ML20151X615

From kanterella
Jump to navigation Jump to search
Proposed Tech Spec Tables 3.3.7.4-1, Remote Shutdown Sys Instrumentation & Controls & 4.3.7.4-1, Remote Shutdown Sys Instrumentation Surveillance Requirements, Adding RHR Svc Water High Radiation Indicating Light
ML20151X615
Person / Time
Site: Limerick Constellation icon.png
Issue date: 04/28/1988
From: Bradley E
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20151X602 List:
References
NUDOCS 8805040197
Download: ML20151X615 (3)


Text

.'

'ol .

zo J TABLE 3.3.7.4-1 -

c. .

83 ~ REMOTE SHUTDOWN SYSTEM INSTRUMENTATION AND CONTROLS 7$ MINIMUM c' INSTRUMENTS MINSTRUMENT OPERABLE eOS ONly 1. Reactor Vessel Pressure 1 e 2. Reactor Vessel Water Level 1

$ 3. Safety / Relief Valve Position, 3 valves 1/ valve 3 4. Suppression Chamber Water Level 1 9.

5. Suppression Chamber Water Temperature (Actually RHR Pump "A" Suction Temperature) I g 6. Drywell Pressure 1 4 7. Drywell Temperature 1

~

8. RHR System Flow I
9. RHR Service Water Pump Discharge Pressure 1
10. RHR Heat Exchanger Service Water Outlet Pressure 1
11. RCIC System Flow I t' 12. RCIC Turbine Speed 1

[ 13. Emergency Service Water Pump Discharge Pressure 1 b 14. Condensate Storage Tank Level 1

15. RHR Heat Exchanger Bypass Valve (HV51-1F048A) Position Indication (0 - 100%) 1
16. RCIC Turbine Tripped Indication 1
17. RCIC Turbine Bearing 011 Pressure Low Indication 1
18. RCIC LP Bearing 011 Temperature High Indication 1
19. RHR Heat Exchanger Discharge Line High Radiation Indication 1
20. RHRSW Loop 'A' Return High Radiation Indication 1 l

TABLE 4.3.7.4-1 -

REMOTE SHUTDOWN SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS ,-

'1 CHANNEL CHANNEL INSTRUMENT CHECK

  • CALIBRATION ,
1. Reactor Vessel Pressure M R
2. Reactor Vessel Water Level M R
3. Safety / Relief Valve Position, 3 valves M NA r 4. Suppression Chamber Water Level M R

$ 5. Suppression Chamber Water Temperature M R 3 6. Drywell Pressure M R R

7. Drywell Temperature M R g 8. RHR System Flow M R 4 9. RHR Service Water Pump Discharge Presrure M R

~

10. RHR Heat Exchanger Service Water Outlet Pressure M R
11. RCIC System Flow M R
12. RCIC Turbine Speed M R
13. Emergency Service Water Pump Discharge Pressure M R R 14. Condensate Storage Tank Level M R

[ 15. RHR Heat Exchanger Bypass Valve (HV51-1F048A) Position Indication (0 - 100%) M R h 16. RCIC Turbine Tripped Indication M R

17. RCIC Turbine Bearing 011 Pressure Low Indication M R
18. RCIC LP Bearing 011 Temperature High Indication M R
19. RHR Heat Exchanger Discharge Line High Radiation Indication M R
20. RHRSW Loop 'A' Return High Rad'etion Indication M R j
  • Cor. trol is not required to be transferred to perform this CHANNEL CHECK.

(-~ ,

n/

UNITED STATES OF AMERICA NUCLEAR REGULATORY CobtMISSION In the Matter of  : Docket No.: 50-352 PilILADELPilIA ELECTRIC COMPANY  :

(Limerick Generating Station,  :

Unit No. 1)

CERTIFICATE OF SERVICE 1 he reby certify that copies of the foregoing Application f or Amendment of Facility Operating License NPF-39 in the above captioned matter were served on the following by deposit in the United States Mail, first-class postage prepaid, un the J day of r, / , 1988.

William T. Russell, Regional Administrator U. S. Nuclear Regulatory Commission Region 1 631 Park Avenue King of Prussia, PA 19406 T. J. Kenny, Resident Inspector U. S. Nuclear Regulatory Commission Senior Resident Inspector P. O. Box 47 Sanatoga, PA 19464 Thomas Gurusky, Director Bureau of Radiological Protection Department of Environmental Resources P. O. Box 2063 liarrisburg, PA 17120 I

d EugenfJ.4radley Attorney for l Philadelphia Electric Company j l

i

!