letter or telephonically for the submittal of your responses within 30 days of the receipt of this letter. Additionally, the staff would be willing to meet with BGE prior to the submittal of the responses to provide clarifications of the staff's requests for additionalinformation.
Sincerely, MMN David L. Solorio, Project Manager License Renewal Project Directors.te Division of Reactor Program Management Office of Nuclear Reactor Regulat.on Docket Nos. 50-317 and 50-318 s
Enclosure:
Request for Additionalinformation i
mhk cc w/ encl: See ned page
\\J PlSTRIBUTION:
See next page DOCUMENT NAME G1 WORKING \\SOLORIO\\SI RAI LTR LA:PDI-) g PDLR/DQPM Df4R/DRP)(ASC PDLR/DRPM:D OFFICE NAME SLittle@
DSolor$.h BPratk CGrimes @$
DATE 9 /d/98 7/ 238
[/
/9b 1/ 1 /98 C
OFFICIAL RECORD COPY hh 9807180148 980902 DR ADOCK 050003 7
]
t I
- Mr. Charles H. Cruse Calvert Cliffs Nuclear Power Plant l
Baltimore Gas & Electric Company Unit Nos.1 and 2 i
cc:
Mr. Joseph H. Walter, Chief Engineer President
' Public Service Commission of Calvert County Board of Maryland i
Commissioners Engineering Division 175 Main Street 6 St. Paul Centre Prince Frederick, MD 20678 Baltimore, MD 21202 6806 i
I
' James P. Bennett, Esquire Kristen A. Burger, Esquire 1
Counsel Maryland People's Counsel Baltimore Gas and Electric Company 6 St. Paul Centre -
P.O. Box 1475 Suite 2102 Baltimore, MD 21203 Baltimore, MD 21202-1631 Jay E. Silberg, Esquire Patricia T. Bimie, Esquire Shaw, Pittman, Potts, and Trowbridge Co-Director 2300 N Street, NW
. Maryland Safe Energy Coalition i
Washington, DC 20037 P.O. Box 33111 Baltimore, MD 21218 Mr. Thomas N. Prichett, Director WRM Mr. Loren F. Donatell Calvert Cliffs Nuclear Power Plant NRC Technical Training Center 1650 Calvert Cliffs Parkway.
5700 Brainerd Road Lusby, MD 20657-4702 Chattanooga, TN 37411-4017 Resident inspector David Lewis U.S. Nuclear Regulatory Commission Shaw, Pittman, Potts, and Trowbridge P.O. Box 287 2300 N Street, NW St. Leonard, MD 20685 Washington, DC 20037 Mr. Pichard I. McLean Douglas J. Walters Nuclear Programs Nuclear Energy Institute Power Plant Research Program 1776 l Street, N.W.
Maryland Dept. of Natural Rcsources Suite 400 Tawes State Office Building, B3 Washington, DC 20006-3708 Annapolis, MD 21401 DJW@NEl.ORG j
Regional Administrator, Region l Barth W. Doroshuk U.S. Nuclear Regulatory Commission Baltimore Gas and Electric Company
'475 Allendale Road Calvert Cliffs Nuclear Power Plant King of Prussia, PA 19406 1650 Calvert Cliffs Parkway NEF 1st Floor Lusby, Maryland 20657 o
a
D 8
Distribution:
HARD COPY Ms PUBLIC PDLR R/F-MEl-Zeftawy DISTRIBUTION: E-MAIL-FMiraglia (FJM)
- JRoe (JWR)
DMatthews (DBM)
CGrimes (CIG)
L l
TEssig (THE)
Glainas (GCL)
- JStrosnider (JRS2)
GHolahan (GMH) i Si4ewberry (SFN)
GBagchi(GXB1)
RRothman (RLR)
JBrammer (HLB)
CGratton (CXG1)
JMoore (JEM)
MZobler/RWeisman (MLZ/RMW)
_ SBajwa/ADromerick (SSB1/AXD)
LDoerflein (LTD)
BBores (RJB) -
SDroggitis (SCD)
RArchitzel(REA)
CCraig (CMC 1)
LSpessard (RLS)
RCorreia (RPC)
RLatta (RML1)
EHackett (EMH1)
AMurphy (AJM1)
' TMartin (TOM 2)
DMartin (DAM 3)
GMeyer (GWM)
WMcDowell (WDM)
SStewart (JSS1)
- THiltz (TGH)
.SDroggitis (SCD) -
DSolorio (DLS2)
PDLR Staff -
TCollins (TEC)
RCaruso (RXC)
MRazzaque (MMR1)
. Slittle (SLL)-
n REQUEST FOR ADDITIONAL INFORMATION CALVERT CLIFFS NUCLEAR POWER PLANT. UNIT NOS.1 & 2 SAFETY INJECTION SYSTEM INTEGRATED PLANT ASSESSMENT. SECTION 5.15 DOCKET NOS. 50-317 AND 50-318
$_ection 5.15.1 - Scopina 1.
10 CFR 54.21 (a)(1) states that valve bodies are passive. Page 5.15-12 identifies 29 device types as having only active functions, solenoid valves being one of these 29 components. The drawing on page 5.15.6 and 5.15.7 show solenoid valve bodies being within the evaluation boundary. Provide a justification for not including the pressure boundary function of solenoid valve bodies as being within the scope of the aging management review.
2.
Page 6.3 3 (Rev.18) of the Calvert Cliffs Nuclear Power Plant (CCNPP) Updated Final Safety Analysis Report (UFSAR) indicates that there is a small drain valve controlled remotely from the Control Room, which is intended to drain any leakage from the reactor coolant system into the safety injection system. Was this drain valve subjected to an l
aging management review (AMR)? If so, provide a cross reference to where this is addressed in the license renewal application (LRA). If not, provide the basis for exclusion.
3.
Page 6.3-14 (Rev. 21) of the CCNPP UFSAR indicates that the containment sump suctions are enclnsed by particulate screens. Are these screens included within the l
AMR? If so, provide a cross reference to where they are addressed in the LRA. If not, i
provide the basis for exclusion.
l i
Enclosure i