ML20151X418

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-267/88-13 on 880601-30 & Notice of Violation
ML20151X418
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 08/19/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20151X423 List:
References
NUDOCS 8808250351
Download: ML20151X418 (2)


See also: IR 05000267/1988013

Text

- _ _ _ _ .__ _

, ,

-

A[S l 9 @

'

in Reply Refer To:

Docket: 50-267/88-13

Public Service Company of Colorado

ATTH: Robert 0. Williams, Jr.

-

vice President, Nuclear '

Operations

2420 West 26th Avenue,-Suite 15c

Denver, Colorado. 80211

.Gentiemen:

p This refers to the. inspection conducted by Messrs. R. E. Farrell and

j R. P. Mallikin of this office during the period June 1-30, 1988, of activities

i authorized by NRC Operating License DPR-34 for the Fort St. Vrain Nuclear

Generating Station, and to the discussion of our findings with you and other

members of your staff at the conclusion of the inspection.

~

Areas examined during the inspection included followup of licensee action on NRC

bulletins, operational safety verification,-followup of allegations, equipment

qualification temperature profile, monthly maintenance observation, monthly

surveillance observation, radiological protection, and monthly security

observation. Within these areas, the inspection consisted of selective

examination of procedures and representative records, interviews with personnel,

and observations by the inspectors. The inspection findings are documented in

the enclosed inspection report.

During this inspection, it was found that certain of your activities were ir,

violation of NRC requirements. Consequently, you are required to respond to

this violation, in writing, in accordance with the provisions of Section 2.201

of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Your response should be based on the specifics contained in the Notice of

Violation enclosed with this letter.

The response directed by this letter and the accompanying Notice is not subject

to the clearance 3rocedures of the Office of Hanagement and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Original Sigw] Bp

1.; J. CALLAN

L .I J. Callan, Director

Division of Reactor Project

Enclosures: (seenextpage)

RI S

/ REFarrejl/ld

PI h

RPMullikin

PS/B

TFWesterman

AC [

MEEmersop

t

LJCallan

I" Er@lVF [r TI fI' (r!&!dY 911/D 15 /\ % I \

8808250351 800019

PDR ADOCK0500g7

/ d

i

>

_ . .

..

_ _ . _

.

-

.~ 9 _,.

.

.. .

_

. . .

~

Public Servic'e ' Company of Colorado -2-

-

$p_ -

Enclosures-

1. Appendix A - Notice of Violation-

- 2. Appendix B - NRC Inspection Report

50-267/88-13

cc>w/ enclosures:

Manager, Nuclear

-Production Division

Fort St. Vrain Nuclear Generating Station -

'

16805 WCR 19 1/2

"

- Platteville,_ Colorado- 80651

P. Tomlinson,~ Manager,-Quality

~ Assurance Division

(SameAddress)

Colorado Radiation: Control Program Director-

Colorado Public Utilities' Conunission-

bec to DMB (IE01)

'

bec distrib. by RIV:

  • DRP- R. D. Martin, RA
  • RRI- Lisa Shea, RM/ALF
  • SectTonChief(DRP/B)

'

  • RIV File
  • RPSB-DRSS *RSTS OPERATCR
  • MIS System * Project Engineer, DRP/B
  • DRS *K. Heitner, NRR Project Manager

M. Emerson (2)

  • w/766